Work summary of construction unit staff (5 selected articles)

1. Work summary of construction unit staff

I was recruited to work in the project management department of the company on December 10, __. From the engineering construction unit to the engineering construction unit, although my job position and role have changed a lot, and it is also my first contact with the "Zhejiang Provincial Construction Project Budget Quota", with the care of the leaders and the help of my colleagues, I have been able to achieve the goal with my own strength. With his professional foundation and work experience, coupled with hard work and study, he quickly adapted to the work environment and achieved good results. The work situation is briefly summarized as follows:

1. Personal profile

Studied in the engineering cost major in the Real Estate Department of Hunan Urban Construction College; July 19__-__ In July, he worked in the Fourth Engineering Co., Ltd. of China Railway 19th Bureau Group, engaged in budget preparation and review, contract management, bidding management, etc.; in October __, he participated in and passed the National Cost Engineer Qualification Examination.

2. Main work performance and achievements

1. Strictly abide by the company's rules and regulations. At the beginning of work, I carefully studied various rules and regulations such as "Veco Outline", "Daily Behavior Standards for Real Estate Segment Employees", "Basic Management System", "Job Function Description", etc., and kept them in mind, always reminding myself to Strictly abide by the company's rules and regulations and maintain the company's image. For example, insist on arriving at the company early every day, cleaning the office, and creating a clean working environment for colleagues.

2. Carefully study the budget preparation materials of Zhejiang Province. Although the principles of budget preparation are the same, the "Zhejiang Province Construction and Installation Project Quotas" are very different from the highway and railway project quotas that I have been exposed to more before. Therefore, I first carefully and systematically studied the Zhejiang Province budget preparation materials, and insisted on studying while working. I quickly mastered the essentials and was able to independently complete the tasks assigned by the leadership; at the same time, I also In my spare time, I learned to use Shenji Miaoshu software to prepare budgets and Luban software to calculate steel bars, which greatly improved work efficiency. In the future work, I will continue to explore and study to make the work more precise and perfect.

3. The review of the final accounts of the winding workshop and temporary projects of the Dunhuang Branch of Veken Essence Group Co., Ltd. is progressing smoothly. Although the winding workshop and temporary projects have been completed for a long time, the relevant completion data is very incomplete, which brings great difficulties to the final accounts review work. After I took over this job, on the one hand, I actively asked the construction unit to improve the completion data, and on the other hand, I used the existing data at hand to calculate the project quantity and check various data. In order to accurately grasp the project situation and ensure the accuracy of calculations, I also went to the site to check carefully. Through my efforts, this work has made rapid progress. Most of the information required for the project final account review has been collected, and the budget of the winding workshop has been verified with the construction unit.

4. Actively proceed with the civil engineering review of the commercial and residential building on Lot 5 Huayan Street. After the leader assigned me to be responsible for the review of the civil construction budget of the project, I took the time to familiarize myself with the construction drawings and related materials, and went to the construction site many times to understand the situation, so that I could grasp the static and dynamic conditions of the project in the shortest possible time. In order to better protect the company's interests and gain the initiative in the final accounts, I have advanced the engineering quantity calculation work to the current stage. After a period of intense and orderly work, the calculation of part of the basement project has been completed. In addition, I also carefully completed the review of the progress payment budget for the two months of December __ and January __ and the project contact orders that occurred in the previous period. Among them, the budget was reduced by 461,321 yuan in December __. In January, a reduction of 163,723 yuan was approved, which was affirmed by the department leaders.

5. Other aspects:

① Actively make reasonable suggestions to leaders, such as cost control and data management.

②Actively discuss cost control, contract management, data management, etc. with colleagues. Through discussions, we not only enhance the friendship between colleagues, but also improve our own business capabilities.

③ Actively communicate with colleagues and enthusiastically help others.

④ Actively participate in various activities organized by the company, such as participating in party member studies and New Year party performances.

3. Direction of efforts

1. Make full use of the advantages of passing the National Cost Engineer Qualification Examination and previous work experience, proactively contact various related businesses, and improve one's own practical experience operational capabilities and make due contributions to the company's brand building.

