Job Recruitment Website - Zhaopincom - The latest news of Jiaxing tram: Jiaxing tram terminal line.
The latest news of Jiaxing tram: Jiaxing tram terminal line.
The latest news of Jiaxing tram
With the smooth progress of the urban tram project, it is expected that the first train of Jiaxing tram "Nanhu" will arrive in Jiaxing in February this year, and then the joint debugging and test of the tram demonstration section will be carried out simultaneously.
It is understood that the demonstration section of the first phase of the tram project (Jiaxing South Station-Jiaxing Railway Station) mainly involves the 19 traffic intersection. At present, Shi Xue Road and Gongfang Road have been paved. At the same time, four intersections of Qingfeng Road South Third Ring Road, Qingfeng Road Wenxian Road, Shuangxi Road, Public Housing Road Zhonghuan South Road and Linggongtang Road have been opened to traffic, and Quanfu Road, Qingfeng Road Wenxian Road and Wuqiao are the three routes of the whole highway.
The tram network planned to be built in the near future includes T 1, T2 and T6 lines.
T 1 (Xiu Yuan Road Station-Jiaxing South Station) is 20.2km long, with 3 1 station;
The first phase of T2 Line (North Bus Station-Science and Technology City Station) has a total length of13.7km, with 23 stations.
The first phase of T6 line is the connecting line between T 1 line and T2 line, with a total length of1.8km. There are three stations from the middle school attached to the experimental middle school.
There is a parking lot (located in the northwest of Laishibang Road-Qingfeng Road) with an area of about 3.8 hectares.
run time
According to the current plan, Jiaxing tram will operate from 5:30 am to 23:30 pm 18 hours. In practice, it can be adjusted according to the first and last bus time of high-speed rail and bus. In terms of bus connection, it is planned to build transfer hubs at the transfer nodes of T 1 and T2 lines. There are four transfer stations on the whole line. They are Pingshan Station (T 1 transfer with T2 line), Gongfang Road Station (T 1 transfer with T2 line), Experimental Middle School Station (T 1 share the platform with T6) and Affiliated Middle School Station (share the platform with T6).
Station setting
According to the current planning, the stations are basically near intersections, and most of them pass through crosswalks.
Organize street passengers, and reserve a parking area of about 15m between the station and the crosswalk line to ensure the safety of pedestrians crossing the street.
In stations with large passenger flow such as transfer station, Pingshan station and Hexing Road station, consider setting up pedestrian underpasses to cross the street; Set up footbridges at Nanhu Lakeside Station and Jiaxing No.1 Middle School Station.
Jiaxing trams are mainly laid on roads, and some nodes will adopt underground section scheme, such as Jiaxing Station under the railway. At present, the specific route plan is still under in-depth study and needs follow-up planning.
- Related articles
- How many people are there in the senior high school entrance examination in Guangze County this year?
- Xingyang no 1 high school girl was killed in the toilet.
- Where is Putian dry goods wholesale market?
- Yuan, the fox of Haian, is leaving.
- Which country is Dalu 1 Toothpaste from?
- I worked as a security guard in Zhangzhou Postal Savings Bank, Fujian Province, and I was good at correspondence and computers. Can I transfer to other departments in the future? I have no internal re
- How is Beijing Changhong Hospital?
- Goals and Framework
- Taizhou City Investment Group Co., Ltd. subsidiary benefits
- I'm from Huludao, like a bank in Xingcheng. How can I get in?