A collection of work plans and summary examples for construction project supervision engineers

?The years are passing by and the new year is coming. Writing a good engineer work plan will help us carry out the work in the new year and help ourselves do a good job in the new year. How to highlight the key points in writing What about the engineer's work plan? Please read the "Collection of Work Plans and Summary Examples for Construction Engineering Supervision Engineers" that I compiled for you and me. I hope it will be helpful to your work and life. Collection of work plans and summary examples for construction project supervision engineers (Part 1)

Time flies, time flies, and soon the first half of 20xx is over. Think carefully about your work and study in the past six months. Find out your usual shortcomings based on your own problems. Strive to make corrections in future work and study. With the help of company leaders and colleagues, significant progress has been made in life and work. The following is a summary of my work in the past six months.

?1. Civil construction project of Qingping Garden Community

?1. Building No. 10 to Building 12: interior and exterior wall decoration, floor heating, water and electricity have been completed. Doors and windows are finished 99.

?The main project of the east unit of Building 2 and 6 has been completed.

?3. The interior and exterior wall decoration works of Buildings 7 to 8 have been completed90. Garage foundation foundation completed.

? 2. Work plan for the second half of the year

? Work: 1. Buildings 10 to 12 have reached the completion acceptance standards.

?2. Buildings 6 to 8 have reached the completion acceptance standards.

?3. The garage meets usage standards.

?Ideologically:

?1. Study hard and improve your own quality.

?2. Do your daily work with humility and prudence, and avoid arrogance and impetuosity.

?3. Broaden your thinking, be bold and meticulous, and complete the tasks assigned by leaders every time with high standards. Collection of work plans and summary examples for construction project supervision engineers (Part 2)

Dear directors and shareholders:

In the first half of the year, under the correct leadership of the company’s board of directors, all employees of the company With the full support of all shareholders, the company has achieved good results in various tasks. On behalf of the management team, I now report to all shareholders on the work of supervising the company:

?1. Completion of various tasks:

?1. The company’s capital structure: At the beginning of the year, according to the company’s shareholders’ meeting In the spirit of the resolution, all the work of the company's share restructuring was successfully completed. The original shareholders Henan Bureau, a certain provincial bureau, the Sanmenxia Bureau and the Upstream and Midstream Bureau all exited, and the shares transferred to the company's management and employees were paid in full. , completed the registration work with the Industrial and Commercial Bureau after the shareholding restructuring.

?2. Project management: In order to strengthen the control of supervision projects and actively explore project management methods, the company signed target responsibility letters with managers of each department and directors of each project department to implement the job responsibility system Cost accounting has been carried out for each department and project department in every aspect of the project; in the first half of the year, the company's main business focused on the Yellow River embankment project, the Xiaobeigan drainage and siltation test, the construction of water conservation and ecological engineering projects in four project areas in Henan, and the high-level committee building The construction of residential buildings, etc., is currently progressing smoothly and the supervision work has achieved remarkable results. On March 1, the company conducted a mid-term assessment of each project director, supervision engineer, and supervisor, and signed a project safety target responsibility letter.

?3. In terms of human resources management: At present, the company has more than 100 employees. For the long-term, healthy and stable development of the company, the company has signed a personnel agency contract with the Henan Provincial Department of Personnel in May. In Zhengzhou City Social Security The center has opened accounts in the social security system and has purchased social pension insurance for its employees; the essay writing company is accepting newly graduated college and technical secondary school students this year and has provided internship opportunities for college students.

