How to calculate the labor cost of fire protection installation in workshop

The calculation method of labor cost for workshop fire protection installation is as follows:

1, fire box, factory indoor fire box installation 1, 300 yuan/set, calculated according to the drawings.

2. For spraying, spraying installation in office area, factory area and basement 120 yuan/month, including other expenses. If there is a suspended ceiling, increase the labor cost and pay it to the construction team every 50 yuan. The enclosure wall of the main spray pipeline is1.5m, and the outfield pipeline is counted separately.

3. The KBG of fire-fighting electricity and indoor pre-embedded exposed assembly electric bushing is calculated as 10 yuan/piece, and the slotting of electric bushing is calculated as 15 yuan/piece (smoke, temperature, broadcast, telephone, alarm, manual alarm, sound and light, module) as 1 10 yuan.

4. The labor cost of water pump house and water pump house is calculated according to Jiangsu quota of 20 14 80 yuan/man-day.

5. The outfield fire pipes, spray pipes, outdoor fire hydrants and water pump adapters are calculated according to 45 yuan /m, and the fire hydrants and water pump adapters are calculated according to 150 yuan/set, for example, (the labor cost of earthwork excavation and backfilling+pipeline installation is settled according to 65 yuan /m).

The data are for reference only.