Job Recruitment Website - Zhaopincom - Job responsibilities of civil engineering technicians

Job responsibilities of civil engineering technicians

Responsibilities of civil engineering technicians (15)

In today's social life, job responsibilities are used more and more. Job responsibilities include the scope of work, the responsibility to achieve work objectives, the working environment, job qualifications and the relationship between posts. I believe that most people have a headache about how to make job responsibilities. The following are the job responsibilities of civil engineering technicians I have compiled for you, for reference only, hoping to help you.

Responsibilities of civil technicians 1 1. On the premise of ensuring the project quality, pay special attention to the safety and production schedule management and be responsible for the construction quality;

2. Organize the construction according to the construction specifications and standards, and ensure that the site progress, construction quality and construction safety are effectively controlled;

3. Supervise the construction equipment and materials to enter the site on time and be in a qualified state to ensure the smooth progress of the project;

4, responsible for measuring unreeling, ensure its accuracy;

5, have the responsibility and obligation to cooperate with the builder to do a good job in safe and civilized construction;

6. Organize all kinds of original records of the construction process to ensure the integrity, accuracy and traceability of all kinds of original data;

7. Quality report, various original records of the construction process, and the sign-in form of the person in charge of the construction to ensure its completeness, accuracy and traceability;

8, responsible for the daily construction progress log, do have traceability;

9. Participate in the technical disclosure of the pre-shift employees;

10, responsible for reporting the on-site working status to the foreman at the first time;

1 1. Complete other tasks assigned by the leaders.

Civil engineer 2 1 job responsibilities, responsible for the construction site survey, surveying and mapping, and solving technical problems on site;

2, responsible for the examination and approval of construction technical documents, technical documents;

3. Responsible for the disclosure of construction technical documents, the guidance of technical data and the preparation of technical summary;

4, responsible for organizing the self-examination of construction drawings and participate in the blue prints.the design;

5. Summary, popularization and application of new technologies;

6. Collection and transmission of material technical parameters;

7. Review the technical and quality clauses in the contract;

8, technical and economic accounting, drawing;

9. Inspect and rectify technical training, technical services and technical documents.

Responsibilities of civil engineers 3 1. Technicians carry out various technical work under the leadership of the competent engineer.

2. Be responsible for the preliminary examination of the construction organization design submitted by the construction unit, cooperate with the supervisor in the construction process and be fully responsible for the construction inspection and acceptance of related projects until the completion acceptance is qualified and delivered for use.

3. Be familiar with the construction drawings, construction specifications and quality inspection acceptance evaluation standards, and be responsible for the inspection and supervision of civilized construction such as project progress, safety and fire control.

4, responsible for on-site coordination, solve the contradiction between design, civil engineering, installation in progress and quality.

5. Participate in the bidding and contract preparation of projects, materials and equipment within the scope of the managed projects, and timely supervise, inspect and recognize the supply quality of materials and equipment.

6, sign the information about the project progress, quality and quantity, and report to the chief engineer and department manager, review the project completion information, and report to the documenter for the record.

7, timely and on-site supervision found that not according to the drawings, not according to the specification of the construction behavior, if the site rectification is invalid, cooperate with supervision issued shutdown rectification list, and submitted to the chief engineer.

8. Supervise the on-site safety guarantee facilities and measures, as well as the safety status of personnel and mechanical equipment in the construction process, and put forward rectification opinions in time.

Responsibilities of civil technicians 4 1. Be responsible for the civil technical management of the project.

2. Participate in the preparation of pre-project planning and construction organization design, be responsible for the preparation of project construction operation design, special process operation instruction and safety scheme, and make technical disclosure to foreman, quality, safety, measurement and operation personnel in time.

3. Deepening design of construction drawing and construction scheme; Responsible for project design change, hidden acceptance, construction measures visa and rationalization proposal, and assist in project cost analysis, cost accounting and cost control.

4, according to the construction drawings, construction plans and some engineering work, responsible for the preparation of construction materials, engineering materials demand plan and in charge of the project finished semi-finished products commissioned production plan, to assist ministry of materials and equipment to do a good job of material approach, acceptance and inspection.

5. Participate in project inventory and business activity analysis; According to the division of labor of the project department, issue the construction task list and be responsible for the authenticity and accuracy of the task list.

6. Write the construction log in time, participate in the on-site physical completion acceptance, collect, sort out and keep the engineering technical data, quality assurance data and quality acceptance evaluation data, and do a good job in filing the completion data.

Responsibilities of civil technicians 5 1. Be familiar with construction drawings and be responsible for drawing review. Master the basic contents of construction specifications, standards, drawings and quality inspection acceptance evaluation standards.

2, participate in the preparation of construction organization design and special construction scheme, technical measures, carefully review the technical scheme and supervise the implementation.

