Agreement on earthwork backfilling project
How to write the agreement on earthwork backfilling? The following are some samples I have compiled for reference only.
earthwork backfilling project agreement
Employer: Jiangsu Huilian Aluminum Engineering Co., Ltd. (hereinafter referred to as? Party a? )
contractor: (hereinafter referred to as? Party b )
based on the principles of honesty, credibility, fairness and justice, Party A and Party B, through friendly negotiation, The following agreements have been reached on Party B's contracting of Party A's backfill earthwork project of Huilian Aluminum Company in Ganyu Ocean Development Zone:
1. 3m* of the contracted project
2. Contracting method and scope
1. Contracting materials, machinery, quality, safety and civilized construction
2. Party B provides earthwork (small pieces of wind fossils) and transportation.
iii. contract time limit for a project * * * The total time limit for earthwork backfilling of the whole project is 15 days, from the date of month to the date of month (including legal holidays). In case of natural disasters such as heavy rain, the time limit will be postponed.
iv. Quality requirements for backfill earthwork
1. Earth materials: small pieces of weathered stones
2. The diameter of weathered stones in backfill earthwork should not be greater than cm, and the amount of weathered stones larger than cm should not be greater than .5% of the total earthwork.
3. The backfill earthwork must be leveled and compacted by bulldozers, and the soil quality and backfill quality shall be approved by Party A..
V. Contract price and payment method
1. The contract unit price is XXX yuan /m3 (including tax). The comprehensive quotation includes the earthwork and material cost, transportation cost and the cost of backfilling, leveling and compaction as required, and the transportation distance is not taken as the measurement factor of the contract price.
2. Payment of project price: during the project period, Party A does not need to pay, and it will make full contribution for Party B. After the project is completed and accepted by Party A, Party A will pay the total price in one lump sum within
days.
VI. Construction requirements
1. Party B shall backfill at the designated place provided by Party A. The quality of backfilled earthwork shall be approved by Party A's site management personnel before backfilling, and the continuity of earthwork transportation shall be guaranteed.
2. In the process of backfilling, Party B must accept the supervision and inspection of Party A's management personnel.
3. Safe and civilized construction: Party B shall do a good job in safety education for its on-site operators and provide a full set of labor protection articles. If casualties (including third parties) or property losses of Party A are caused by Party B, Party B shall bear all responsibilities.
VII. Breach of Contract
1. During the performance of the contract, if either party unilaterally terminates the contract without justifiable reasons, it is a unilateral breach of contract, and the breaching party shall compensate the other party for the losses caused thereby.
2. The absolute elevation of Party B after backfilling the terrace shall meet the requirements of Party A. If it fails to meet the backfilling height required by Party A, Party A will deduct it according to the actual amount.
3. Party B shall complete the project on schedule, and pay a penalty of 5% of the total contract price for each day of delay.
VIII. Disputes In case of any dispute arising from the performance of this contract, both parties shall settle it through negotiation; if negotiation fails, it shall be submitted to Ganyu County Arbitration Commission for arbitration.
IX. This agreement is made in duplicate, one for each party. It shall come into effect after being signed and sealed by both parties, and shall become invalid after the settlement price for project completion is paid.
party a: Jiangsu huilian aluminum co., ltd. party b:
legal representative or entrusted agent:
tel:
mm, mm, mm, mm, mm, mm, mm
contract agreement for earthwork backfilling
employer: Yulin great wall construction engineering co., ltd. (hereinafter referred to as party a)
contractor: (hereinafter referred to as party b)
in accordance with the Agreement Law of the People's Republic of China, the Construction Law of the People's Republic of China and other laws and regulations, and in order to clarify their respective rights and obligations, Party A and Party B have reached the following agreement through consultation on the earthwork backfilling project of the fixed-edge base of Changqing Petroleum Exploration Bureau:
1. Project name: earthwork backfilling project of the fixed-edge production base of Changqing Petroleum Exploration Bureau.
2. Project content: Part of earthwork backfilling and site leveling works in Dingbian production base of Changqing Petroleum Exploration Bureau. See the attached drawings for details.
3. Calculation and determination method of workload: Party A provides schematic grid diagram and earthwork volume of earthwork backfilling area, and Party B rechecks it, and finally the workload signed and approved by Party A's supervisor shall prevail.
IV. Contract price:
1. Settlement price of earthwork backfilling is RMB 7 yuan per cubic meter (the on-site price includes all expenses such as soil purchase fee, excavation fee, loading and unloading fee and transportation fee).