2. Actively participate in self-study undergraduate examinations, study professional skills, and improve business capabilities and professional standards.

3. Give full play to the exemplary and leading role of party members and strive to be advanced.

In short, although I have achieved some results in the past three months, there is still a certain gap from the leadership's requirements. In the future, I will further strengthen my study, work hard, give full play to my personal strengths, and make due contributions to the company's greater success.

2. Summary of the work of construction unit staff

Time flies, and unknowingly, more than 20 years of working life as a construction project construction worker have been spent. Since I have been involved in construction projects for 20 years, I have been working as an intern and constructor in the project department. Over the years, I have been able to work independently as a construction worker and complete the project in an orderly manner. Therefore, I get along well with the managers of the project department and gain trust. . Recalling that I have been both busy and productive in my work as a construction worker over the years, I will briefly summarize this year’s work below:

1. Project Quality Management

As Engineering construction personnel not only need a lot of professional knowledge, but also need certain on-site experience and necessary business capabilities to control and coordinate the team. I have benefited a lot from quality management work at construction sites over the years. Carry out advance control work to prevent and eliminate hidden construction hazards. Before the start of the project, be fully familiar with the construction drawings, participate in the drawing review activities of the design institute, participate in the preparation of special construction plans and quality and technical handover cards based on the actual project and the requirements of the national quality acceptance specifications, and guide the team workers in their operations seriously and seriously.

Do a good job in supervision, discover and correct problems existing in the construction, conduct a comprehensive inspection of the project quality, and promptly raise and correct problems that arise during the construction. Conduct full-process follow-up inspections of the construction process of special processes to ensure that each process is qualified, cooperate with the civil engineering technicians of the project department to inspect and solve various situations that occur during the concrete pouring process, and make timely rectifications to ensure that the construction quality of each link is up to standard. . Through my diligent inspection and strict quality control, every construction link was praised by the company's leaders, and I also led the management staff of the brothers' project department to come and learn.

I will summarize and analyze the construction problems that occurred afterwards to facilitate continuous improvement of the work. After every day of construction, find out the problems that are likely to occur in the future and the merits of the construction process, and write them in the construction diary; participate in weekly supervision meetings, project department meetings and monthly owner coordination meetings, and have a clear understanding of how to work. Ensure the achievement of substantive results and summarize them, and continuously improve personal business level; submit weekly and monthly reports to the company on time, carefully reflect the quality problems existing on site and the problems that need to be coordinated and solved by the company, and organically connect the company and the project department together.

Through my own continuous learning, I have a clearer idea of ??all aspects of on-site construction. In the __ hotel project, I worked very conscientiously, gave up my personal rest time, performed due diligence on inspection and management, and promptly corrected problems existing in the construction. I made important contributions in this project and was recognized and recognized by Party A's supervisor. Good reviews.

2. Preparation of as-built drawings of the project

Be familiar with the actual construction content on site and help the internal team to report the changes (including drawing review issues, design change notices, and engineering business contact sheets) ) contents are organized into as-built drawings. As-built drawings can concretely reflect the actual construction content and are traceable, providing data basis for future settlement and completion.

3. Study hard and improve self-cultivation

As time goes by and technology continues to advance, I feel that the lack of knowledge will affect my future work results. I use my spare time to Read a lot of professional books, explore and learn new technologies and new inventions. At the same time, I lead other managers in this project department to learn professional knowledge together, starting from basic basic knowledge, and let technicians learn new norms, new standards and new processes with me. , and constantly improve their professional quality, so that the construction strength and technical strength of this project department will grow together.

IV. Shortcomings and improvements

In future construction management work. I also deeply understand the existence of success and shortcomings. To this end, in the future engineering management work, I will continue to study the business seriously, learn with an open mind, improve business and diplomatic skills, master deeper knowledge and technology, humane management of the project department, focus on the cultivation of employee skills, and collective employee With mutual care and a good corporate atmosphere, I believe that I will grow into a truly outstanding engineer in the development of the project department family!

