How to write an acceptance report?

201X Hospital Preparation Project Acceptance Request Report

The Report Network authoritatively releases the 201X Hospital Preparation Project Acceptance Request Report. For more information about the 2018 Hospital Preparation Project Acceptance Request Report, please visit the Report Network.

xx Municipal Health Bureau:

After nearly two years of preparatory work, xxxx Hospital has been basically completed and basically has the conditions for opening. We are now submitting the acceptance report and various materials of our hospital. Please approve the acceptance and provide guidance.

Sincerely

Salute

xxxx Hospital Preparatory Team

December 19, 201X

1. Hospital Basic situation:

Since our hospital received the approval document from the Municipal Bureau for the establishment of a medical institution on April 10, 2012, with the care and help of leaders at all levels and relevant departments, the work has been progressing smoothly, and all work has been progressing smoothly. Finished better. In the early stage, decoration and supporting facilities were completed according to the hospital's functions and department settings, professionals at all levels and types were recruited, technical talents were introduced, and various large and medium-sized medical equipment were purchased. Some are gradually entering the installation and commissioning stage. Various system construction and job training for all employees have been completed. According to the current situation of the hospital, the conditions are basically ready for opening clinics. Leaders and experts are invited to provide further guidance.

2. Hospital department setup:

3. Hospital personnel composition:

At present, the total number of employees in the hospital is 121. All types of personnel at senior, middle and junior levels are basically in place, with a reasonable structure and can meet the needs of clinical medical work. (Staff roster attached)

IV. Hospital system construction:

In order to strengthen medical quality management, prevent medical errors and accidents, further improve medical quality and medical standards, and better serve People's Health Service. According to the actual situation of our hospital, various medical rules and regulations, administrative management systems, medical and nursing technical operating procedures, hospital emergency plans, employee manuals, etc. have been formulated and compiled into volumes to facilitate staff learning. The establishment of the above systems will undoubtedly fully guarantee the strengthening and improvement of various management tasks in our hospital, standardizing various medical behaviors, further improving medical quality, and promoting the healthy development of the hospital. (Attached are medical institution regulations and medical institution technical operating procedures)

5. Purchase of basic instruments and equipment:

According to the needs of the hospital’s business work, it is equipped with various clinical medical equipment. Equipment is arriving one after another, and some are still being installed and debugged. The outpatient wards are equipped with all basic equipment and infrastructure to meet the needs of clinical medical work. (Attached is the equipment list)

6. Staff training of the whole hospital:

In order to further improve the quality of employees, fully explore the potential of each employee, and continuously enhance the ideological awareness and work awareness of all employees , sense of responsibility and service awareness, and establish the spirit of hard work, professionalism, dedication and team spirit among employees; the hospital attaches great importance to employee training and has successively conducted various trainings for all employees. We also organized employees to learn various hospital rules and regulations, technical operating procedures, infectious disease prevention and control laws, nosocomial infection knowledge, disinfection and isolation knowledge, medical waste disposal and other different knowledge. We also held fire protection knowledge lectures, so that employees can enhance their awareness of fire protection, learn fire protection knowledge, avoid and eliminate potential dangerous factors, and ensure the safety of public, collective and personal life and property. The hospital often organizes business lectures for employees to continuously improve business knowledge and skills, enhance academic awareness and academic level, thereby improving their medical knowledge. The above preparations we made before the opening of the clinic have laid the foundation for the smooth opening of our hospital and will also have a positive role in promoting the future work of the hospital.

7. Basic situation of the disinfection supply room:

The disinfection supply room is an important department of the hospital and is mainly responsible for the medical disinfection supply work of the entire hospital. The leaders of the hospital attach great importance to this and have invited professional health technicians to guide the construction. The commissioning has now been completed and senior nursing staff have been appointed as department heads, which can meet the disinfection supply needs of the entire hospital.

8. Medical waste disposal:

Hospital leaders attach great importance to the disposal of medical waste. We have signed a medical waste incineration intention contract with Kangsheng Company, and all medical waste in the hospital will be recycled and disposed by the company.

Our hospital has a temporary storage place for medical waste, and the different storage points for medical waste and domestic waste are marked respectively. There is a dedicated person responsible for recycling and completing various registration tasks. The temporary storage of medical waste meets all requirements. The room is airtight, has door locks, is rodent-proof and anti-theft, and the safety measures meet the requirements. There are lights in the room and ultraviolet lamps are installed to ensure regular disinfection to prevent iatrogenic waste from causing environmental pollution.

9. Regarding hospital environmental assessment:

The hospital attaches great importance to environmental protection work. The medical waste hospital has signed a medical waste incineration intention contract with Kangsheng Company. All medical waste in the hospital will be recycled and disposed by the company, and it has become an infectious disease department. It has established relevant rules and regulations for nosocomial infection, disinfection supply, garbage disposal, etc., as well as a hospital infection team. It has positive significance for protecting the environment and reducing pollution.