In the first half of the year, company employees participated in the safety assessment personnel training courses held by the National Security Bureau, people participated in the Ministry of Construction supervisor training, people participated in the Ministry of Water Resources water conservancy project construction supervision standard training, people participated in the Ministry of Water Resources water conservancy supervision engineer training, this year introduced Key personnel above the supervision engineer level;

?4. In terms of qualifications: In March, the company successfully passed the ISO: quality system certification review work; in the first half of the year, it applied for the Ministry of Water Resources’ resettlement project supervision qualifications, soil and water conservation ecological Construction supervision qualifications, safety assessment qualifications and engineering consulting qualifications from the State Administration of Work Safety; currently the immigration and water conservation qualifications have been passed. Experts from the State Administration of Work Safety reviewed and approved the safety assessment qualification materials. Engineering consulting qualifications

? Passed the preliminary review but failed the final review. The application for construction project bidding agency qualifications is in progress. , In terms of production safety: there were no serious casualties or major traffic accidents with equivalent responsibilities in the first half of the year; there were no serious violations of discipline by employees; , Main economic indicators: As of the end of the year, there were 2 new contracts signed this year, including 2 water conservancy projects, 2 water and soil conservation ecological construction Projects, information system projects, highway projects, housing construction projects, contract amount: 10,000 yuan. In the first half of the year, the output value was 10,000 yuan, the investment in fixed assets was 10,000 yuan, and the profit was 10,000 yuan.

? 2. Handling of existing problems:

? The company is in operation, and some problems have occurred this year, which have had a greater impact on the company. The handling of the situation will now be simplified Report:

?1. Dealing with the problem of fraud by Yangtze River project supervisors

?The company undertook the construction supervision of the Jingnan Yangtze River embankment reinforcement project for each bidding section from 2008 to 2018. The bank protection project of the section from Huangshuitou to Zhengjiahe in the fifth bid section started on the day of the year and was completed on the day of the year. Passed the unit project acceptance on the year, month and day. Contract price: 10,000 yuan. The supervision fee is about 10,000 yuan.

?After auditing by the audit department and investigation by the procuratorial organ, it was found that Han Shangxue and other five employees of our company who were responsible for the supervision of the fifth tender section could not withstand the temptation of money, lost the professional ethics of supervision engineers, and accepted bribes. Participated in fraud and violated laws and disciplines. Among them, Han Shangxue has been arrested by the procuratorate.

After the incident, the company attached great importance to it and actively dealt with the aftermath. On the one hand, it cooperated with the audit department and procuratorial organs to identify the problem; on the other hand, after the fraud was discovered, the company immediately dispatched supervisors Organize the construction unit to formulate a re-polishing plan and implement the re-polishing in a timely manner, eliminating project quality defects and ensuring project quality.

?Due to the public exposure of this incident, it has put great pressure on all aspects of the company. On how to respond to the punishment imposed by the Ministry of Water Resources, the company’s chairman and other company leaders have gone to a certain province many times to explain. Requesting that the Yangtze River incident be taken into account in the punishment is purely for supervisors

?2. The operation of the branch: At the beginning of this year, the company planned to set up a branch in Inner Mongolia and started trial operation. Up to now, the Inner Mongolia branch has The operation is in good condition, and the signed contract value is nearly 10,000 yuan. Among them, the Hengquan Reservoir Project in Luliang City, a certain province, is very beneficial to the company's visibility. Planning for the establishment of a Ningbo branch began in March and the work is in progress. personal behavioral factors. However, the Ministry of Water Resources insists on imposing a penalty, and its decision may be issued in the near future to fine the company 10,000 yuan and disqualify it from bidding for the embankment reinforcement and heightening project within two years.

?The occurrence of the Yangtze River incident exposed the company's management loopholes and neglected the ideological quality of employees. Collection of work plans and summary examples of construction project supervision engineers (Part 3)

? In the first half of this year, in order to achieve the goal of "increasing speed and creating excellence" in this supervision contract period, all supervisory personnel carried forward the work style of hard work, overcoming difficulties and progress, dedication to work, and due diligence, and carried out the supervision work in the first half of the year rigorously and scientifically. The supervision work in the first half of the year focused on three aspects: controlling project quality, supervising project progress, and standardizing contract management. On the basis of adhering to equal emphasis on safety and environmental protection management, we further strengthened internal management and strived to create a new situation in supervision work. The supervision work in the first half of the year is summarized as follows.