3. Summary of the work of construction unit staff< /p>

In the past year, with the diligent efforts of all employees in the installation department of the construction company, they have overcome various difficulties and successfully completed the construction tasks of various projects. In order to do better work in the future, accumulate experience and make up for the shortcomings, The work in 20__ is now summarized.

1. Management

The life of a construction enterprise lies in the market. Without the market and without construction tasks, it will inevitably decline, and quality is the guarantee for the survival of the enterprise. We are ensuring that the project Under the premise of construction quality, a good reward and punishment system has been established. Main construction personnel who save materials, save man-hours and have excellent quality projects will be financially rewarded and listed as candidates for advanced producers.

At the beginning of 20__, the piece-rate work system was included in the work management plan. For sub-projects that can be constructed on a piece-rate basis, the construction personnel will contract to the team leader in sections according to the quota workload accumulated during the construction. In construction, with the implementation of the piece-rate system, the enthusiasm of construction personnel has been greatly improved in projects where this system is implemented. On the premise of ensuring quality, the construction progress of the project has been greatly accelerated.

2. Project construction

Due to the intensive construction period of each project main body and the shortage of electrical construction personnel, we have used mutual scheduling, coordination or coordination among the water, electricity and heating construction personnel. One person takes care of multiple projects to ensure the smooth progress of the project without affecting the overall progress of the entire project. During construction, conflicts between the elevation of the entry pipe and the elevation of the foundation ring beam often occur. Sometimes the pipes are forced to change their original direction when installed here. Some pipes have to be laid close to the foundation ring beam. When the foundation sinks, Pipelines may even break due to stress; in order to completely prevent such incidents from happening, all project drawings are compared with civil structural drawings, and any problems found will be resolved through consultation with Party A and the designer in a timely manner.

In the early stage of construction, we organized technicians and construction crews from each plumbing and heating team to carefully consider and study the content of the drawings, analyze the electrical circuit by circuit and the heating and plumbing pipe by pipe, and at the same time compare the civil construction drawings Analyze whether there are any contradictions in the elevation, location, and floor plan and elevation markings. If there are any doubts, promptly contact the supervisor and Party A, and require the designer to give a timely and accurate reply and form a written change document or drawing. Joint review record; during construction, technicians will draw the acceptance drawing of the concealed project of wall casing in advance against the construction drawings of various majors, and compare it with the construction. After construction, the supervisor and Party A will be notified in a timely manner to compare the construction drawings one by one with the construction drawings. Verify the location and elevation, form a hidden acceptance record, and complete the signatures to ensure the smooth progress of the project.

In the process of construction management, our department conducts strict inspection and supervision of each construction project based on the construction process regulations, promptly raises any problems found, and stops work for repairs when necessary to make on-site operators aware that Project quality is the life of an enterprise and a major issue related to people's lives and property safety. The construction team should understand that project quality is produced, not inspected. We always put construction quality first, use technology and management to combine, pay close attention to project quality management, pay close attention to the quality of engineering materials, strictly implement construction process regulations, and diligently inspect and supervise to improve the production skills of the team. Use the reward and punishment system to improve project quality.

3. Material management

In view of the current situation where most projects are supplied by Party A and the profits of installation projects are extremely limited, we realize that only from the management of materials and the Only with the estimator's working ability can it be possible to increase the profit margin of the installation project.

Therefore, our installation office strictly implements the material management methods formulated at the beginning of the year. By comparing the actual quantity of materials shipped out of the warehouse with the quantity of materials in the budget and final accounts, we can discover the waste or loss of materials, and reward the main construction personnel of the project who save materials. For projects with serious waste or loss of materials, fines will be imposed on the main construction workers on the construction site based on the actual amount of materials lost. This truly achieves clear distinctions between rewards and penalties, and improves workers' awareness of saving materials while ensuring quality, so as to ultimately create a good economy. Benefit purpose.

