Job Recruitment Website - Zhaopincom - China Railway Bridge (Nanjing) Bridge and Tunnel Diagnosis and Treatment Co., Ltd. Is this unit an enterprise or a public institution? What do you mainly do in this unit?

China Railway Bridge (Nanjing) Bridge and Tunnel Diagnosis and Treatment Co., Ltd. Is this unit an enterprise or a public institution? What do you mainly do in this unit?

It is a central enterprise unit.

The main work in this unit can refer to the recruitment requirements of this unit:

(a) bridge engineering or civil engineering and other similar majors

One or more degrees: including talent introduction, civil engineering and other similar majors who require graduation thesis or engage in projects or research in the direction of bridges during school;

(two) tunnel engineering or geotechnical engineering and other similar majors

One or more degrees: including talent introduction, similar majors such as geotechnical engineering. Require graduation thesis or engage in projects or research in tunnel direction during school;

(3) electrical engineering or other similar majors

Bachelor degree or above: including talent introduction, similar majors and other requirements, with the ability of network communication, data acquisition and transmission, intelligent system integration and so on.

(four) software engineering or computer technology and other similar majors.

College degree or bachelor degree, including social recruitment, computer technology and other similar majors, requires the ability to build software frameworks and codes;

(5) HVAC engineering or other similar majors.

Bachelor degree or above: including talent introduction, similar majors and other requirements, with the ability of air dehumidification system design, system integrated control and so on.

Extended data:

19 An earthquake with a magnitude of 6.0 occurred in Yibin at 22: 55 on June, and more than ten aftershocks have occurred since then.

Cheng Gui Special Bridge Health Monitoring System (Jinshajiang Highway-Railway Bridge Health Monitoring System) built by Bridge and Tunnel Diagnosis and Treatment Company is located in Yibin. After the feedback from Yibin Power Station of Chengdu Railway Bureau, the personnel of the bridge and tunnel diagnosis and treatment company immediately organized the inspection and analysis of the bridge monitoring data.

According to the time history analysis chart automatically issued by the system, the owner can be called back within one hour. After the comparative analysis of the structural response under the two earthquakes at 22: 55 and 23: 35, a complete data report was sent to Yibin Power Station at about 3: 30 am on June 18 as a basis for maintenance. The bridge and tunnel diagnosis and treatment company recorded the structural response data during the earthquake. After the incident, the system worked normally and the bridge structure responded.

China Railway Bridges and Tunnels-Recruitment Guide

The monitoring system of China Railway Bridge and Tunnel Company completely recorded the data before and after Yibin 6. 17 earthquake.