?1. Strengthen progress control to ensure that the project progress proceeds as planned

?Construction companies will have no benefits without progress. The contract section supervised by xx has problems such as dangerous terrain, complex geology, small construction site, and extremely difficult construction. In particular, construction companies from all over the world are not adaptable to the terrain, climate, transportation, and humanistic environment of mountainous areas, and have more difficulties. . In order to urge each bid section to comply with the production plan, on the one hand, we have made reasonable adjustments to the construction plan for the first half of the year, the monthly construction plan, etc. and approved them in a timely manner based on the contract duration requirements and the principles that are beneficial to ensuring the quality of the project; on the other hand, we have actively Supervise the construction unit to obtain the necessary reasonable labor, materials, machinery, etc. to ensure that the planned construction plan is completed and the measures to complete the plan are implemented. In the first half of the year, various bidding sections under the jurisdiction of our office set off a construction climax focusing on dug piles, roadbed excavation, tunnel excavation and support. We took the lead in pouring the first pier column, the first mold and the second lining and other projects along the entire line.

? 2. Strengthen quality control to ensure that the project quality meets the quality requirements

?Quality is benefit and life. In the face of the severe situation of full development of this supervision contract period and increasingly heavy supervision tasks In view of the current situation, we closely focus on the overall requirements of "speeding up and creating excellence" in project construction, carefully controlling every link to ensure that the quality of the project meets the requirements of high-quality products. Strengthen contract management and improve organizational structure. Pay close attention to the personnel and equipment of the construction unit, and require each bidding section to further improve the quality management organization and quality assurance system.

?Strengthen process control and strictly control quality. The first is to strengthen side stations, that is, supervisors inspect the entire construction process on site. In order to prevent and reduce the occurrence of quality accidents, during the continuous construction of important processes, the resident office arranges supervisors to be on duty day and night. When side station supervisors discover problems, they report them to the professional department in a timely manner. The second is to supervise the self-inspection of the construction unit and proactively carry out random inspections to ensure the quality of the project; the third is to strengthen inspections. Senior resident supervision engineers often go to major construction sites to inspect and inspect, and professional supervision engineers conduct inspections according to the sections under their jurisdiction. Conduct on-site inspections to detect quality problems and hidden dangers in a timely manner and deal with them in a timely manner. Serious cases will be immediately stopped for rectification or rework. Through the efforts in the first half of the year, all the projects delivered have met the requirements.

?3. Reasons for not completing part of the progress plan in the first half of the year

?Due to the slow rerouting work of three-pole, five-line, and natural gas pipelines, some roadbeds and bridge pile foundations cannot be carried out; There was a lot of rain in the first half of the year, which greatly affected roadbed and bridge projects; many construction projects were forced to stop due to power outages due to the relocation of power supply lines; the impact of the conversion of bridges into tunnels resulted in lower workload completion; and the construction organization of individual bid sections was unreasonable. Collection of work plans and summary examples for construction project supervision engineers (Part 4)

?All supervisory staff carry forward the work style of hard work, overcoming difficulties, striving for progress, dedication to their posts, and fulfilling their duties, and carry out the work in the first half of the year rigorously and scientifically Supervision work. The supervision work in the first half of the year focused on three aspects: controlling project quality, supervising project progress, and standardizing contract management. On the basis of adhering to equal emphasis on safety and environmental protection management, we further strengthened internal management and strived to create a new situation in supervision work. Supervision work in the second half of the year

?(1) Strengthen progress control to ensure that the project progress proceeds as planned

?"Project progress" is one of the three major control objectives of supervision work. As a hard indicator, construction companies will have no benefits without progress. The six contract sections supervised by the No. The humanistic environment is not suitable and the difficulties are even greater. In order to urge each bidding section to complete the xx annual production plan issued by the headquarters in accordance with the spirit of the meeting, the Gao Resident Office, on the one hand, based on the contract period requirements and considering the principles that are beneficial to ensuring the quality of the project, carried out reasonable construction plans for the first half of the year, monthly construction plans, etc. adjustments and timely approval; on the other hand, it actively urges the construction unit to obtain sufficient required reasonable labor, materials, machinery, etc. to ensure that the planned construction plan and measures to complete the plan are implemented.

