Installation method of Nantong central air conditioning system

The installation of Nantong central air conditioning system is a complicated process, which requires experienced professional and technical personnel. The following are the basic steps to install Nantong central air conditioning system:

1. Design. Before installation, you need to design and understand what kind of air conditioning system is needed to meet the demand. This includes the type and quantity of air conditioning systems, the size and location of air conditioning equipment, and the layout of pipes and circuits. The key to design is to ensure that the installation can physically adapt to and meet the requirements.

2. Install air conditioning equipment. Installing air-conditioning equipment means fixing the air-conditioning system equipment on the bracket with bolts, and connecting the drainage pipe, condenser and power supply to the appropriate pipes and wires. Precautions include ensuring that pipes and circuits do not pass through important structures or other obstacles, such as cables and pipes. It is also necessary to ensure that the circuit meets building codes and safety requirements, such as using appropriate types of wires and circuit breakers.

3. Install the exhaust pipe. The exhaust pipe connects the air conditioning system with the outside air. These pipes must have proper diameter and shape in order to exhaust air effectively. It is also necessary to ensure the position and direction of the exhaust pipe to avoid potential safety hazards such as air pollution.

4. Install the piping system. The piping system consists of copper pipes, insulating materials and connectors for conveying refrigerants. During installation, ensure that all connection points are installed correctly, without air leakage, and the connected pipes will not affect the normal activities of the lobby.

5. Connect the power supply. The air conditioning system needs to be connected to the power supply. A suitable power cord should be installed and connected to the main power interface of the building. The power cord should have proper thickness and electrical specifications.

6. test. After the installation is completed, a test should be conducted to check whether the air conditioning system works normally, so as to ensure that the air conditioning requirements can be met during normal use. Air leakage test of air conditioning system is needed to verify whether the pipes and connections are installed correctly, whether there is gas leakage and air pollution.

7. Maintenance. After installation, regular maintenance and inspection are needed to ensure that the air conditioning system can always work normally. Maintenance includes cleaning filters, refurbishing systems and checking connections.

The above are the basic steps for the installation of Nantong central air conditioning system. Because the installation process is complicated, it must be carried out by professionals. If you need to do this work, please try to find a good engineering company to ensure safety and legality, and ensure the smooth installation process.