What do you need to know when opening a beverage factory? How much does it cost?

First of all, the venue, how big and how big the factory building is, for example, 2,000 bottles of drinks or water per hour, the minimum factory building requirement is 800 square meters, but if you don’t have 500 square meters, it will be fine.

1. Water treatment. Reverse osmosis is about 40,000-60,000.

2. Filling machine. If the daily output is required to be 1,000 pieces and overtime production is possible, a rotary filling line with a capacity of 1,000-1,500 bottles/hour is sufficient. A complete set of better quality does not exceed 150,000.

3. Equipment materials and key components. In order to be durable, the equipment must be made of 304 stainless steel. In addition, pipes, valves, pumps, etc. need to be made of better quality.

4. If it is PET bottled, there are facilities for pouring bottles, cooling and other facilities in the back process.

5. One half-ton coal boiler, plus installation and modification, etc. 20,000.

6. The height of the factory building should be more than 4M and the area should be more than 700 square meters (one line).

7. Pure production equipment can be obtained for about 350,000 to 400,000, but auxiliary facilities are relatively expensive now, such as factory renovation, personnel disinfection facilities, cleaning workshops, laboratories, etc., which are estimated to cost 300,000. Yuan is relatively safe.

8. In addition, rent and reserve funds also need to be prepared at least 300,000 yuan.

9. Therefore, it now takes at least 1 million yuan to open a beverage factory that can produce stable quality and maintain survival.

10. It should be noted that once started, there is no turning back. Investors in small beverage companies often only focus on equipment investment costs and ignore supporting facilities, auxiliary facilities, start-up expenses, QS declaration, customized molds, etc. Post-production expenses and time costs such as packaging design, plate making, recruitment, training, trial production, etc. Develop more than two sets of plans and emergency measures and implement them carefully.

I hope my answer can help you.