Glass Installation Contract 1 Contract (Party A):

Contractor (Party B):

Since Party A needs to buy Party B's glass in the renovation project of Huaping Restaurant storefront, according to the provisions of relevant laws and regulations, Party A and Party B have reached the following terms through consultation on the basis of equality and voluntariness, and shall abide by them jointly.

I. Overview of the Project:

1, project name: original dining room glass installation project.

2. Contract content: The gatepost is made of 8mm black painted integral glass, and the facade needs to be sprayed with words. Cost 120 yuan/m2; The door head is made of 5mm black stained glass, and the cost is 100 yuan/m2; Printing on the tea mirror in the middle of the indoor cylinder, cost: 1 10 yuan/square meter; Indoor decorative cabinet partition 10 mm glass edging installation, cost: 80 yuan/m2; The part that needs to be printed on stained glass shall be appropriately subsidized per square meter.

3. Supply and transportation mode: Party B shall undertake transportation and installation, and Party A shall accept the finished products at the construction site, and the paid-in party shall settle the accounts.

4. The materials must meet the national qualified standards, and the glass must be sealed before spraying special glass paint. The joints should be tight, the glue should be neat and round, the glass must be sealed before painting, and the installation must be safe and firm. If the glass installation is not firm, Party B shall bear all safety responsibilities.

5, time limit for a project, completed within 7 days after signing the contract.

Two. Work of Party A:

1. What is the site representative appointed by Party A to be responsible for the acceptance of the goods?

2. Pay as agreed.

Three. Work of Party B:

1. Party B Tang is the representative of Party B and is responsible for all matters of this project.

2. Party B is responsible for safety.

Four. Price and settlement agreement:

Payment method: Party A shall pay Party B an advance payment of 1 ,000 yuan before June 9, 20xx, and pay it to 95% of the total cost within one week after the completion inspection and acceptance, with the remaining 5% as the quality guarantee, and pay it three months later.

Verb (abbreviation of verb) agreement on liability for breach of contract:

If either party breaches the contract, the breaching party shall compensate the observant party for twice the direct loss. Matters not covered in this contract shall be settled by both parties through friendly negotiation. If negotiation fails, either party may bring a lawsuit to Anxian People's Court according to law.

This contract is made in duplicate, with each party holding one copy. It shall come into effect from the date of signing and terminate when the performance is completed.

Party A (signature): Party B (signature):

Entrusted agent:

Address: Address:

ID number: ID number:

Tel: Tel:

Date:

Glass Installation Contract 2 Party A:

ID number:

Hereinafter referred to as Party A.

Party B:

ID number:

Hereinafter referred to as Party B.

Theme:

Through consultation between both parties, it is agreed that Party A will contract the installation project of glass railings in Xuanhan Yilian Trade City to Party B. In order to clarify the responsibilities and obligations of both parties, the following contract terms are hereby signed for both parties to abide by.

I. Project Content and Contract Scope:

Phase I project of Yilian Trade City, the number of railings is about 100 m; The contract work does not include materials (Party B is responsible for small auxiliary materials).

Second, the quality requirements:

Party B must carry out the construction in strict accordance with Party A's requirements, with full welds, smooth solder joints and qualified quality; During the working period, Party B's personnel must abide by the construction operation rules and obey the reasonable command and arrangement of Party A. ..

Third, the time limit for a project requirements:

Party B must obey the progress of Party A's whole project, cooperate unconditionally, and complete all the quantities on time.

Four, the unit price and quantity calculation method:

40 yuan/m of balcony railing is calculated as qualified railing extension meter.

Verb (abbreviation for verb) Terms of payment:

Party A pays RMB _ _ _ _ _ _ _ _ _ _

The intermediate payment shall be measured on a monthly basis, and 60% of the total price shall be paid according to the completed qualified quantities, that is, 40×60%= 24 yuan per meter;

Pay 90% of the contract price (i.e. 36 yuan per meter) after the glass installation is completed;

After the completion of the project, RMB _ _ _ _ will be deducted, and the rest will be completed within one week. The warranty money shall be paid within ten days after the expiration of the warranty period, and the warranty period is _ _ _ _ _ _.

The responsibility of intransitive verb Party A:

1. Party A shall provide water source, power supply (each building has a special power switch box), railing posts, face pipes and glass for Party B's continuous construction.

