Everyone knows that the process of decorating a house is very hard, but many people are confused about this process and don't know where to start. Bian Xiao will explain it to you today, hoping to bring you some help. At the same time, I will share with you the process steps of Puyang decoration and the common sense of Puyang KTV decoration design in case of emergency.

Decoration process steps

1, main body demolition and reconstruction

First of all, when decorating a house, the demolition and transformation of the main body is the first project of the process steps, so it mainly includes wall demolition, wall building, wall covering, heating removal, plastic steel window replacement and so on. Demolition of garbage should be cleared out in time to ensure indoor cleanliness and facilitate future construction.

2. Hydropower transformation

The next step is the reconstruction project of hydropower. Before this, designers need to measure the size, and then determine the specific location of switches, lamps, basins, bathtubs, washing machines, etc. To make a renovation plan, it is best to send someone to the water heater. According to the model you choose, design the position of power supply and interface, and put the air conditioner and its power supply on the wall of the bedside as far as possible to avoid the air conditioner blowing directly at people in the future.

3. Install the socket panel

Then, after painting the wall, apply a layer of nitrolacquer to the area where wallpaper is needed. It only takes one day for the paint to dry thoroughly, and then paste the wallpaper. The socket panel can be installed in about half a day. It should be noted that it is best to buy sockets with switch function, especially in the kitchen, so that rice cookers and microwave ovens can be controlled without plugging and unplugging power.

4. Install cabinets and finished doors

Cabinets and finished doors are actually a supporting project, so we should buy some kitchen utensils in advance, such as range hoods, cookers and sinks. It is best to deliver the goods on the same day and install them at the same time as the cabinets. The finished door should be installed before the floor, mainly because the installation steps of the door are complicated, such as hinge, door lock, door suction, door frame and so on. And used a lot of tools, such as hitting the floor first.

5. Install hardware and floor

Finally, install some hardware and floor, but before this installation, we need to install all kinds of hardware pendants at home, such as clothes hangers, curtain rods, lamps, sanitary ware, toilets and so on. These piecemeal projects scattered with ash are installed one by one, and if the process is reversed, it is likely to cause damage to the floor. The floor must be leveled before installation, and workers must be asked not to cut the floor in the house, but in the corridor, so that the corridor can be cleaned at last.

General knowledge of Puyang KTV decoration design

1. Puyang KTV should be spacious and lively when decorating the lobby, and pay attention to the orientation of the gate, according to the requirements of geomantic omen. In the selection of materials for hall design, choose materials that are easy to clean, and the floor and wall decoration can adopt continuous patterns and colors. This can invisibly increase the sense of space in the hall, and the design of the hall must have affinity to make consumers feel at home.

2. When designing KTV walkways, we must make proper arrangements. For many consumers, passing by will make people feel inexplicable excitement. Narrow KTV corridors will make people feel depressed, while spacious KTV corridors will make people feel peaceful and calm. If there are stairs in the corridor, the pedals must be rounded, and the decorative materials should be strong and wear-resistant, not too steep.