Job Recruitment Website - Zhaopincom - Nanjing subway operation time

Nanjing subway operation time

Nanjing subway operation time, the first bus is between 5: 40 and 6: 00. The last bus is between 22: 00 and 23: 40.

For details about which line and which station, please refer to the following table:

Different lines have different operating hours.

Extended data:

As of May 2020, the north extension of Metro 1, the west extension of Metro Line 2, Line 5, Line 6, Line 7, Line S6, Line S8 south extension, Line 9 Phase I and Line 10 Phase II are under construction; The third phase of Line 3, the second phase of Line 4, and the first phase of Line 1 1 have entered the preparatory stage, and construction will be started one after another before the end of 20021.

In 20 18, the cumulative passenger flow of Nanjing Metro was11250,000, an increase of 654.38+355 million people compared with 20 17, with an increase of 13.9%. The average daily passenger flow is 3,047,900 passengers, an increase of 370,900 passengers compared with 20 17, an increase of 12.2%. As of June 20 19, the average daily passenger traffic of Nanjing Metro was 3.53 million, and the highest daily passenger traffic was 4155,000.

1April 999 15, the state approved the official project of Nanjing subway, and Nanjing became the sixth city to be approved for subway after Beijing, Tianjin, Shanghai, Guangzhou and Shenzhen. On May 28th, Nanjing Metro Engineering Construction Headquarters and Nanjing Metro Corporation were established. Nanjing Urban Rapid Rail Transit Network Planning has planned 6 subway lines, 2 subway branches and 3 light rail lines.

Nanjing Metro 1 Line, Line 2 and Line 10 all use six A-type trains, Metro Line 3 uses six A-type drum trains, Metro Line 4, Line S 1 Line S3 use six B-type drum trains, and Metro Line S8 uses four B-type drum trains.

All trains in Nanjing Metro adopt overhead catenary, and the pantographs of trains slide on the catenary to receive electricity. The gauge is 1 .435m, of which1,2, 4 and 10 are jointly manufactured by Nanjing Puzhen Vehicle Co., Ltd. and Alstom France, and Line 3 is transported to Sweden by Nanjing Puzhen Vehicle Co., Ltd., Xinyu Group and Bombardier Company.

As of August 2020, according to the rail transit planning in Nanjing Urban Master Plan (20 18-2035), by 2035, there will be 27 lines in Nanjing subway network planning with a total length of 1030 km. Among them, there are 17 urban trunk lines, including subway 1-17 lines; There are 10 lines in the city express line, of which S 1 line -S9 line and airport express line are temporarily named as 18 line.