Job Recruitment Website - Zhaopincom - What equipment does the hydropower station have?

What equipment does the hydropower station have?

To build a hydropower station, we should not only know the accumulated rainfall area of the power station, but also know the annual average rainfall where the power station is built. In terms of cost calculation, it can be estimated like this. When the head and flow of the power station are known, the investment can be calculated at 7000- 1 1000 yuan /kw. It is also necessary to know the traffic situation of the power station, whether farmland and Woods are flooded, whether it is necessary to build a dam, and if it is flooded, it is necessary to know the amount of compensation, the power supply distance and the price of online power supply.

Power equipment, governor, excitation system, synchronization equipment, valve and control system, primary overcurrent protection, primary overvoltage protection, temperature control equipment, braking equipment, main transformer protection, line protection, lightning protection, grounding protection, fire protection system, technical water supply system, cooling system, ventilation system, traveling crane, air compressor, temperature measuring device, DC power supply, booster equipment and secondary high voltage control are needed.