2. The total amount of backfill earthwork is cubic meters, and the total cost is RMB.
5. Requirements for construction period:
1. Commencement date: May 28th, 27
2. Completion date: June 6th, 27
6. Quality and construction requirements:
(1) Before the commencement of the project, the construction unit and Party A's construction technicians will make disclosure to Party B and sign it in writing.
(2) Party B must instruct the workers to carry out the construction according to the requirements of technical disclosure and construction specifications. Make a model first, and then start construction after reaching the standard.
(3) reach the design elevation of the construction unit when filling the soil, so as to ensure the site is flat.
(4) Soil quality requirements for hauling back the filled soil: Party B seeks the soil source, and the construction unit and Party A confirm it according to the soil quality on site.
(5) After backfilling, it must be checked and accepted by Party A of the construction unit supervision company to meet the requirements before it is qualified; Otherwise, Party B shall carry out renovation and rework and bear relevant expenses.
(6) quality requirements: meet the design elevation requirements and ensure the site is flat.
VII. Responsibilities of both parties:
1. Responsibilities of Party A:
① Party A is responsible for technical disclosure of on-site construction to Party B and providing relevant information to Party B..
(2) Responsible for organizing the project acceptance and appointing on-site construction representatives, so as to solve the matters involving Party A in the construction.
③ indicate the ditches, cables and obstacles in the site to Party B..
2. Party B's responsibilities:
① Party B shall be responsible for providing construction land and handling relevant procedures for soil borrowing; Responsible for hauling, loading and unloading, backfilling and rolling.
② do a good job in safety education for workers in this unit.
③ Strictly implement the requirements of the agreement on project quality, safety and construction period, allocate the machines and workers required by Party A, obey the arrangement of Party A's construction personnel, and carry out the construction according to the construction specifications.
④ Abide by the rules and regulations of the site, obey the command of the site management personnel of Party A and the supervision and management of the relevant departments of Party A..
⑤ report to the person in charge of Party A's construction site in time when underground water or embedded pipes and cables are found, and do a good job in drainage, waterproofing and other measures.
⑥ compile the construction data according to the specifications and do a good job of completion acceptance.
⑦ Carry out the construction in strict accordance with the safety precautions in the technical operation procedures for earthwork construction, and be responsible for the safety management in the work of loading, unloading, transportation and backfilling of soil. In case of any safety accident, Party B shall be responsible for all. Today, when handling the settlement, provide the engineering tax invoice.
VIII. Project acceptance:
1. The quality of the project is required according to the excellent grade of the national engineering quality inspection and evaluation standard, and the sub-project is excellent to ensure the sub-project is excellent.
2. The acceptance is based on the visas of Party A's construction personnel, representatives of the construction unit and supervision engineer.
3. Party B shall be responsible for all the responsibilities and bear all the expenses for rework due to quality problems caused by Party B..
IX. Settlement method: the settlement shall be based on the completed workload approved by Party A..
1. Payment method: Go through the settlement formalities within 3 days after the completion acceptance.
Xi. If the liability for breach of contract fails to pass the completion acceptance of Party A, RMB 2XX shall be paid as liquidated damages for each day of delay.
XII. Others
1. Any dispute arising during the performance of this agreement shall be settled through negotiation. If no agreement is reached through negotiation, a lawsuit may be brought to the people's court in the place where the agreement is signed.
2. If Party B's construction strength fails to meet Party A's requirements within 2 days (more than 2 earthmoving equipment and more than 3 loading equipment are guaranteed), the construction organization is poor, and the construction period is delayed without reason, Party A has the right to standstill agreement.
3. this agreement is made in quadruplicate, with each party holding two copies. It will take effect after being signed and sealed by both parties.
party a: (seal) party b
domicile: domicile:
legal representative: legal representative:
entrusted agent:
telephone:
bank:
account number:
date of conclusion.
- Previous article:Conditions for Yinchuan hukou to move in
- Next article:Tan Yunzhi can recruit.
- Related articles
- Is the Licheng Affiliated School of Quanzhou Experimental Middle School public or private?
- The Development of Lin Ruo Network
- How about Texas Sunshine Law Firm?
- Which district does Xinjing Zhizao Industrial Park belong to?
- 20 15 Matters needing attention at the entrance of recruitment registration for institutions in Qujing City, Yunnan Province
- Looking for a job as a general worker in Chengdu
- How about the recruitment video interview process of Guangxi Beibu Gulf Bank?
- Is it easy to print in a garment factory?
- Is China Agricultural Group Holding Sichuan Agricultural Co., Ltd. a state-owned enterprise?
- Who is the founder of Changchun Zhihua Haima English?