What are the job responsibilities of a construction foreman in a construction project?

1. Be fully responsible for the organization and command of production and construction at the construction site. 2. Participate in joint review of drawings of engineering projects, participate in construction organization design and formulation of construction plans, and be familiar with drawings and design requirements. 3. According to relevant provincial and municipal requirements, ensure safe production and civilized construction settings for temporary buildings at the construction site. 4. Work with engineering and technical personnel to conduct technical briefings for each professional team according to the construction progress plan, drawing requirements and design requirements. 5. Organize and direct each team to carry out construction according to the construction schedule, drawing requirements and design requirements. Organize team leaders to conduct self-inspections on the completion of each sub-division project, and rework those that do not meet the construction specifications and acceptance standards until they are qualified. until. The construction of the next process must pass the acceptance inspection before proceeding. 6. Before construction, we must work with safety officers to do a good job in safety education and technical briefing, resolutely stop illegal operations and barbaric operations, and ensure safe production and civilized construction. 7. Organize equipment operators and maintenance personnel, manage various equipment, keep the equipment in good condition, and make full use of turnover materials. 8. After the completion of the project, organize personnel in a timely manner to store and maintain equipment and turnover materials. 9. Special storage measures should be taken for corrosive chemicals to reduce the source of pollution.

For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd