Job Recruitment Website - Zhaopincom - Where can I find a plumber in Kunming, Yunnan?

Where can I find a plumber in Kunming, Yunnan?

Hydropower project has always been a part of the home improvement project that everyone cares about, so it will not look good after it is built in the later stage of construction. Secondly, in the later period of residence, if there are other problems in the project, it is difficult to maintain it.

My family did a good job in paying for water and electricity in Dianchi Lake. The master worker's construction is relatively standardized and the technology is also very good.

L, z, c, 8, 6, 0, 0, 8. Let's take a brief look at the hydropower problem first.

Electricians enter the site to check the safety of electrical equipment for household line construction.

Accurate positioning, reasonable layout, proper layout and convenient use.

The straight depth of the groove is suitable for the bottom box to be flat and buried smoothly.

The load-bearing structure cannot knock out beams, holes, columns and holes.

Wiring, laying, orderly arrangement, branching, tee joint, straight pipe and direct connection.

How thin is the wire passing through the pipe? The line code is fixed evenly.

The wiring color separation fire line is red, and the zero line is blue ground wire.

Lockhead winding beam wax pipe ceiling hose for line protection box

Prohibited items: circuit borrowing, midway connection, borrowing old lines.

Installation of microwave ovens with air conditioning and hot water pipes requires a dedicated line.

The distance between wires should be kept at an appropriate interval.

Mortar sealing groove is not wet enough, and the pipe is not exposed when it comes out of the wall.

Install the ceiling expansion bolt of the chandelier firmly and reliably.

The socket switch is horizontal and vertical, beautiful in appearance and sensitive to electricity.

Safety protection of leakage switch and air switch in main distribution box

The reasonable installation of lamps beautifies the environment and makes the room bright.

Hydropower transformation

Do you want to go to the top of the mountain or the ground by water? Build a wall first, then water and electricity, or water and electricity first, then build a wall?

Waterway roof: no need for slotted floor. If there is water leakage, it can be found in time to avoid leaking downstairs. However, it is necessary to punch holes in the beam, and the wires pass through the beam holes and some central air conditioning openings, so the pipeline will be longer.

Waterway to the ground: the ground after grooving can stabilize the pipeline, and the water pipe line is short. However, it needs to be slotted underground, which is labor-intensive. There will be an intersection with the ground wire tube. In case of water leakage can not be found in time, the construction requirements are higher.

Build the wall first, then the water and electricity: it is more convenient for bricklayers to build the wall, and the lofting is more accurate after the wall is dry. The positioning of the box can be completed by an electrician at one time. But masons need to enter the field twice, which will increase working hours. Materials also need to enter the site twice.

Water and electricity before wall construction: water and electricity can be carried out immediately after knocking on the wall, and masons can enter the site at one time. However, the pipeline will bring difficulties to the bricklayer to build a wall, and the bottom box can only be positioned by the bricklayer while constructing. Because water and electricity are used to build walls first, the drying cycle of walls is shortened, and sometimes the painting construction will be delayed later.