Nowadays, many people are very concerned about bricklaying construction when doing home decoration. Do you know what the cost details of bricklaying decoration include? The details of bricklaying costs have different standards in different cities, and many people don’t know. What does the cost of decoration brickwork include? Today we will take a look at the details of the cost of decoration brickwork and see what bricklayers need to pay attention to when carrying out construction. I hope it can bring some help and reference to all of us.

1. Detailed costs

In the past, a skilled bricklayer cost about 150-200 yuan a day, but now it has risen to 400-500 yuan a day. Generally, carpentry costs 150 yuan a day, and those with good skills will cost more than 200 yuan. In addition, the daily salary of plumbers and electricians was only more than 200 yuan in 2011, and now the daily salary has increased to 300 yuan. The daily salary of carpenters ranges from 250 yuan to 300 yuan. In 2011, the daily salary was around 200 yuan, which has not increased much. There is not much carpentry work. The main reason is that many cabinets and storage boxes are now custom-made. This kind of work Replaced by factory.

The daily salary of a painter is currently about 300 yuan, and in 2011 it was only about 200 yuan. Although demolition workers and wall builders are not highly skilled, because there are fewer workers willing to do these heavy tasks, prices have been rising. The salary of demolition workers has increased from 80 yuan in 2011 to 200 yuan now. There is no one to do it if the money is low. The wages of wall builders have also risen from 200 yuan in 2011 to 300 yuan now.

 

2. Nine precautions in the bricklaying construction process

1. Ceramic tile paving position and pattern position, waistline height, paving direction, How to deal with flowers and so on should be explained clearly when sending and collecting bricks to avoid large-scale rework.

2. Cement sand must meet quality requirements. Fake and inferior cement and inferior sand must not be used, and inferior environmentally friendly interface agents that exceed the standard must not be used.

3. The proportion of lime to sand must meet the requirements of quality specifications. The cement should not be too little or too much, nor should it be uneven with the ash;

4. The height and setting of the paving within the same day Time, if the pad is not solid, it is easy for a wall to be paved to the top in one day to cause hollowing.

5. Self-inspection and finished product protection must be strictly controlled and effective measures must be taken. Strictly control the hollowing rate; even if only one tile has a large area of ??hollowing, it must be reworked; the flatness and verticality must not exceed the limit. There should be no cracking, sanding, or hollowing in the ground leveling (rework is required if it exceeds 40 square centimeters).

6. Do a good job in finished product protection and watering maintenance.

During the construction process, decoration bricklayers must pay attention to the quality of the construction. The detailed cost of bricklaying is mainly determined based on different materials and construction standards. We can choose some higher-quality materials to create a better decorative effect. Decoration tile workers need to use cement sand during construction. The quality of cement sand is very important. If the cement sand is not selected well, the tiles will easily fall off. When choosing a bricklayer, it is best to choose a bricklayer from a large company.