Job Recruitment Website - Zhaopincom - What are the procedures and precautions for the renovation of new houses in Zigong?
What are the procedures and precautions for the renovation of new houses in Zigong?
Steps to decorate the house: First, if your house is a second-hand house, you can ask the handyman to remove the unnecessary equipment and clean it up first. In the second step, the master of water and electricity enters the site to do concealed works such as water and electricity pipelines and pressure tests to prevent water seepage and leakage. The third bricklayer came into the field to paste tiles and floor tiles to level the ground. Fourth, carpenters enter the ceiling to make cabinets and floor keels; fifth, painters enter the floor to paint walls; sixth, hydropower masters enter the floor to install bathroom equipment and electrical equipment. At this time, you can notify the installation of floors, cabinets and home appliances (all of which are installed by manufacturers free of charge). After all, in in addition to formaldehyde, you will insist on opening doors and windows every day for half a year, and you can move into your new home when the index reaches below 0.08. Please adopt it.
- Related articles
- How about Tianjin Boeing?
- Where can Suzhou Garden Card go?
- What are the industries that industrial design majors can work in?
- Which is better for wire cutting?
- Which is better, Shanghai welding machine or Kinned welding machine?
- What is the treatment of Fabao in Hefei? com£¿
- Top ten brands of floor heating pipes in China
- Dalian is the monthly salary of the Electric Power Bureau
- Is Jinjiang International (Group) Co., Ltd. a state-owned enterprise?
- What are the characteristics of Cangzhou Technical School?