The comparison process between the quantity of materials in the budget and final accounts and the quantity of materials shipped out of the warehouse can prevent the estimator from omitting the project quantities. In the case of discrepancies in the quantity of materials, the estimator and construction personnel must compare the drawings and calculate at the same time. The process of calculating project quantities can improve the accuracy of estimators in calculating project quantities and strengthen their ability to understand drawings, thereby avoiding missing items and calculations, improving the estimator's professional quality and ensuring the accuracy of budgets and final accounts.

This year our installation and construction department overcame various difficulties and formulated a piecework system. Through the joint efforts of cadres and employees, we finally successfully completed the company's handover quota and the employees' year-end allocation tasks. , in terms of achievements, we must make persistent efforts and continue to carry forward our good work style and traditions.

4. Summary of the work of construction unit staff

The year of __ is about to go away with us. Looking back on this extraordinary year, I am filled with emotions. There is hard work and exhaustion; there is success and failure; there is dedication and gain; there are insights and experiences. Never forget the past and remember the future. At this year-end update, we especially summarize the successes and failures of __ years in the hope that in the new year, we can use our strengths and avoid weaknesses, eliminate the bad and make the best, and give full play to our personal abilities. , show a new edge in your position and make greater and more brilliant achievements. Here’s the summary:

1. Be down-to-earth, forge ahead, study hard, and don’t be ashamed to ask questions. This is the necessary psychological condition for all those who are capable and want to be successful. It will also be my attitude towards my future work.

1. When I first arrived at the Lanting construction site, everything was basically new to me. Facing a new and unfamiliar working environment, I was walking on thin ice. I didn’t have much self-confidence at that time, so all I could do was listen more and think more. Take the time to adjust your mentality and face the challenges of new people and new things. You can only dare to accept them without any retreat, because then there will be no turning back if you take a step back. Therefore, in the shortest possible time, I adapted to this new environment, understood my own engineering process, and assumed my due responsibilities.

2. Continuous self-replenishment, self-absorption, and self-improvement are the inexhaustible driving force for my own development. When I first arrived at Lanting, I only had theory and not much practical experience. In the past six months, I have always insisted on continuous learning. During this period, I fully understood the entire action process of the fine decoration project, the basic work network structure, and understood the construction Through the operation process, I experienced the management work mode of large-scale decoration projects, and learned certain post-maintenance technology and management experience.

3. You must learn to survive in order to develop. Especially on construction sites, I feel it is particularly important to protect oneself, enrich and improve, and strive to survive. In more than half a year, in the same working area and the same working environment, I saw with my own eyes no less than 10 people in the management staff of our project department left. It is true that there are many people who left their jobs due to job transfers, but most of them were eliminated because of shortcomings in work attitude, work ability, personal character, interpersonal relationships, etc. When I saw familiar figures leaving me one after another, an inexplicable sense of anxious competition was deeply embedded in my mind.

4. Be able to accept challenges in the experience of hard work and hard work, be able to keep a clear mind in adversity, clearly look for the reasons for things, and consider the consequences of the consequences. It is an essential quality for all those who are interested in success. I have been exploring this aspect and have gained a lot of experience.

2. Being measured, adhering to principles, keeping a low profile, and acting in a high profile are the basic directions and guidelines for my future work.

1. Even if the trees are beautiful in the forest, the wind will destroy them.

This is true in ancient and modern times. I never thought that when I first showed my talents, I would arouse suspicion and dissatisfaction from others so quickly. They said that it is useless to show your talents to others. How could I not understand? I am just too busy with 10 to 12 jobs. It was suffocating, working on the line every day, and I had no time to pay attention to the eyes and moods of my colleagues, so a mentality that was not arrogant was exaggerated by the meddlers, and I became an arrogant person. That incident inspired me a lot: sometimes just doing things without saying anything can offend people.

