Three year-end summaries of supervision work

1. Model essay on year-end summary of supervision work

Time flies, for example, the year 20xx is drawing to a close. Looking back on the work of contacting project supervision in the past year, I have mastered some knowledge through my unremitting efforts under the care and guidance of leaders and the help and encouragement of colleagues, but there are still many shortcomings. This year's work summary and report are as follows:

1. Personal annual main work content

In this year's work, I participated in the reconstruction and expansion project of Tianjin Ligang prison, the slope protection project and the armed police barracks project. During the period, I carried out all kinds of work with the attitude of working and learning, summed up the process and key points of each work, found problems that I didn't understand, consulted the instructions in time and asked the leaders for advice, and accumulated work experience bit by bit. In terms of engineering quality, strict supervision shall be carried out according to the supervision specifications, engineering drawings and supervision rules. I participated in the reconstruction and expansion project of Tianjin Ligang Prison. Most of the time in the construction site, from pile foundation engineering to the transformation of individual subjects. Later, the armed police barracks started construction and was sent to the armed police barracks for supervision. During the period, I found a lot of things I didn't understand, and I filled my vacancy in this area by consulting the specifications. I can solve it independently next time I encounter similar situations. For the parts that need to be on the sidelines, the on-site records should be made, and the concealed works should be accepted in strict accordance with the specifications. If the acceptance is unqualified, the next working procedure is strictly prohibited. Check and confirm the original vouchers, test reports and quality certificates of materials and equipment entering the site, witness and sample the rebar entering the site, and then follow the contractor to the quality inspection station for a series of follow-up work. At the end of each month, compare the site construction with the construction plan. If the progress is backward, find out the reasons in time and take measures to speed up the construction progress and ensure the quality of the project.

2. Work experience, feelings and shortcomings

Through this year's supervision work, I feel that as a supervisor, only by being well-behaved, being strict with oneself, being integrated into the team, respecting others and working conscientiously and responsibly can we win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of my old colleagues, I have learned a lot of new theoretical and practical experience and broadened my knowledge in this industry. This year, I learned a lot. I continued to work hard and study in society, adjusted my mentality, changed from a passive state when I first started social work to an active state when I started to adapt to society, and continued to devote myself to intense work with a relaxed mood and abundant energy. In the future work, I will study harder the knowledge and practical ability of this major, constantly sum up experiences and lessons, and strive to do better.

3. Personal career development opinions and opinions on the company

Personal career development planning: I know too much about supervision and can never be satisfied with reality. So next year, I will learn more, ask more questions and do more, gradually learn more professional knowledge according to the needs of my work, abide by the management of the company in my work, strengthen the cultivation of team consciousness, further integrate into our collective, and learn more standard requirements in my spare time to improve my professional level. For myself, for my family and for the company, I hope the company will organize more training for our employees so that we can do this job better and do more things for the company.

2. The supervision work year-end summary model essay

20XX 65438+ 10 65438+June 6 applied to work in Haihe supervision company, and was arranged to be the supervisor of power engineering and cable TV network engineering in XX construction site. After nearly a year's work, with the help of company leaders and colleagues, the corresponding supervision tasks have been successfully completed in the past year, which has been recognized and praised by the owners and contractors. In the supervision work, I work hard, dare not be tired, work carefully, and have a good professional ethics and a strong sense of responsibility. Now I will make the following summary report on my work and supervision experience in the past year:

1. Conditions of use

Just arrived at the construction site, in a different place, but faced with objective unfavorable factors such as large supervision tasks, wide supervision area and few supervision personnel. So I did encounter some difficulties in the actual supervision work. I didn't flinch in the face of difficulties, and I made progress despite all the difficulties. In practical work, I actively communicate with the owners and contractors to coordinate various relationships, so as to carry out supervision work as soon as possible, and take the time to familiarize myself with the construction drawings and related design instructions. In the shortest possible time,

In the actual supervision work, I require the construction unit to implement total quality management, establish and improve the quality assurance system, and make reports on commencement, construction measures, technical disclosure, positioning review, material and equipment inspection, concealed works, quality inspection, special inspection and completion data.

In the aspect of engineering quality control, we should combine active control with passive control, actively carry out supervision work, and focus on prevention. Review the contractor's qualification, focusing on the enterprise registration certificate and technical level, submitting relevant documents (copies), understanding the general situation of technical force, main building installation experience, etc. , and check the supply of sand, stone, cement, steel and the mixture ratio of concrete and mortar.

According to the characteristics of the project and the key parts that affect the quality of the project, review the construction organization design submitted by the contractor, put forward improvement suggestions in view of its shortcomings, and check the original vouchers, test reports and other quality certification documents of the purchased materials.

