How to declare the photovoltaic subsidy in Zhuhai?

The application scope of the project includes: ordinary photovoltaic power plant projects or industrial and commercial distributed photovoltaic power generation projects that are connected to the grid in 2020 or promised to be connected to the grid in 2020, projects that have been declared to be connected to the grid at a fair price in 2020, and affordable wind power, photovoltaic power generation and bidding grid-connected projects in our province announced by the State 20 19 (Development and Reform Office Energy [2019] No.594) Ordinary photovoltaic power station projects refer to projects with installed capacity of 6 MW and above, and industrial and commercial distributed photovoltaic power generation projects refer to local development, nearby utilization and single point except household photovoltaic power generation projects.

Details: Guangdong 2020 State Subsidized Photovoltaic Power Generation Project Application Scope

Second, the reporting conditions

To declare a project, the following conditions must be met:

(1) The project has been put on record.

(2) Commitment to grid connection in 2020 or grid connection in 2020.

(3) Having access and consumption conditions.

(four) the implementation of the project land (site) construction conditions. The ground construction of photovoltaic projects must sign a lease agreement and obtain the support of the government (department) at or above the county level, and shall not occupy basic farmland, and shall not involve ecological red lines and other restricted development areas and other areas that are not allowed to be built by the state; For photovoltaic projects built by buildings, the buildings used must be self-owned (provide real estate license) or sign a lease agreement.

Details: Guangdong 2020 State Subsidized Photovoltaic Power Generation Project Application Conditions

Third, the application materials

The following certification materials are required to declare the project:

(1) Project filing documents.

(two) the project plan (declaration) production time (click to download) or grid-connected documents issued by power grid enterprises (provided by grid-connected projects in 2020).

(3) On-grid tariff declared by the project (click to download).

(four) the approval document of the power grid access system report (provided by the centralized photovoltaic power station).

(5) Description and commitment of the project unit on the performance of adopting technical standards, environmental protection and safety and quality management (click to download).

Documents certifying the implementation of the land (site).

Please provide the following materials for projects using ground buildings:

1. Proof of the implementation of land use rights (click to download).

2. Supporting documents (with inflection point coordinates) issued by governments (departments) at or above the county level, including land types, implementation of comprehensive service guarantee system and supporting policies (click to download).

3. Support opinions and governance requirements issued by land property owners and management and right-to-use units for building photovoltaic projects using land (click to download).

Please provide the following materials for projects relying on building construction:

1. Documentary proof of implementing the right to use the site (click to download).

2. Support opinions and governance requirements for building photovoltaic projects using the site issued by the site property owner and the management and use right unit (click to download).

Detailed information: List of application materials for state-subsidized photovoltaic power generation projects in Guangdong Province in 2020.

Fourth, the quotation requirements

For declared projects (including spontaneous self-use, surplus online mode and full online mode), according to the relevant provisions and requirements of the Notice on Estimated Online Bidding, the declared online electricity price is 0. 1 pct/kWh as the minimum quotation unit, and the declared electricity price shall not be higher than the guiding price of new centralized photovoltaic power plants in the resource area where our province is located in 2020 of 0.49 yuan/kWh.

Verb (abbreviation for verb) working procedure

(1) Organizing the declaration.

All listed energy authorities are requested to organize enterprises at all levels to submit relevant application materials, conduct preliminary examination on the materials submitted by enterprises, issue preliminary examination opinions, submit them to our bureau before May 15, and send the electronic version to gengyy@gd.gov.cn with the theme of "XX City +2020 Bidding Preliminary Examination".

(2) provincial review.

The province will review the project materials declared by various places, and solicit the opinions of the provincial power grid company on the project consumption.

After review, projects that meet the reporting conditions will be publicized in the government affairs open column of the website of the Provincial Development and Reform Commission for seven days according to relevant regulations.

(3) Platform declaration.

The project units that have passed the provincial evaluation shall declare on the information management platform of renewable energy power generation projects of the National Energy Administration (hereinafter referred to as the platform). The declaration process is divided into three steps: bidding qualification review, basic information review and electricity price information review. Enterprises are required to fill in the information step by step, and can not enter the next step until the previous step is completed.

(4) Reporting and publication.

Through the platform, the province sorts the projects that meet the reporting conditions from low to high according to the declared on-grid electricity price and reports them to the state. After the state announces the bidding results, the province will announce them in time.

Relevant requirements of intransitive verbs

(a) please arrange the materials according to the requirements in the annex, and the certification materials of the project shall be bound into a book by the project; Please arrange the electronic materials in the above order, and the supporting materials for each project are packaged and provided in units of projects.

(two) all localities should strictly examine and check the declared projects, and projects that do not meet the reporting conditions and incomplete supporting documents shall not be declared.

(3) Guangdong Power Grid Corporation is requested to study and put forward the analysis and evaluation opinions on the new photovoltaic consumption capacity in the whole province on the basis of fully considering the consumption demand of grid-connected projects and approved (filed) projects, and prepare a research report on the power consumption market and access system. At the same time, organize city and county power supply companies to do a good job in power access demonstration of declared projects in various places.

(four) all localities should promptly notify the project units that have passed the provincial review to log in to the platform to fill in relevant information and upload various supporting documents. For the items returned by the platform that need to be supplemented and improved with relevant materials, it is necessary to inform and remind the project unit to correct them in time according to the relevant audit opinions before submission.

(5) Relevant enterprises are requested to pay close attention to the platform status in real time, and timely modify the items returned for modification and give feedback.