2. When dealing with local leopards, there must be softness within the hardness, and hardness within the softness. The contractor is an inevitable product of the abnormal social development in China. Since it is a product of the abnormal social development, it must have its wildness and abnormality. Inviting you to eat, drink, give gifts and gamble is a special culture on the construction site, and it is also the secret weapon of the local leopards. It takes ten extra hours to calculate an extra twenty square meters, and then gives you a tip. I despise this kind of behavior from the bottom of my heart. , at the beginning, my true nature was really revealed. There were only two sides to everything, horizontal and vertical, and I never compromised. But gradually I found that it didn’t work, and I even found it difficult to move forward. Some people said that I was noble, some scolded me for not knowing how to promote, and some sued me. I benefited from it. Only then did I realize that the construction site documents were the essence of all the principles of survival and development in China. I couldn't resist. Since I couldn't be rigid, I had to compromise.

3. Without real diamonds, no matter how high the management level is, it will still be a paper tiger in the eyes of workers. During the nearly two months of maintenance at Lanting, I truly realized that as a manager, you must improve your construction level and technical level based on your management aspects. In the later maintenance, although I have certain Although I have good management authority and a certain level of maintenance, I still encountered a lot of resistance at work, including conflicts with workers and disagreements with Party A. I think there are two reasons for this: first, because I am young and have little experience; second, I don’t have two brushes that I can really use.

4. Keep a low profile at all times, even if success is in sight, even if fame rises, even if there is thunderous applause, even if flowers are everywhere. Otherwise, all efforts may be in vain. This is well proved by our former great man.

5. A person’s success is inseparable from good interpersonal relationships, and also lacks the support and guidance of qualified people. I am now well versed in this and am working hard to expand in this area.

3. Be wise, trustworthy, brave and strict, make prompt decisions, do not trust others if you doubt them, and trust them when you use them. This is the courage and mind that a qualified manager must have and should have.

1. If you want to establish a certain prestige among management and workers, you cannot just rely on power and status. You also need to have a high degree of integrity and a superb management art, which is a far-reaching and difficult knowledge. If you want what you say to count, it is not only an honor, but also a kind of recognition from others. When I first took over as the person in charge of post-maintenance work, I clearly felt that it was difficult to move forward, disobeying orders and disobeying arrangements. These must give me enough ability to overcome resistance and accept challenges.

2. Be able to sympathize with your colleagues and care for your subordinates. When the pot is full, the basin should also be full. Only by being able to advance and retreat together with those who are willing to serve you, and share the joys and sorrows, Only then can you control it easily, command with ease, and dare not disobey orders. During those turbulent years, I was the first one to arrive at the construction site every day, and worked overtime until at least nine o'clock every night, without interruption for three months. While I was having a hard time, I also experienced the pleasure of success and harvest.

3. You must have the courage to take responsibility. This is not only a personality issue, but also a testament to management level. When I first arrived at the construction site, what impressed me the most was those construction workers. When there was a problem with the construction procedures and construction level, they always blamed each other. In the end, the blame was placed on the data clerk, saying that there was no data clerk to show him the relevant changes. Information or change notice! Even if you don't take responsibility, blaming others is really despicable. In the later maintenance process, I also made mistakes due to my management negligence, carelessness, and lack of experience, and there was a certain degree of loss. However, I did not escape or shirk those mistakes. I immediately paid attention to the master workers. Say that the responsibility is mine, and let them do it with confidence. To this day, I still pay part of the money to buy materials myself. If you can't shoulder a small responsibility, how can you be worthy of a big responsibility? This is what I always tell myself.

5. Summary of the work of construction unit staff

In the blink of an eye, I have been in the company for more than a year and have been struggling on the front line of construction. In the long-term work, I have developed In order to work hard and work hard, I love construction management work. I am proactive in my work and work hard to study construction technology. I have successively undertaken: __ Distribution Center Project with a construction area of ??__㎡. This project won the title of "Provincial Safety and Civilization" "Excellent construction site" title, ___ Technical College__#, __# residential building project, this project won the title of "Provincial-level safe and civilized excellent construction site", __ Cultural Street Area C and D, this project is a group project, __ Garden __# residential building project, construction area __㎡, this project won the title of "Provincial Safety and Civilization Excellent Construction Site", __ Garden Community Project, construction area __㎡, this project won the title of "Provincial Safety and Civilization Excellent Construction Site" "Construction Site", "Municipal Quality Structure Cup" and other titles.