?(2) Strengthen quality control to ensure that the quality of the project meets the quality requirements

?Quality is benefit and life. In the face of the full development of this supervision contract period and the increasingly heavy supervision tasks Faced with the severe situation, we closely focused on the overall requirements of "speeding up and creating excellence" in project construction, using the "Traffic Quality Management Year" as the carrier of activities, carefully controlling every link to ensure that the project quality meets the quality requirements. Strengthen publicity and education and enhance quality awareness. First, according to the work objectives and safeguard measures of the Quality Year activities proposed by the provincial guidelines, an implementation plan for the Quality Year activities was formulated based on the characteristics of this project. The second is to strengthen the quality awareness of supervisors, firmly establish the concept of "quality is benefit and life", and actively advocate the ideas of "fine management" and "zero defects".

?(3) Strengthen safety control to ensure that there are no major safety accidents

?Safety responsibility is greater than the sky. We have actively learned the experience and lessons of XX safety production supervision, paying special attention to Standardized management of safety production at construction sites, and further strengthened safety supervision on construction sites to ensure that there are no major safety accidents and mass casualties and mass injuries, and to reduce the occurrence of general accidents.

?(4) Strengthen environmental protection management to ensure that project construction meets environmental and water conservation requirements

?First, establish an environmental and water conservation organization. The Gao Resident Office has established an environmental and water conservation leading group, formulated an environmental protection supervision implementation plan, and equipped environmental protection supervision engineers. At the same time, the construction unit is urged to set up an environmental protection and water conservation leading group, and appoint dedicated personnel to prepare plans for waste management, farmland protection, vegetation protection, slope stability management, etc., as well as prepare environmental protection and water conservation plans.

The second is to implement the environmental protection work plan into the construction process. During the construction process, we strictly followed the construction requirements of "treat first before excavation, first support before stacking, first dam before dumping slag" and other construction requirements, and conducted on-site investigation and processing of the off-line drainage system to ensure smooth flow of farmland water systems; for this area Based on the geological and hydrological characteristics of the tunnel, we urged each construction unit to formulate detailed environmental protection plans for tunnel water inrush, mud burst, gas leakage, etc.

?The third is to conduct a special inspection together with the workstation every month, and report on the inspection status, and urge the construction unit to implement various environmental protection, water and soil conservation measures, and to discharge all pollutants up to standards. Collection of work plans and summary examples for construction project supervision engineers (Part 5)

?In the first half of this year, the Municipal Construction Bureau, in accordance with the requirements of the Municipal Party Committee and Municipal Government, and in accordance with the functions and responsibilities of the Construction Bureau, attached great importance to quality work in the construction field and actively grasped We have managed the quality of construction projects, municipal infrastructure construction, industrial zone infrastructure construction and other projects well, and achieved excellent results. The following is a summary of the work of the project department in the first half of the year.

?1. Strengthen leadership, clarify the division of labor, and establish a responsibility mechanism

?In order to strengthen the leadership of the quality market promotion work, a team was established with the director as the team leader and the director in charge as the deputy The "Quality City Revitalization Work Leading Group" composed of the director and personnel from relevant departments is responsible for the organization and leadership of the quality city revitalization work; it has clarified the division of labor and responsibilities of the quality supervision station, testing center, and construction management department for quality work, and signed an agreement Target responsibility letter; based on the construction work stage, work focus, etc., a work plan for quality city revitalization activities was formulated in a timely manner to ensure that the quality work is planned, focused, targeted and operable.

?2. Strengthen education, strengthen training, and establish the idea of ??quality first

?The first is to strengthen the learning and training of personnel at quality supervision stations, testing centers, and safety supervision stations to provide Build a strong quality safety and quality supervision team, and use various forms of training for supervisors. One is to send them out to school. Supervisors were sent to participate in new standards and new norm training courses many times; secondly, internal organizational learning was conducted. Formulate a detailed study plan, organize self-study for supervisors, organize discussions among implementation personnel, and then have the old supervisors carefully study the standards again and give lectures to the newly recruited quality coordinators, and conduct regular business assessments for the entire site; third, invite other supervisors to Experts from the station came to our bureau to pass on their experience and give treasures.