2. After the completion of the project, Party B shall promptly notify Party A for acceptance, and Party A shall conduct acceptance within days after receiving the acceptance requirements. If Party A refuses to accept the project, it will be deemed as qualified.

3. In case of any dispute between the two parties on whether the quality acceptance is qualified, the two parties shall entrust a third-party intermediary agency for acceptance to determine whether the project is qualified.

4. Party A shall make safety technical disclosure to Party B before construction, and supervise Party B to carry out the construction according to the requirements of construction specifications.

5. Party A shall formulate safety technical protection measures according to the engineering characteristics and relevant regulations. If Party A stops work, Party A shall pay Party B the loss of work stoppage at RMB/day.

6. Provide vertical transportation facilities or derrick.

Seven. Party B's responsibilities:

1, Party B is responsible for labor protection articles such as safety helmet, gloves, work shoes, screws, welding wires, gas, glass glue, power tools (including wires within 50m) and hand tools used in the construction.

2. Party B shall arrange workers according to Party A's overall progress and obey Party A's reasonable process crossover arrangement.

3. Party B shall carry out the construction in strict accordance with the relevant construction technical operation specifications, individual operation specifications and requirements, and on-site safety technical disclosure. If the installation quality is unqualified, Party B shall be responsible for rework.

4. If Party B's construction and production personnel do not observe labor discipline or operate illegally, all responsibilities and expenses arising therefrom shall be borne by Party B. ..

Eight. Liability for breach of contract:

If either party breaches the contract, it shall compensate the other party for the corresponding losses and pay a penalty of 5,000 yuan.

Nine. Matters not covered in this contract shall be settled by both parties through consultation; This contract is made in duplicate, one for each party. It will take effect after being signed by both parties, and will automatically become invalid after the balance is settled.

Party A (signature):

Contact telephone number:

Party B (signature):

Contact telephone number:

Contract signing time:

Glass Installation Contract 3 Party A:

Party B:

According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, Party A and Party B, through friendly negotiation, have reached the following terms on matters related to the construction of this project, which are expected to be observed by * * *.

I. Project name:

Project location:

Scope of work: glass installation, aluminum plate installation, steel frame design change, exposed concrete columns and beams painted with silver pink acrylic polyurethane anticorrosive finish (subject to the actual design change notice).

Second, the contract period:

Commencement and completion dates: according to Party A's schedule;

Third, the quality standard:

Engineering quality standard: qualified

Four. Contract price:

1, and the purchase price of glass is _ _ _ _ _ yuan/㎡. The cost of single claw material, double claw material and four claw material of glass claw parts is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. The purchase price of aluminum composite plate is _ _ _ _ _ yuan/㎡ (Huatian brand is 4mm thick);

3. The glass installation cost is _ _ _ _ _ yuan/㎡, and the aluminum plate installation cost is _ _ _ _ _ yuan/㎡;

4. The cost of glass structural adhesive is _ _ _ _ yuan/piece, and the installation cost of aluminum plate and steel skeleton is _ _ _ _ yuan/㎡.

5, aluminum fastener material cost _ _ _ _ yuan/㎡;

6. Repaint the paint, remove the glass, and transport the steel to the roof for settlement on an hourly working day.

Verb (abbreviation for verb) Settlement and payment methods:

The warranty period of intransitive verb engineering quality: according to the relevant provisions of the state.

Seven, safety in production:

1. In the construction process, we must strictly abide by the Law on Work Safety, Regulations on Work Safety in Construction Projects, Construction Safety Inspection Standards and various safety regulations related to work safety, and sign a responsibility letter for work safety with Party B. ..

2. Party B shall ensure civilized construction on site according to the requirements of the Owner and Party A. ..

Eight. Party B promises to Party A to carry out the construction and completion in accordance with the contract, and undertake the responsibility of project quality warranty within the quality warranty period.

Nine. Entry into force of the contract:

1. Time of contract conclusion:

2. This contract shall come into effect after being signed and sealed by both parties, and shall automatically become invalid after the price is fully settled. If there are any outstanding matters, both parties shall settle them through consultation.