Control in advance to ensure that engineering quality accidents do not occur or occur less. Such as winter construction, low temperature, concrete pouring, masonry, wall plastering and other quality problems. It is not easy to guarantee. Therefore, the construction unit is required to provide a winter construction plan to prevent in advance and avoid freezing injury.

For important engineering parts and subdivisional works prone to quality problems, quality pre-inspection measures shall be formulated. For example, in the construction of cable pipe laying in power engineering, manhole is the key part of the project, which involves many processes such as wall masonry, formwork, steel bar binding, concrete pouring and so on. Once neglected, it may cause engineering quality accidents, especially the manhole on the motorway. Once quality problems occur, the consequences will be serious, so in this part of the construction, strengthen monitoring. Take on-site supervision measures, strictly supervise the construction of all parts, put forward the factors affecting the construction quality in advance, and require the construction unit to prepare preventive measures and construction plans, so as to ensure the construction quality of inspection wells.

Strengthen process control. In the process of construction, Yuxuan Second Construction Team found that the red bricks used by the team had quality problems. Although the contractor has an inspiring laboratory quality inspection report network, in the attitude of being responsible to the owner, the batch of red bricks are sampled in parallel inspection in time, and the construction unit is allowed to use them only after all the strength indexes are determined to meet the design requirements. There are also quality problems in concrete pouring, masonry and wall plastering. In order to ensure the construction quality, I issued a supervision notice in time, requiring the construction unit to repair the defective parts to meet the quality standards required by the design and specifications.

In the supervision work, the construction unit is required to lay the cable pipe according to the design content, design requirements and construction acceptance specifications, and after construction, it is required to cover the soil and tamp it in layers to ensure the quality of the road above the trench.

In the construction of each working procedure, the construction unit is required to strictly implement the national and local construction and installation quality inspection system, check and confirm the relevant construction quality statements submitted by the construction unit in time, and review and sign the completed project quantities declared by the contractor according to the design documents and the provisions on the calculation of quantities in the contract.

Supervision record is an indispensable part of engineering supervision. I have a complete and sufficient supervision diary, which records the relevant situation of the construction site every day in detail, providing a reliable basis for solving the dispute between the owner and the contractor fairly.

During the supervision of the two construction sites, I actively coordinated the relationship between various units to make them cooperate with each other and support each other, and do a good job of linking up to ensure the construction quality and progress.

Through the above work, I completed the underground cable laying of power engineering specialty in XX and XX sites, buried 7552 meters (the number is trench length), and made underground manhole 127, with an investment of 67.54 million yuan. In the CATV project, 2850m upvc pipes are buried underground (the number of times is the length of the ditch), and the underground manhole is 5 1 port, with an investment of 467,000 yuan.

One year's supervision has gained a lot, but there are also shortcomings. For example, I am a civil engineering major, and I don't know much about the professional knowledge of electric power engineering, and I am not familiar with some process requirements. However, the supervision industry requires supervision engineers to have rich knowledge in many disciplines and industries. Therefore, I need to continue to study hard in various disciplines and constantly improve my business ability and professional level.

2. Some suggestions

1) Strictly implement the supervision procedures.

At present, the on-site supervision work is not completely carried out in accordance with the supervision procedures, such as design disclosure, joint review of drawings, first site meeting, introduction of supervision engineers and supervision contents to owners and contractors, formulation of supervision plans and supervision details, etc. , leading to the supervision engineer to the scene after no one cares, do not know the scope of supervision and how to supervise and other practical problems. In order to avoid the recurrence of such problems in the future supervision work, it is necessary to strictly implement the project construction supervision procedures so that the supervision engineer can clearly supervise.

2) Improve the organization of the project supervision department.

Project supervision institutions are fully staffed, with clear responsibilities of chief supervision engineers, professional supervision engineers and supervisors, and complete communication and transportation facilities. Due to the long route and wide area of municipal engineering supervision, only convenient transportation can ensure the inspection and on-site supervision of each construction section, so that there will be no mistakes in the supervision work and the quality of the supervision work will satisfy the owner.

3) Train supervisors and improve the quality of all employees.

Strengthen the training of supervisors, organize employees to seriously study the Supervision Code and the Supervision Code for Municipal Local Engineering Construction, unify supervision standards, participate in various classes organized by the Municipal Construction Committee and the Quality Supervision Station, master new policies and standards, and lay a good foundation for supervision work.

The above is a summary of my supervision work in the past year. Because of the short working hours in the company, some problems may be one-sided, and there are still many shortcomings in the work. Please correct me in my future work.