?The second is to strengthen education for enterprises and construction personnel.

In the first half of the year, several trainings were organized for project leaders and technical leaders of construction units, project managers and technical leaders of construction units, chief supervisory engineers of supervision units, and professional supervision engineers in Chongqing, focusing on learning new norms, new regulations, and project quality. Prevention and treatment of common diseases.

? 3. Be strict and conscientious, pay close attention to the quality supervision and management of construction projects, and ensure the quality of construction projects

? Implement quality supervision responsibilities and strengthen quality awareness. For each construction project, we implement quality supervision and management responsibilities in management, clarify the project quality goals in terms of project quality, clarify the responsible subjects in terms of project quality, and ensure the "quality control" of raw materials. While supervising the quality of raw materials entering the construction site, detailed records are kept of all raw materials entering the construction site. Various material testing must comply with relevant national construction specifications and acceptance specifications. The use of raw materials is tracked and managed to prevent substandard materials. Materials flow into or are piled up at the construction site, ensuring the quality of the project from the source. Collection of work plans and summary examples for construction project supervision engineers (Part 6)

In 20_, under the correct leadership of the board of directors and with the support of various functional departments, our company emancipated the mind and kept pace with the times. , constantly adjust strategic goals, improve operational quality, and focus on the work of "comprehensively improving operation and construction capabilities; effectively solving development problems such as concepts, talents, funds, and assembly; building strong execution capabilities; accelerating the company's sound and rapid development process" ideas, further innovated work ideas and work measures, actively carried out work, and achieved certain results. The work in 20_ is now summarized as follows:

? 1. Do a good job and strengthen the management work.

? Management is the leader. Only by further strengthening the awareness of management leadership among all employees, doing everything possible to undertake more construction tasks, and coupled with effective management, can the enterprise be profitable. Over the past six months, we have intensified our business operations and achieved certain results. The first is to analyze the operating situation and break down the operating indicators issued by the company at all levels; the second is to move forward the entry point for business tracking and contact to seize market opportunities. Utilize all the relationship networks to get in touch with the construction party in the early planning stage of the project, pay close attention to the development trends of the project, and strive to take the initiative in the early stage. In 20_, in addition to winning the bid for the project, we have followed up on many projects. , laying a preliminary foundation for the completion of business operations in the second half of the year; third, changing concepts and strengthening cooperation in project quotations. In just six months, the collaboration bid for engineering projects totaling billions. The fourth is to introduce experienced budget personnel and strengthen the management team. After half a year of work, I have now been fully integrated into our company and enriched the operations and management department.

?The company’s operating status in the first half of the year is: Up to now, ***completed operating output value of 368.64 million yuan, accounting for 6.144% of the full-year target (600 million yuan), a year-on-year increase of 191%. Except for Inner Mongolia, only 168.64 million yuan was completed, an increase of 33% over the same period last year. Among them, civil engineering is 326.5968 million yuan, municipal administration is 29.3725 million yuan, steel structure is 6.58 million yuan, and decoration is 6.0965 million yuan. Analyzing the current operating conditions, except for the Inner Mongolia Branch, the Gaogang Project Department and Xi'an Branch are in good condition.

? 2. Improve the project management system and improve construction capabilities

? Construction capabilities are one of the important capabilities that companies need to improve to accelerate their development. In the first half of 20_, according to the company’s requirements, we Focus on the following aspects of work.

?1. Overcome difficulties, persist in creating excellence and follow the road of brand strategy. Some departments and offices, despite a very lack of basic information, have firmly adhered to the main assessment indicators to carry out their work. Taizhou Meilan East Road, which meets the conditions, has applied for the Qionghua Cup project outside the city. Four of the first batch of high-quality structures have been declared, and one binomial method has passed the appraisal of the provincial expert group. The authorized unit is currently being entrusted to conduct a "novelty check", and the results of the QC activities have been released.