In view of the fact that all preparations in our hospital are in place, we would like to request our superiors to arrange for experts to visit our hospital for acceptance guidance.

Equipment acceptance report template

Equipment unpacking acceptance record

Xxxxxx unit October xx

1. Appearance inspection

1. Take photos and records of the equipment and outer packaging, check whether the outer packaging of the equipment is intact, whether it is damaged, soaked, damp, deformed, etc., and check the surface and packaging status of the outer packaging box;

2. Check whether the surface of the equipment and accessories is damaged, rusted, bruised, etc., focusing on checking whether the rotating impeller is damaged, the main components and the main working surface;

3. If the packaging is found If there is any damage, damage, rust, signs of use, etc. to the equipment and accessories, detailed records should be made, focusing on taking photos and keeping records, and promptly completing the return, exchange and claim procedures with the supplier.

2. Quantity Inspection

1. The quantity inspection should be based on the supply contract and packing list, check the specifications, models, configurations and quantities of the host, accessories and other equipment, and Inspect and verify each piece;

2. Carefully check whether the accompanying information is complete, such as instructions, product inspection certificates, warranty certificates, etc.;

3. Pay attention to checking the serial number and serial number of the equipment. Factory serial number, which can be checked online if necessary;

4. Carefully make records of unpacking and counting, indicating the location, time, participants, box number, product name, expected and actual quantity, if found Problems such as shortages and mis-delivery must be recorded in a timely manner and relevant materials retained.

3. Fill in the acceptance record form

1. After the box acceptance is completed, if any item is found to be inconsistent with the requirements of the contract documents, it must be approved by the supplier’s representative (signature, stamp, etc.) chapter).

2. Write the equipment unpacking inspection record sheet, serial number and factory number, and site photos as part of the equipment acceptance document.

Equipment unpacking and acceptance record form

Number:

House decoration completion acceptance report

The report network authoritatively releases the house decoration completion acceptance Report, for more information about the house decoration completion acceptance report, please visit the report website.

Client:

Client’s contact number:

Entrusted project acceptance unit:

Project acceptance inspection personnel:

p>

Supervisor:

Project acceptance address:

Project completion acceptance basis: "Quality Acceptance Standards for Home Decoration Projects"

Project Overview:

This project has two bedrooms, two living rooms and one bathroom, with a construction area of ??37 square meters and a floor height of 2.8 meters.

Conclusion on the acceptance of the completed house decoration:

1. The decorative surface of the project is hollowed out and cracked in many places (see diagram ③⑤⑧⑨⑾ of the order form), and the acceptance is unqualified.

Basis: Standard 9.0.2 putty should use water-resistant putty. The putty and the matrix are solid, firm, non-peeling, non-powdering and non-cracking.

2. The paint on the first hall door and door frame has brush marks and dripping (see diagram ⑿ of the order form), and the acceptance inspection fails.

Basis: Standard 9.0.3 The paint surface should be smooth, smooth, without leakage, peeling and stains, the varnish wood grain should be clear, there should be no edges, sagging or wrinkles on the large surface, and the color should be basically the same. No brush marks. Hardware and glass are clean.

3. The hollow rate of the floor tiles in the first hall is 20.8%, the hollow rate of the floor tiles in the second hall is 12.5%, and the hollow rate of the bathroom wall tiles is 5.98% (see the diagram of the order form ②⑩⒀). This inspection fails.

Basis: Standard 8.1.4 Wall and floor tile paving should be smooth and firm, with clear patterns, no dirt and slurry marks, basically the same surface color, uniform joints, and no cracks, dropped corners or missing edges. The hollow rate at the corners of a single board shall not exceed 5% of the quantity.

4. The wall power cord is directly buried in the plaster layer without a conduit, and the connector at the top power cord branch is not inserted into the terminal box (see diagram ⑦ of the order form), and the acceptance of this item is unqualified.

Basis: Standard 3.0.2 Electrical wiring should be laid in concealed tubes. There should be no knots or kinks in the wires. The distance between the wires and telephone lines and closed-circuit television lines should not be less than 50 cm. They are not allowed in suspended ceilings. If there are exposed wires, it is strictly prohibited to bury the wires directly in the plaster layer.

5. The water supply pipe is not fixed and the pipe is bent (see diagram ⑥ of the order form), and the acceptance fails.

According to standard 2.0.2, pipeline installation should be horizontal and straight, firmly laid, and the slope meets the requirements. Valves and faucets should be installed straight, flexible and convenient to use. The exposed pipes should be painted with anti-rust paint, and the hidden pipes should be painted with anti-corrosion paint.

6. There are signs of water seepage around the toilet seat and drain outlet (see instruction 1 in the power of attorney). Because there is no water source, the water test cannot be conducted (the results will be determined after there is a water source).

Reporter: