Job Recruitment Website - Zhaopincom - How many square meters of formwork can a formwork worker install every day?

How many square meters of formwork can a formwork worker install every day?

1, with the cooperation of coolies, generally averaging 30~50 square meters (different beams and columns, etc. );

2. Generally, the daily salary of a formwork worker is around 300 yuan, and that of a coolie (per day 150 yuan). According to the contact area between formwork and concrete, it is 20~30 yuan per square meter. According to 20 yuan's calculation, only one formwork of more than 25 square meters needs to be supported.

The mould used for forming concrete structures or reinforced concrete structures consists of panels and supporting systems (including keels, trusses, beams, etc.). And connecting pieces (including bolts, connecting buckles, connecting pieces and connecting pieces between formwork surface and supporting members).

Templates are divided into steel templates, bamboo plywood, wooden templates and plastic plates according to materials.

Bamboo plywood is generally disposable, and other formwork can be coated with release agent and formwork paint to prolong the service life of formwork and cast high-quality piers.

According to its function, formwork can be divided into five categories: shaped composite formwork, universal wooden formwork+steel pipe (or wooden column support), large wall formwork, flying formwork (formwork) and slip form.