Party A (signature or seal): Party B (signature or seal):

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Glass installation contract 4 Construction unit:

Construction unit:

Date:

The construction unit of the construction contract (hereinafter referred to as Party A):

The Employer (hereinafter referred to as Party B):

Through equal consultation, Party A and Party B, based on the principle of mutual cooperation, close cooperation and division of responsibilities, have reached the following terms and conditions on the glass curtain wall project of buildings B and C of urban garden apartment for * * * to abide by.

Article 1: Project scope, quantity, unit price and total price.

1 Project scope:

The facade glass curtain wall project of "Buildings B and C of City Garden Apartment" includes the design, supply, processing, installation and completion acceptance data of light gray glass concealed frame curtain wall and transparent glass concealed frame curtain wall in the tower. Among them, mc42, mc39, mc4 1, mqc63, mqc63a, mqc64, mqc53, mqc54, mqc72 and mqc65 are light gray tempered glass curtain walls, and the rest are tempered transparent white glass curtain walls.

1.2 project unit price:

1.3 Total quantities and total price:

1.4 The unit price of this total price remains unchanged at the time of settlement, and the area is settled according to the actual completed area. If there are design changes, engineering negotiations, material changes, etc. The price shall be determined by both parties through supplementary agreement after negotiation.

1.5 This quotation includes the inspection fees for three properties of the glass curtain wall.

Article 2: Engineering Materials

2. 1 glass: the curtain wall glass is made of 6mm thick light gray transparent tempered glass and 6mm thick transparent tempered white glass produced by Dongguan Yintong Glass Co., Ltd., and confirmed according to the glass samples provided by Party B. ..

2.2 aluminum alloy profiles:

6063-t5 aluminum alloy profile produced by Foshan Jingu Aluminum Co., Ltd. is selected. The surface of the aluminum profile is silvery white oxidized, and the thickness of the oxide film meets the requirements of aa 15. It is confirmed according to the samples provided by Party B. ..

2.3 silicone structural adhesive and sealant:

Choose mf8 1 1 silicone structural adhesive and mf889 silicone weatherproof sealant produced by Zhengzhou Zhongyuan rubber factory, and confirm them according to the samples provided by party b. ..

2.4 Curtain wall hole fittings: domestic high-quality seven-character handle.

2.5 Steel components: domestic high-quality q235b steel profiles.

Article 3: Payment Method

3. 1 Within seven days after the aluminum alloy profiles and steel parts enter the site, Party A shall pay Party B 30% of the total contract price as the progress payment for the first phase of the project;

3.2 Party A shall pay Party B 20% of the total contract price within seven days after the installation of aluminum alloy profiles and steel parts is basically completed;

3.3 Within seven days after the glass installation is basically completed, Party A shall pay Party B 20% of the total contract price;

3.4 After the curtain wall installation is completed, Party A shall pay Party B a progress payment of 80% of the total contract amount;

3.4 Within 30 days after the acceptance, Party A shall pay 97% of the total settlement price to Party B, and the remaining 3% shall be paid in one lump sum within 10 days after the expiration of the one-year warranty period from the date of acceptance.

3.5 If Party A fails to pay the money according to the terms of the agreement, Party B will send a written notice to Party A within five days of the agreed time. If Party A fails to pay the project payment on time within seven days after receiving the notice, Party B has the right to stop the construction, and Party A will bear all the economic losses and liabilities for breach of contract caused thereby.

Article 4: Responsibilities of both parties

4. 1 Party A's responsibilities:

4. 1. 1 Provide a complete set of architectural construction drawings and structural construction drawings of this project and related design change materials;

4. 1.2 handle the construction permit;

4. 1.3 Before Party B enters the site, clear the obstacles in the construction site that affect Party B's construction;

4. 1.4 Organize the coordination meeting between relevant units and Party B;

4. 1.5 Organize relevant personnel to jointly review Party B's design drawings and sign them;

4. 1.6 Organize and cooperate with quality inspection and relevant departments to supervise and inspect the project quality, sign and recognize the quality acceptance of sub-projects in time, and handle design changes and other necessary project visa management; If concealed works or intermediate works need to be accepted in the project, if Party A fails to be present for acceptance within 48 hours after receiving the notice, it will be deemed as qualified. The quality meets the specified requirements. After 48 hours of acceptance, if the representative of Party A fails to sign, it will be deemed as approval, and Party B can continue the construction.

