Memorabilia of Shanghai Pena Machinery Co., Ltd.

20 10.03. 12 in order to improve the production capacity and product quality of rail vehicle hooks, the company invested 5 million yuan to purchase a machining center and a fully CNC lathe, which entered the company at the end of June 2009 and was officially put into production after installation, debugging and acceptance.

2010.0101In order to improve the core competitiveness of the products, the company formally established the "Technology Research and Development Center".

In 2009. 12.3 1 2009, the company achieved sales of nearly 200 million, and the output value and benefits reached a record high.

2009. 10.29 was awarded the title of "High-tech Enterprise" in Shanghai, valid for 3 years.

On August 27th, 2009, the design and manufacture of MMGL 15000-4, the largest electro-hydraulic multi-lobe garbage grab in China, was completed. Grab bucket volume15m3, delivered to customers on February 20 10.

July 0, 20091According to the market changes and the adjustment needs of the company's internal management, the structure of the production system was adjusted again, from the original three divisions to two divisions: the fixture division remained unchanged, and the original SMAG project division and the non-standard division merged into the non-standard division. At the same time, set up a strategic purchasing department in the company.

On February 27th, 2009, the design and manufacture of super-heavy underwater dredging grab VSWG200.0-3.0-2 1000 was completed. The self-weight of this grab is115t, which is one of the largest underwater dredging grab in China. It was handed over to Guangzhou Waterway Bureau for use. .

2008. 12.3 1 Due to the global financial crisis, the price of raw materials rose sharply. In 2008, the company's sales increased by 25% compared with 2007, but the production efficiency dropped sharply, and the profit was only about 50% of that in 2007.

2008. 12.20 Affected by the global financial crisis, the company's contracted orders also showed a sharp downward trend in the second half of the year, and the fourth phase of the company's capacity expansion was suspended after about 60% was completed. The company's indoor production site is nearly10.5 million square meters, covering an area of about 35 thousand square meters, which is three times that of the company when it opened.

11.28, 2008 The first domestic scissors-type ore grab SCG45.0-2.4/2.8-12300/10600 was manufactured and delivered to Baosteel.

August, 200814 In order to strengthen the company's material management, the company established the material management department.

July 0, 20081In order to meet the needs of market development, the company made major adjustments to its organizational structure. According to the product category, the production system is divided into three divisions, namely fixture division, SMAG project division and non-standard division.

2007. 12.3 1 A new product developed in that year-straw clamp, with small batch production scale. This product has been put into normal use in many biomass power plants in China. In 2007, the annual sales increased by 28% over the previous year, and the realized profit increased by 20% over the previous year, which was the highest since the company opened. .

2007. 12.29 In order to strengthen the management of production plan, the company formally established the production preparation department.

2007.11.21With the approval of the local government, the company was officially renamed as "Shanghai Pena skeat Machinery Co., Ltd.". Prior to this, the company's share transfer, joint venture contract, revised articles of association and other related matters have been approved by the government.

In 2007.11.15, the company newly leased 5,400 square meters of land and began to implement the fourth capacity expansion.

July 0, 20071Due to the rapid business development, the newly expanded1500m2 cold working welding workshop was officially put into production.

July 0, 20071Adjust and improve the production system framework, and the production department has three workshops: steel structure workshop, machining and assembly workshop; Product maintenance workshop.

3 1, the third capacity expansion was completed in may 2007, and 2580 square meters of production workshops were added.

On March 17, 2007, the company celebrated its 10th anniversary. Nearly 100 guests from home and abroad came to the company to attend the celebration. Complete the development and manufacture of the first straw seeder in China.

On February 28th, 2007, the company began to expand its production capacity for the third time.

In 2006. 12.3 1 The annual output value and profit were basically the same as that of the previous year, and it continued to maintain the leading position in the domestic grab industry.

2006. 12. 16 completed the design, manufacture and sales of the first new 40-foot simple container spreader.

On March 3, 2006, the third and fourth phases of the second capacity expansion were completed. Build a new 1400 square meter large grab assembly workshop to expand the production capacity of locomotive and rolling stock hooks.

In March and June 2006, the first new 20-foot simple container spreader was manufactured and sold.

On February 26th, 2006, 1 wireless remote control grab was manufactured.