3, responsible for solving or coordinating the design department site construction problems.

4. Be responsible for the acceptance management of equipment and materials provided by Party A, and participate in the acceptance and completion acceptance of key working procedures and concealed works.

5. Be familiar with the bidding documents, and be responsible for the bidding of engineering, materials and equipment and the preparation of contracts.

6. Responsible for the file management of project documents and construction materials.

7. Assist in the inspection and acceptance of the project.

8. Complete other tasks assigned by superior leaders.

Responsibilities of civil engineers 6 1. Assist project technical management personnel to control, manage and supervise project quality, and participate in timely inspection, evaluation, rectification and evaluation of project quality.

2. Be familiar with drawings, specifications, standards and technical regulations, participate in technical disclosure of the blue prints.the design and important single projects, and be responsible for reviewing design changes and technical meeting minutes.

3, responsible for the preparation of each division subdivisional work construction scheme and related technical measures, etc. , especially for key working procedures and special working procedures, detailed technical disclosure shall be prepared and the implementation shall be supervised.

4. Collect, fill in and sort out the original records of technology and quality of each division and subdivisional work, collect technical data in the construction process, and be familiar with the filing of technical data.

5. Assist management personnel at all levels in the construction site to make quality records.

6, to carry out technical regulations, rules, specifications and design quality related provisions, decrees, etc. To assist the technical person in charge of the project to implement the project quality and technical management objectives.

7, complete other work assigned by the competent leadership.

Job responsibilities of civil engineer 7 1, participate in the preparation of construction technical scheme;

2. Technical disclosure to site construction personnel;

2, deal with construction drawings, process problems;

3, participate in the construction technology quality inspection and standard setting;

4, responsible for the collection, sorting and archiving of project data;

5. Be responsible for the inspection, control and feedback of the project quality, and be responsible for the construction quality.

Responsibilities of civil engineers 8 1. Familiar with the construction drawings carefully, put forward the problems existing in the drawings, and do a good job of the blue prints.the design.

2. Supervise the builder to do a good job of technical disclosure of each division and subdivisional work, and supervise the builder to make technical disclosure to each team.

3. Assist the survey team in positioning and setting-out, leveling and settlement observation of this project.

4. Under the organization and guidance of the technical director of the project, prepare the construction organization design, special project construction scheme and work instruction.

5. Seriously study the relevant quality management regulations and procedures. Be familiar with design drawings and specifications, be responsible for technical preparation before construction, make disclosure of construction technical scheme, complete specific work such as technical disclosure, and make disclosure records.

6. Assist the builder to allocate and use resources reasonably to ensure that the construction quality of each process meets the standard requirements.

7. Responsible for supervising and inspecting the implementation of technical requirements, rules and specifications in the construction process of each working procedure.

8. Be responsible for supervising and recording the process control of special process (continuous) construction.

9. Assist full-time quality inspectors to supervise and inspect the quality records such as preliminary inspection and re-inspection data in the process of engineering construction, so as to make them accurate, clear and complete.

10. Understand various economic documents such as general contracting, subcontracting and material supply contracts of the project, and put forward reasonable suggestions on increasing and decreasing production of the project from the technical level.

Civil Engineering Technician Job Responsibilities 9 Job Description:

1. Participate in the preparation of the construction organization design, be responsible for the preparation of the construction scheme and technical measures of partial projects, and carry out the construction technical disclosure of partial projects and key parts and processes.

2, familiar with the construction drawings, participate in the design disclosure and the blue prints.the design, sorting disclosure and the blue prints.the design.

3, participate in the preparation of project quality plan and construction work instruction, and is responsible for checking the implementation.

4. Be responsible for the inspection and recheck of the measurement work of this project.

5. Participate in and organize daily quality and safety inspection, and participate in the handling and reporting of quality accidents.

6. Attend the daily meeting, solve the technical problems raised in the production that day, and make a written disclosure on related projects in time.

7, organize and participate in the partial project acceptance and project completion acceptance.

8. Actively cooperate with and participate in the inspection and acceptance of the technical work of the project by the superior competent department and the company, put forward measures for the rectification opinions and organize their implementation.

Requirements:

1, familiar with the practical ability and professional knowledge of construction technology, flexible in dealing with problems and strong in planning;

2, can bear hardships and stand hard work, adapt to the working environment and living environment of the site;

3. Have good organization, communication and coordination skills and team spirit;

4. Be open-minded and eager to learn, have a strong sense of innovation, have a serious work attitude, have a strong sense of responsibility, and have the courage to take responsibility.

Responsibilities of civil engineer 10 1, preparation and disclosure of special technical scheme.

2, deal with the conventional technical problems in the construction.