?2. Enrich content and increase the depth of basic management. In the first half of the year, we took improving construction capabilities as the general requirement for project sequence management and further strengthened on-site management.

We have strengthened online declarations, monthly inspections, project evaluations, team building, and inspections of key projects; in addition, in terms of safety, we have adopted online monitoring and management, inspected the quality of scaffolding erection, and held competitions and speech contests. In terms of project management, cost management kicked off. It has provided on-site guidance for the direct-operated projects of the municipal branch and the pilot project of China Railway Baoqiao respectively, and formulated cost accounting methods. It is guiding and participating in the accounting of the Inner Mongolia Branch.

?3. Internal management to improve quality

?First of all, improving management level is an inevitable requirement for the company's continuous development and growth. In the first half of this year, the company launched a series of new management. Clear responsibilities and clear rights and responsibilities are the basic principles of management work. In order to clearly and effectively manage employees' goals, we seek benefits from detailed management. Under the organization of the Human Resources Department, each department and office monitors the daily work and positions of all employees. Responsibilities were analyzed and a complete set of work lists of our company's current work status were formed.

?Secondly, work plan management was implemented. Filling in the work plan allows us to consciously make overall arrangements for the work, and often take inventory of the work, which can "turn the invisible into the tangible" of our work. It not only improves work efficiency invisibly, but also increases the transparency of work and becomes a An important means of communication between superiors and subordinates. Since we started to implement plan filling in April, we have formed a relatively complete plan filling system, and all departments and offices have basically developed planning habits.

?Third, try performance appraisal linked to salary. After more than a month of discussions, various departments and offices determined various assessment indicators. Through the first assessment in May, on the one hand, various departments and offices were urged to carry out their own work, and many loopholes in the company's management were also found.

?Fourth, improve various work processes and continue to promote the tabulation and flow of work.

?Fifth, the conversion of old and new accounting standards was completed and NC was fully implemented. Synchronous management of online banking and finance, and preliminary construction of a group fund management platform.

?Sixth, the scope of human resources work continues to expand. In the first half of the year, it not only introduced 8 first-level architects, 2 second-level architects, and 2 senior engineers, but also held two execution trainings, organized performance appraisals, and adjusted the salary structure.

?In addition, based on the improvement of the original network operation, according to the requirements of nc software operation, the Tietong optical fiber Internet is changed to the Telecom optical fiber Internet, which greatly improves the network operation speed and effectively ensures that external areas The success rate of accessing the company's NC server; the computer room has been reasonably renovated, and an uninterruptible power supply has been added to avoid the risk of network data loss.

In terms of aspects, the supervision and inspection of the corporate culture part of the project site has been intensified, with constant tracking and monthly inspections. Now a fixed pattern of construction site layout has been basically formed; the corporate culture of various departments and offices of the company has been carried out Special assessments are linked to performance-based pay to change employees' weak awareness of corporate culture.

?In the next work, we will do a good job and strive to do all the work better. Collection of work plans and summary examples for construction project supervision engineers (Part 7)

? Focusing on the 20xx work goals of the company’s general manager’s office and the 20xx work plan of the engineering department, the overall planning work has been basically completed. Below I will outline the 20xx The engineering department's work summary in the first half of the year and the work plan for the second half of 20xx were reported to the company's general manager's office. The engineering department's work summary in the first half of the year.

?One of the priorities of the Engineering Department in 20xx is the handover of houses, physical and data handover of equipment and facilities, production of equipment ledgers, and engineering of Wanghu City's "Guixiangju" Dangui Garden, Yaogong Xinyuan, and Shui'an Star City Promote the rectification of quality defects. Under the correct guidance of the company's general manager's office and with the support of departments and customer service centers, the work planned in the first half of 20xx was basically completed.

On the basis of the original software, we will improve various management systems, engineering service manuals, and emergency plans; on the basis of the original hardware, we will work with the administrative and human resources department to introduce, recruit, and reserve engineering and technical personnel to ensure new projects. After expansion, the normal development of property engineering services will encourage employees to participate in various engineering technology trainings at professional training institutions, organize employees to participate in internal training on other professional knowledge, and continuously improve the overall quality of employees.

