What is the construction process of a sunroom?
Ye Yang sun room is an expert in sun room production. The company has multiple patents for sun room and skylight design and technology. It has many years of sun room production experience. It has widely absorbed advanced European and American technology and design concepts, combined with local environment, and targeted Different customers have different needs to create a unique and exclusive healthy sunshine life
Family sunroom installation, 3-person combination
Materials arrive at the construction site-check the integrity of the materials-protect indoor items ——Lifting (transporting) materials and tools to the site——Drawing the installation line according to the drawings——Calculating the column height according to the horizontal line——Connecting and fixing the doors and windows —Finding the level and fixing of the facade windows —Connecting and fixing the side beams—Main beams Fix to the side beams - the secondary beams are fixed - complete the fixing of the side beams - glue the side beams and the wall - complete the doors, windows and top foam glue - slot the insulation wall - put on the wooden boards - put on the insulation boards - Install sinks and exterior trim - apply SBS waterproofing - install skylights - install asphalt tiles - apply door and window glue - install door and window glass - debug hardware - complete internal glue - pack tools - clean up - —Acceptance—fill in the installation acceptance form and the installation is completed.
1. Protect indoor items - items before decoration do not need to be protected. After decoration, attention should be paid to the protection of ground floors, steps and handrails of wooden stairs, and corner protection. protection. Handle with care when transporting, and be careful not to touch the corners of the transported objects with decorations, walls, or ceilings. Cannot be pasted with tape, must be pasted with masking paper.
2. Lift (transport) materials and tools to the site
3. Carefully construct according to construction safety knowledge
4. Draw the installation line according to the drawings - first Trace the lines drawn during the precise measurement clearly and use them as laying conductors for the installation lines. The measurement line is used as the top outer line, and a parallel line drawn 76mm perpendicular to the measurement line is used as the installation line. During installation, the bottom of the side beam is aligned with the installation line.
5. Measure the height and width of doors and windows, and separate the column lines
6. Calculate the column height according to the horizontal line - doors, windows and parapets need to maintain a gap of more than 20MM, so calculate the column When it comes to height, the height of doors and windows must be at least 20MM before the height of the column is determined. When drawing a horizontal line, draw it at the highest point. Therefore, the distance below the horizontal baseline should also be added to the column. Also take the wall height into consideration.
7. Connection and fixation of doors and windows - connect the doors and windows to the columns and corners (5*60 hexagonal drill tail), fix the columns with drill tail screws, find a good level, fix the window to the facade wall, and remove the pressure You need to put it on promptly after the line is finished. So as not to find the crimping line when installing the glass.
8. Fixing the column - align the falling wire and the pull wire to fix the column. It is not necessary to completely align with the installation line. Use a grinder to cut the exposed end of the bolt flush with the nut. Fixed doors and windows.
9. Use the minimum number of bolts to fix the side beams - the side beams against the wall are fixed with two bolts without tightening. The tight gap must be less than 1MM. Then fix it with corner pieces.
10. Connect and fix the columns and side beams - first fix the side beams against the wall, then connect the other side beams, connect them to the window and fix them to the columns.
11. The main beam is fixed to the side beam - the main beam is fixed to the side beam according to the number. Note: After inserting the main beam into place, fix it with screws. The bottom edges of the main beam and side beams must be on the same plane.
12. The secondary beams are fixed - the secondary beams are fixed to the main beams according to the numbers. Note: After the secondary beams are inserted into place, tighten the screws and use ropes to pull the beams on both sides of the secondary beams. Fix it after it is in place.
13. Finish fixing the side beams - there are no tight bolts to tighten the side beams. During the tightening process, the bottom edge of the edge beam is first against the wall. At this time, the gap between the upper edge of the edge beam and the wall is plugged with wooden blocks and then the bolts are tightened. After aligning the edge beam and the installation line, fix the edge beams in sequence. Use a grinder to cut the exposed end of the bolt flush with the nut.
14. Glue the side beams and the wall - use structural weather-resistant glue to seal the seam between the side beams and the wall before installing the glass. When the seam is >15MM, fill it with foam glue and then seal it with structural weather-resistant glue. . When grooving, the groove height is 200MM upward from the top of the side beam, and the insulation needs to be cleaned.
15. Complete the foam glue for doors, windows and roofs - apply the foam that needs to be foamed first.
16. Top the wooden board: Put the corresponding wooden board with the smooth and beautiful side down into the top frame and fix it with screws. If there is an opening, measure it before opening it.
17. Upper insulation board - vertical overlap. Use drill wire to fix the insulation board and the beam. If the interface between the board and the board is warped, use rivets to fix it. Aluminum-plastic panels are placed at the bottom of the floating eaves. Wrap the edges around the aluminum-plastic panels.
18. Install the sink and exterior trim - wrap the edge of the insulation board before installing the sink and exterior trim
19. Install the skylight - route the wiring well , install the hemming of the skylight, hang the skylight on the hem, and make the hanging hem level with the top and top surface.
20. Attach SBS waterproofing - stick it horizontally from low to high, the waterproof overlap is above 5CM, the waterproof extends into the slot and folds upward 5CM, press it with a water-dispersing plate, and fix the water-dispersing plate with screws. Only in this way can the waterproof effect be guaranteed. Attached to sinks and exterior trim, and hanging edges of skylights.
21. Attach asphalt shingles - apply glue or polyurethane on the waterproof surface, stick them in order from low to high, and extend the asphalt shingles into the grooves. Aluminum baffles are attached to the wall and pressed against the asphalt shingles.
22. Glue doors and windows - wear safety belts, use a small glue gun to glue and use weather-resistant sealant before installing the glass.
23. Upper door and window glass: Fix the glass: Place the glass spacer and install the glass sequentially from bottom to top. Open the glass on the fan: use 10MM thick spacers to pad the bottom and side corners of the leaf, place the glass, lift the opening edge of the fan upwards about 10MM, pad the upper corner of the opening edge firmly with spacers, and fix it with glue. Use the spacer, install the pressing line, and press down the opening corner of the fan. After pressing, make sure that the fan opens without touching the hardware and can be opened freely. Use spacers until suitable.
24. Adjust the hardware - ensure it can be opened freely and leave room for the outer corners of the fan to drop.
25. Complete the internal gluing - the glue surface should be smooth, the slant of the glue surface should be at a 45-degree angle with the wall, and the gluing surfaces (slopes) should be of equal width.
26. Pack tools – Put tools away and put them in the tool box in order. Inventory tools.
27. Cleaning - cleaning of top glass and facade glass.
28. Acceptance - first check and accept by yourself, be serious, careful, not in a hurry, and not in a hurry, and then ask the owner for acceptance.
- Previous article:Wages of volunteers in Hong Kong epidemic situation
- Next article:What are the requirements for registered power sales companies?
- Related articles
- How about Compal Electronics Factory?
- How to get to Jimo Chengtou Hot Spring and how much is the ticket for Jimo Chengtou Hot Spring?
- Ping An Bank Recruitment Examination Registration Conditions
- Lanzhou West Railway Station Customer Service Center Manual Service Phone
- What is the major of Dezhou Sifang Technical School?
- How many years was Wenzhou Mobile Hall built?
- Is Liaocheng Xiangjiang Primary School easy to enter?
- Does Hangzhou Olympic Sports Center Gymnasium have air conditioning?
- What are your strengths and weaknesses (four articles)
- How much does Chongqing matchmaking company generally charge?