3. Participate in the preparation and implementation of the new technology development and technology promotion plan of the project.

4. Be responsible for preparing the technical verification sheet and sending it to the owner or design institute for confirmation.

5. Assist the technical director to manage the three-level network plan, and do a good job of time limit for a project visa, plan analysis and summary in time.

6. Responsible for collecting, sorting out and reporting the national standards, industry standards and recommended standards required for the construction and production of the project site.

Responsibilities of civil engineer: 1 1 1. Responsible for the preparation, review and implementation of individual technical measures such as construction organization design, construction progress plan, material plan, construction technical scheme and safety.

2, responsible for the specific, the blue prints.the design design change formalities; Visa materials, material testing, sampling and sending.

3. Be responsible for the writing, sorting, acceptance and filing of the internal pages in the whole process.

4. Cooperate with the quality inspector to organize the inspection and acceptance, quality evaluation and completion acceptance of partial projects and concealed works of this major.

5. Assist the project manager in handling documents and letters related to safety.

Responsibilities of civil engineers 12 1. According to the design requirements, operating procedures and inspection and evaluation standards, technical and safety disclosure shall be made to the production team.

2, supervise the construction process, quality, raw material testing.

3. Monitor the construction process, find the problems in the drawings and construction, solve them on the spot in time, or hand them over to relevant professionals.

4. Review the site construction progress and corresponding reports, and complete the tasks temporarily assigned by the leaders.

Responsibilities of civil engineer: 13 1. Be responsible for controlling the quality of all kinds of materials and equipment entering the project site, controlling the progress, quality and safety of the professional project, supervising and coordinating the design connection between this major and other majors and the cross-construction cooperation on site;

2. Be responsible for reviewing and approving the construction drawing of this project, and put forward optimization suggestions;

3. Be responsible for organizing the implementation of the project construction, and strictly implement the plan control book and plan implementation book approved by the company;

4. Be responsible for the identification and review of all kinds of engineering changes of this major on the project site, and handle and solve all kinds of technical problems on the project site of this major;

5, responsible for organizing the project acceptance and environmental protection and other special testing certification, sorting out and verifying all kinds of completion data of this major;

6. Responsible for cooperating with relevant departments to do a good job in bidding technical support, completion procedures and final accounts;

7. Complete other tasks assigned by company leaders.

Responsibilities of Civil Technician 14 Responsibilities 1: Responsibilities of Civil Technician

1. Carry out relevant national technical policies and superior technical management system, and be fully responsible for the technical work of the project.

2. Organize construction technicians to learn and implement various technical policies, technical regulations, specifications, standards and technical management systems. Implement quality management system standards. Organize technicians to be familiar with contract documents and construction drawings, and participate in construction investigation, blue prints.the design and design disclosure.

3. Be responsible for formulating the construction scheme, compiling the construction technical organization design, and making disclosure to relevant technical personnel.

4. Organize the formulation of various plans and schemes of the project, and assist the project manager in the daily management of site cost, safety, construction period and civilized construction.

5. Organize the quality inspection of the project department, supervise and inspect the production team for self-inspection, mutual inspection and handover inspection, and carry out high-quality engineering activities.

6. Responsible for sorting out the change design report, claim intention report and claim information.

7. Participate in various construction production coordination meetings organized by the construction unit, and prepare annual, quarterly and monthly construction progress plans.

8. Be responsible for the collection, collation and declaration of project pricing and measurement data at various stages of the project.

9. Responsible for the preparation of technical documents for completion, and participate in the completion acceptance.

10. Complete other tasks assigned by company leaders.

Responsibility 2: Job responsibilities of civil engineering technicians.

First, strictly abide by the Interim Provisions on Staff Management of Jilin Agricultural University and the Interim Provisions on Staff Attendance, and be responsible for doing their own jobs.

Second, be responsible for organizing the preparatory work before construction, determine the position of the built building according to the general plan of the construction drawing, and carry out composite positioning and elevation. Arrange temporary road laying.

Third, carefully review the construction drawings, grasp the design intent, and construct in strict accordance with the drawings. In actual construction, if it is found that the design drawings can not meet the actual requirements, it is necessary to report to the leaders in time and go through the design change procedures according to regulations.

Four, understand the bidding documents and construction contract requirements and construction organization design, carefully review the technical scheme, check the construction quality of each process and make records.

Responsibilities of civil engineer: 15 1. Responsible for the maintenance, inspection and maintenance of civil structure, metal structure, interior and exterior decoration, roof platform, office furniture, toilet equipment and machinery of all office buildings in the management office;

2. Responsible for patrol maintenance of public areas;

3. Be responsible for the inspection and maintenance of facilities in the office area of the management office;

4. Be responsible for the inspection and maintenance of buildings and facilities in the public area of the management office.

;