4. 1.7 Organize and coordinate the construction cooperation between Party B and the civil construction unit;

4. 1.8 After Party B submits a written report on the completion of the project, it will organize relevant departments to accept the glass curtain wall;

Note: If Party A fails to complete the above work according to the content and time agreed in the terms and conditions, resulting in the delay of the construction period, the construction period will be postponed accordingly.

4.2 Party B's responsibilities:

4.2. 1 The curtain wall can only be designed after it is approved by the design unit with curtain wall design qualification and audited by Party A, so as to ensure that the design meets the requirements of relevant national codes, be responsible for the design quality, bear all consequences caused by the design quality problems, and submit the curtain wall design drawings and calculations to Party A. ..

4.2.2 Carry out the construction in strict accordance with the approved design drawings, obey the supervision and management of Party A's on-site representative and project supervisor, correct the problems found in time, be responsible for the project quality, and bear all consequences caused by the project quality problems;

4.2.3 Prepare the construction organization design and time limit for a project schedule, and submit it to Party A for approval;

4.2.4 Be responsible for the storage of all incoming materials and the protection of finished products before acceptance. If any damage occurs during the protection period, the responsible party shall be responsible for repairing the damage caused by Party B at its own expense, otherwise Party A shall bear the additional contract price for Party B's repair;

4.2.5 Strictly abide by the relevant management regulations of the construction site and the civil construction unit to ensure the construction safety and civilized construction;

4.2.6 Make original records of construction, and arrange two sets of all relevant data of the project as completion data to Party A before completion acceptance.

4.2.7 Provide complete completion acceptance data to ensure acceptance. If the project fails to pass the acceptance on time due to Party B's information or other reasons, the losses caused thereby shall be borne by Party B..

Article 5: Construction Period

5. 1 Commencement date: Party A shall notify Party B in writing seven days in advance.

5.2 Total construction period: 40 days for Building B and 50 days for Building C, calculated from the date of signing the contract, meeting the requirements for scaffold leaving the site.

5.3 Extension of construction period: the completion date is delayed due to the following reasons, and the construction period is postponed accordingly;

5.3. 1 Changes in construction procedures and contents caused by design changes and engineering quantity changes;

5.3.2 Within one week, the cumulative stoppage of water supply and power failure not caused by Party B exceeds eight hours;

5.3.3 Explosion, fire, flood, rainstorm, rainstorm and earthquake, etc. Caused by war, turmoil, falling flying objects or reasons not attributable to Party A and Party B;

5.3.4 Party A fails to pay the project payment as stipulated in the contract;

5.3.5 Other work stoppage not caused by Party B;

5.4 Party B shall submit a written report on the contents of the delay and the resulting economic expenses within 7 days after the above-mentioned situation occurs, and the representative of Party A shall give a confirmation reply within 2 days after receiving the report, otherwise it shall be deemed as agreement.

Article 6: Project Quality

6. 1 project quality grade: ensure the project quality reaches the "qualified standard" stipulated by the state, and strive for excellent projects.

6.2 The project acceptance shall be conducted according to the parameters specified by Party A and the current domestic codes and standards.

6.3 After the completion of the project, Party B shall provide Party A with a quality guarantee to ensure that the construction of the glass curtain wall conforms to the design calculation.

Article 7: Design changes

7. 1 If Party A changes the design, it shall notify Party B seven days before the engineering processing or construction. Where Party B has processed or constructed, Party B shall stop immediately after receiving the notice.

7.2 Party A shall be responsible for the losses caused to Party B due to the untimely change notice.

Article 8: Completion, Settlement and Warranty

8. 1 After the project meets the completion acceptance conditions, Party A shall submit an acceptance application to the competent construction department within ten days after receiving Party B's completion report, and organize relevant departments to conduct acceptance; Failing to apply for acceptance within ten days after receiving Party B's completion acceptance report, it is deemed that the completion acceptance report has been approved and the project is completed, and settlement procedures can be handled; If the project is not accepted, it shall be deemed as accepted.