3. The supervision work year-end summary model essay

Looking back on the past and looking forward to the future, I have the joy of bumper harvest this year, and I also have eager expectations for the future. Happily, with the care and help of leaders and colleagues, I have carefully studied and understood the corporate culture spirit of the company, guided by the company's service concept, and successfully completed my work and the tasks assigned by the leaders through my unremitting efforts. Hopefully, I deeply realize that there are still many shortcomings in the supervision work that need to be studied and improved. I will sum up my experience, reflect on my own shortcomings, improve my supervision business level and become a member of the company in the process of better and faster development. This year's supervision work is summarized as follows:

1. Personal annual main work contents and job responsibilities.

In the first half of 20xx, he mainly participated in the on-site supervision of soft foundation treatment project in the central business district of Weifang Binhai Development Zone, and in the second half of 20xx, he mainly participated in the on-site supervision of artificial beach project in Weifang Binhai Tourism Resort.

In this year's work, I obey the arrangement of the leader and earnestly perform my duties. During my work, I have never relaxed and strengthened my study of theory and practice, and have been strict with myself, serving the construction unit earnestly and enthusiastically, abiding by the requirements of the supervision contract, and performing the supervision duties in strict accordance with the supervision norms and procedures.

In the process of construction, the process control of each working procedure is carried out by means of standing by, patrolling and parallel inspection. Investigate and study the quality and safety problems existing in the site, find out the root causes of the problems, ask the construction party to take effective solutions to solve them, and follow up and supervise the construction party to implement rectification throughout the process to prevent similar problems from happening again.

For materials (high strength geogrid, geotextile, fence board, presser foot block, stepping stone, etc.). ) approach, the relevant inspection data submitted by the construction party shall be inspected according to the standards and design requirements, and the appearance quality of the materials shall be inspected when entering the site. If the appearance quality does not meet the requirements, it shall not be used in the project.

For the construction of key parts of the project, arrive at the station in advance, check the construction preparation work, and make a written record of the station in time and completely.

Acceptance of concealed works shall be carried out in strict accordance with the acceptance specifications. If the acceptance is unqualified, rectification should be carried out, and the next working procedure can only be carried out until it is qualified.

Inform the project management department of the construction unit of the problems found in the inspection in the construction process orally or in writing, and report to the director in time to urge the construction unit to carry out rectification and re-inspection. Try your best to do a good job of supervision in the construction stage of the project.

2. Experience and feelings at work

In the process of supervision work, through the study of supervision theory and the cognition of the development state of supervision industry at this stage, I deeply realize that as a supervisor, taking the initiative to think about the interests of the construction unit, being responsible for the quality of the project and the safety of the construction personnel is the belief and infinite strength of supervision work. Only with high professional skills, comprehensive quality and good professional ethics can we really do a good job in supervision and embody the practice principles of law-abiding, honesty, justice and fairness. Understand the importance of supervision work, establish a correct attitude towards supervision work, deal with various problems in construction with a realistic attitude, so as to effectively carry out work, actively use their professional skills and intelligence, scientifically and fairly exercise supervision rights and obligations, cooperate with the construction unit, meet the requirements of the construction unit, and provide quality and efficient services for the owners.

3. Future work plan and personal career development opinions

As a young supervision worker, I love my job, have a good work style and hard-working spirit, and my work attitude is strictly prohibited. I like to study the causes and solutions of problems in engineering supervision, and I am keen on accumulating solutions to engineering problems.

In the future work, we should conscientiously perform our post responsibilities, strictly follow the national standards, and carry out supervision work based on design drawings. In the work, we should constantly reflect on our own shortcomings, strengthen the study of supervision business, constantly improve our own quality, do a good job in supervision, strengthen the study of management theory knowledge, handle practical problems flexibly, conscientiously complete all the work assigned by leaders, and strive to raise our professional and technical level to a new level and truly become a qualified supervisor.

4. Comments and suggestions on departments/companies

1), it is suggested that the company conduct targeted professional training for different employees and recruit more talents with professional qualification certificates who can work independently.

2) It is suggested that the company organize talents with good public relations ability and set up relevant departments to cope with the socialization of supervision industry and the openness and complexity of supervision bidding.

5. Concluding remarks

The concern and support of company leaders and comfortable working conditions have given me the motivation to work hard. The warm care and cooperation of my colleagues make me feel comfortable and practical in my work, and the unique corporate culture atmosphere of the company makes me full of confidence in my work. I firmly believe that I can do better in my future work and contribute to the development of the company.