Job Recruitment Website - Zhaopincom - Installation method of Aotai inverter pulse welding machine 3 15d

Installation method of Aotai inverter pulse welding machine 3 15d

The installation method of Aotai inverter pulse welding machine 3 15d is as follows:

1. Take out the control cable of the box of the wire feeder, find the longer end of the control cable trachea, connect the trachea to the gas pressure reducing valve and connect it to the gas cylinder.

2. Connect the other end of the control cable to the wire feeder in a similar way.

3. Connect the welding gun and the wire feeding device.