In 2005, the annual sales of12.3/kloc-0 was1.1.09 million yuan. The annual output value exceeded 1 100 million yuan for the first time, and the net profit reached a record high. In China grab industry, it is in the leading position in the same industry, no matter from the annual output value and benefit of enterprises, or from the variety, quantity and quality of products and the coverage of domestic market.

2005. 10. 15 completed the second capacity expansion (1-2). Newly expand the blanking workshop and warehouse, and rebuild the company's staff dining room and bathroom. The company covers a total area of 20,000 square meters, which is twice that of the company when it was founded.

On June 4th, 2005, the amount of orders received by the company in that year exceeded 1 billion yuan (1 billion yuan) for the first time.

On June 8, 2005, the company signed the 1000 mechanical grab contract.

On March 30th, 2005, the company name was changed from Shanghai Fan Qi skeat Bena Machinery Co., Ltd. to Shanghai Bena skeat Machinery Co., Ltd.

2004. 12.3 1 the company's sales and benefits in 2004 more than doubled compared with the previous year, and the company's production, operation and management began to embark on a virtuous circle.

2004. 12.30 The first batch (Iranian project) of subway car hooks was officially delivered.

On September 30, 2004, the locomotive and rolling stock hook manufacturing workshop was officially put into production.

On August 30th, 2004, the electrical steel coil fixture was manufactured.

In August and February, 2004, the production of large billet fixture EMBZ68 was completed.

May 2004 14 completed the manufacture of MMRG3200-3, the largest electro-hydraulic rectangular grab in China.

May, 200410 Due to the rapid business development, the newly expanded 1500 square meter cold working electric welding workshop was officially put into production.

In 2007.11.15, the company newly leased 5,400 square meters of land and began to implement the fourth capacity expansion.

On March, 2004/KOOC-0/5, the largest coal grab ASG92.0-0.8-60400 (crane 92t volume 60.4m3) and ore grab ASG 92.0-2.5-/KOOC-0/8920 (lifting capacity 92t volume/KOOC-0/8.9m3) were completed. , used in Japanese ports.

On September 9, 2003,19 was recognized as "foreign-invested advanced technology enterprise" by Shanghai.

In September and April, 2003, the company passed the welding qualification certification of European locomotive and rolling stock steel structure (SLV certification DIN6700-2) and started the trial production of locomotive and rolling stock hook.

In February and June, 2003, it was rated as "Science and Technology Progress Enterprise" by Qingpu District.

September, 2002.13 The company passed the ISO900 1 quality system certification.

On August 8, 2002, the company was formally included in the List of Government Procurement Suppliers in China.

200 1.06.07, the company passed the European crane steel structure welding qualification certification (SLV certification DIN 18800-7, DIN 150 18).

On April 20th, 2000, the manufacturing of two KL36T-28M marine cranes was completed for the first time, and they were shipped to Krupp Company in Germany at the end of July.

The first heavy-duty underwater dredging grab made in China, VSWG 100.0-2.5-4000, was completed on October/October, 2000. This time, * * * made two heavy-duty underwater dredging grab boats, which were handed over to the Yangtze River Waterway Bureau for use in February.

On February 27th, 2009, the design and manufacture of super-heavy underwater dredging grab VSWG200.0-3.0-2 1000 was completed. The self-weight of this grab is115t, which is one of the largest underwater dredging grab in China. It was handed over to Guangzhou Waterway Bureau for use.

1999.03.3 1 completed the first domestic electro-hydraulic multi-flap garbage grab. This time, * * * manufactured four electro-hydraulic garbage grabs, including two MMGL 1200-4 and two MMGL2500-4, which were used by garbage disposal enterprises in Taiwan Province Province.

Company 1997.03. 18 officially opened; After trial production, the first batch of grab products (4 scrapped electro-hydraulic grab MMG2000-3 and 2 mechanical ore grab VSG34.5) were put into production at the same time, and the preliminary preparations were completed.

1996.11.20 company trial-produced grab products.

1996.03.0 1 the company preparation office was established.

1995.08. 15 the state administration for industry and commerce issued the business license of the enterprise and the company was formally established.

1995.07.30 "Shanghai Fan Qi skeat Pena Machinery Co., Ltd." was established with the approval of the Shanghai Municipal People's Government, and the Certificate of Approval for Foreign-invested Enterprises in People's Republic of China (PRC) was issued.

1995.07.03 after nearly two years of negotiations, four investment enterprises involved in the establishment of a joint venture formally signed the joint venture contract and articles of association and other relevant documents in Shanghai.