As a construction worker who has been working for many years, I have been constantly enriching my professional knowledge. With a truth-seeking, pragmatic, down-to-earth work attitude, I have explored in practice and actively developed through experience. Innovate and continuously improve your work capabilities. While completing multiple projects, I also improved myself and achieved myself to a certain extent. Now, I have summarized a series of my own growth and shortcomings, hoping to face work with a newer and stronger look in the future.

1. Executing job responsibilities

As a manager of the project department, I attach great importance to controlling the construction quality of the project, coordinating with the construction unit and supervision unit, as well as the management coordination and automatic cooperation of the team The Safety Department completes various safety management tasks and pays close attention to material management to save project costs. The following important aspects are explained:

1. Project quality management. Every construction project is required to have high standards and a high starting point. In the early stage of construction, attention should be paid to technical briefings to the team, giving the team members ideological attention, and technically understanding the quality, progress, and safety requirements of the project, laying a good foundation for later construction.

2. Management and coordination of the team. Pay attention to the training of each team leader. At each meeting, I try to make each comrade take the dominant position at least once in response to the problems in construction cooperation to increase his experience so that each comrade can take charge of his or her own role and handle various issues. This kind of problem can improve the overall professional skills level of the entire team.

3. Safety management work. During the work process, automatically cooperating with the Safety Department to complete the safety management and education of construction personnel is an integral part of each project management.

4. Coordination with construction units and supervision units. As a construction manager, I attach great importance to the cooperation and coordination with the construction unit and supervision unit in each project. I take the lead in researching and implementing the good suggestions put forward by the construction unit and supervision unit, and strive to win unanimous praise from the construction unit and supervision unit. It is a reflection of the continuous progress of construction workers' work.

5. Technical management. The requirements for construction technology are more stringent. Construction drawings and construction specifications must be carefully studied to ensure construction quality. While studying, the construction key points, construction methods and penalty regulations must be recorded so that no omissions are missed in the technical explanation. Try to anticipate in advance. Solve them in advance, and put forward specific requirements to the construction team at the beginning of each stage of construction for some key issues, especially emphasize the seriousness of the problem and patiently explain to them the requirements in the specification

2. Existences in the work Problems

1. On my own side, I sometimes don’t consider the problem comprehensively, blindly follow the opinions of the construction team and draw conclusions without analyzing the incident in detail, thus causing unnecessary losses. In terms of management: There was no severe punishment for teams that did not obey orders or perform construction according to requirements. Over time, individual construction teams developed a lucky mentality, which led to management out of control in the later management work, which also resulted in the arrangement of work Difficult, on-site management is difficult. In future management work, we must first clarify our own position, give full play to the leading role of project managers at the construction site, make rewards and punishments clear for the construction team, form a leadership method that is absolutely centered on the project department, and punish those who do not obey orders. The construction team will never be merciful and carry out strict crackdowns and strict grasps to establish construction prestige.

2. In terms of construction technology, there are still deficiencies due to construction experience.

The failure to accurately and quickly find out the problems existing in the construction at the construction site, and the failure to use the construction drawings and construction specifications flexibly and skillfully caused the actual construction process and the theoretical construction to derail, that is, the construction did not meet expectations. The effect also complicates the construction procedures, thereby increasing the construction cost. The lesson this taught me is that in the future construction process, I must not do whatever I want. I must be familiar with the construction drawings and construction specifications and master them well, and strive for better results. Apply construction specifications to on-site construction.

3. Future work plans

By summarizing past work, find out the shortcomings in the work so that they can be overcome in future work. At the same time, you also need to read more books and study hard. Master the norms, procedures and relevant documents, master professional knowledge, improve your work ability, strengthen your sense of work responsibility, and complete all personal tasks in a timely manner.

In short, in the future work, I will continue to summarize and reflect, constantly push myself and enrich my energy, improve my own quality and professional level, so as to adapt to the development of the times and enterprises, and to be in line with my favorite work. The construction industry makes progress and grows together.