?After the flood season incident in the south, we realized the bloody lessons and summarized the shortcomings and experiences of others in the emergency plans for typhoon and flood prevention. Before the arrival of the flood season in Anhui, we revised the prevention plan based on the actual situation of each project. The emergency plan for Taiwan flood prevention was prepared in advance, and supplies were prepared in advance, and the company proactively cooperated with various service centers to provide on-site guidance on flood prevention and control work. This ensured that all jurisdictions managed by the Anhui Bund could survive the floods safely during this year's flood season, reflecting the guidance and service capabilities of the company's departments. Work Summary "Work Summary of the Engineering Department in the First Half of the Year".

?Before the arrival of winter, the Engineering Department comprehensively enhances the department's service awareness, proactively formulates cold-proof and anti-freeze emergency plans for facilities and equipment for each service center and organizes their implementation to ensure the normal operation of equipment and facilities in cold winter; proactively subscribes for employees Night duty coats ensure personal protection from cold and warmth when employees are on duty, allowing employees to feel the warmth of the company.

?In order to speed up the process of standardized management of property engineering services, engineering and decoration employees adopt the principle of subcontracting responsibilities to each person, and carry out engineering service management based on the division of labor and not the separation of households. The manager and deputy manager of the engineering department will go to each service center at least twice a week to guide and inspect the engineering service work (not less than twice a month for off-site projects), focusing on checking whether there are safety hazards in hidden projects and whether the equipment is operating normally. Arranged last week Whether the work can be implemented, check whether the employees' operations are standardized, and whether the equipment operation records are complete.

?As a functional department of the company, the company's engineering department mainly implements the resolutions of the general manager's office, completes all matters assigned by the general manager's office, and serves all customer service centers in the Anhui Bund. In the spirit of teamwork and corporate On the basis of healthy development, comprehensive service and guidance work will be carried out. The main work completed in the first half of 20xx is as follows:

? (1) Wantou Home Project

? In the first half of 20xx, assisted the Wantou Home Customer Service Center to complete the maintenance and energy saving of central air conditioning The formulation and implementation of plans and the accounting of cooling and heating charges for rented office spaces, renovation of time-sharing electricity meters in residential buildings, green renovation, annual inspection of elevators in residential buildings and office buildings, high and low voltage power distribution systems, fire control systems, water supply and drainage Maintenance of systems and other implementation equipment, etc.;

? (2) Wanghu City and Guixiangju projects

?According to the progress of the Wanghu City project handover, the Engineering Department will fully assist Wanghu City Each service center comprehensively supervises the jurisdictions that have been transferred over, starting from water supply and drainage, power transformation and distribution, HVAC, fire protection, monitoring and security and other systems, and substantively handles them in accordance with the management system, operating procedures and other system documents formulated by the Engineering Department. When property owners complain about housing quality, they should follow up on the rectification of equipment and facilities with quality defects, conduct renovation inspections and management, and conduct regular inspections and maintenance of equipment and facilities to ensure normal operation of equipment, extend the service life of equipment, and safeguard the safety and economic interests of all owners. . Through the house delivery experience of "Guixiangju" in Wanghu City, we summarize the experience and lessons learned during the house handover process, conduct detailed analysis and study carefully, provide experience for later house delivery, house inspection, decoration management, equipment maintenance and other work, and provide better services to the owners. Collection of work plans and summary examples for construction project supervision engineers (Part 8)

? There are six common articles for the project department's work summary for the first half of the year and work plan for the second half of the year.

With the development of science and technology, the company’s requirements for the project department have also changed in the first half of the year. In order to better complete the next stage of goals, and future work can be carried out in an orderly manner, then we can start to write our own The project department’s work in the first half of the year was summarized. Doing a good job summary can better improve your ability to discover, analyze and solve problems.

How can I write a good summary of the work of the project department in the first half of the year? The following is the "Project Department Work Summary for the First Half of the Year and Work Plan for the Second Half of the Year" that I have carefully compiled for you, for your reference only in work and study.