8.2 After the project is completed and accepted, Party B shall submit the settlement book to Party A, and Party A shall complete the audit or put forward audit opinions within ten days after receiving the statement. If the settlement is not handled within ten days after receiving the settlement report without justifiable reasons, it shall be deemed to have accepted the settlement report of Party B, and the interest of the project shall be paid according to the highest loan interest of the same period from the tenth day.

8.3 The warranty period shall be calculated from the date of completion acceptance, lasting for two years, and shall be implemented according to the warranty clauses stipulated by the state.

Article 9: Stop or postpone the project construction.

9. 1 If the construction of the project is stopped or postponed due to force majeure or reasons other than Party A and Party B, and the contract cannot be continued, both parties shall sign a stop or delay agreement.

9.2 After the project is suspended, Party B shall properly protect the completed project and the purchased materials, equipment and appliances and hand them over to Party A, and evacuate its own mechanical equipment and personnel from the site according to Party A's requirements. Party A shall provide necessary conditions for Party B's evacuation as agreed in the contract, pay corresponding economic expenses, pay the completed project price and compensate Party B for related losses.

Article 10: Other

10. 1 All letters, telegrams and related technical materials signed by Party A and Party B are annexes and constituent documents of this contract.

10.2 Any dispute arising from the performance of this contract shall be settled by both parties through friendly negotiation; If negotiation fails, both parties may apply to the relevant competent department for mediation; If mediation fails, you can bring a lawsuit to the court.

10.3 this contract shall come into effect immediately after being signed and stamped by the legal representatives or authorized representatives of both parties. After taking effect, one party shall not terminate the contract without justifiable reasons, and the party that terminates the contract shall compensate the other party for all economic losses.

10.4 This contract shall be subject to the project acceptance and settlement, and Party A shall pay the completion payment. In addition to the relevant warranty terms, other terms are terminated, and the relevant warranty terms are terminated after the warranty period expires.

10.5 the original of this contract is in duplicate, with each party holding one copy and six copies. All have the same legal effect.

Party A: Party B:

Legal representative:

(or entrusted agent): (or entrusted agent):

Bank of deposit: Bank of deposit:

Account number: Account number:

Tel: Tel:

Fax: Fax:

Address: Address:

Postal code:

Glass Installation Contract 5 Employer: (hereinafter referred to as Party A) Contractor: (hereinafter referred to as Party B)

In accordance with the Economic Contract Law of the People's Republic of China, the Regulations on Construction and Installation Engineering Contracts and relevant regulations, and in combination with the specific conditions of this project, in order to clarify the rights, obligations and economic responsibilities of both parties in the construction process, this contract is hereby signed by both parties through consultation for mutual compliance.

I. Project name:

Second, the project site selection:

III. Scope and content of construction:

Four. Project duration: from _ _ _ _ to _ _ _ _.

The duration of the project is _ _ _ _ _ days. If Party B cannot work normally due to power failure, bad weather and other reasons, the construction period may be extended.

Verb (short for verb) Responsibility of both parties:

1. Party B is responsible for purchasing materials and organizing the materials needed by workers, machines and tools.

2. Party B is responsible for the production and installation of the whole project, and the construction quality should meet the national conformity assessment standards.

3. When entering the construction site, Party B shall obey the unified management of Party A and abide by the safety production discipline. In case of casualties, Party B shall bear the responsibilities.

4. Party A is responsible for the erection and dismantling of scaffolding, and is responsible for issuing invoices to the owner for this project, and the expenses arising therefrom are not included in this contract.

5. Party A is responsible for coordinating the relationship between government and non-government on the construction site.

6. Party B shall promptly report to Party A the changes proposed by the construction unit or other relevant units to this project during the construction process, and the construction can be started only after Party A agrees, and all expenses arising therefrom shall be settled by both parties through consultation.

Six, the project cost and payment method:

1. The project cost is RMB only.

2. Payment method: After Party B enters the site, Party A will pay Party B 50% of the total project price as Party B's material fee. After the skeleton is installed, Party A shall pay Party B 30% of the total project price, and the rest shall be paid in one lump sum after the project is completed.

7. This agreement shall come into force as of the date of signing. After payment by Party A, the Contract shall be terminated.

Eight. This agreement is made in duplicate, one for each party.

Nine. Matters not covered in this contract shall be settled by both parties through consultation.

Employer: Contractor:

Representative: representative:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _