Model essay on rectification report format. Rectification means correcting past mistakes. The rectification report is a serious style, with accurate words and standardized writing format. Below, I will give you a brief understanding of the model text of the rectification report format.

Rectification report format 1

From June 9 to July 20, 2000, the Intensive Inspection Team of Air Pollution Prevention and Control of the Ministry of Environmental Protection inspected our district, and found that the pollution control facilities of 2/kloc-0 enterprises in our district were not operating normally, and the scattered pollution investigation was not thorough. Qingyuan District attached great importance to it, made careful arrangements, conducted in-depth research on existing problems, put forward specific rectification measures, made clear the time limit for completion, and instructed relevant departments to immediately organize rectification and finish it on time. The specific situation is now reported as follows:

1. Qingyuan District Luo Jiaying Yuanfeng Petrochemical Gas Station

The problem of distribution:

1, no EIA approval procedures.

2. Oil and gas recovery device is not installed.

Implementation of rectification: In view of the existing problems, the Environmental Protection Bureau of our district issued a notice of environmental monitoring site and ordered it to suspend business. At present, the refueling equipment has been completely dismantled and the oil storage tank has been filled with water and sand.

Second, the unnamed iron powder factory.

Assignment problem: the supervision team refused to check when presenting the law enforcement certificate.

Implementation of rectification: after investigation, the factory belongs to the enterprise of "scattered small and disorderly pollution" and has been banned according to "two breaks and three cleanups".

Three, Baoding Dongfanghong Machinery Manufacturing Co., Ltd.

Assignment problem: The factory was producing at the time of on-site inspection, DF-2 workshop was painted in the open air, VOCs were discharged unorganized, and there were no collection and treatment facilities and paint barrels discharged at will.

Implementation of rectification: In view of the existing problems, the Environmental Protection Bureau of our district dismantled the painting equipment of the enterprise and stacked the paint barrels in a fixed place in an orderly manner.

Fourth, Beite Heavy Industry.

Assignment problem: on-site inspection shows that the factory is in production, 1, and there is no environmental protection procedure; 2. Paint heavy machinery products in the open air, without waste gas collection and treatment device and unorganized emission of VOCs3. During the welding process, waste gas collection and treatment facilities are not installed, and waste gas is directly discharged.

Implementation of rectification: In view of the existing problems, our district organized the Baituan township government and the Environmental Protection Bureau to jointly enforce the law, which has been banned according to the "two breaks and three cleanups".

Verb (abbreviation of verb) Baoding Yiyou Furniture Co., Ltd.

Assignment problem: On-site inspection shows that the factory is producing, there is no VOCs collection and treatment facility during the painting process of furniture plates, and VOCs are discharged unorganized.

Implementation of rectification: In view of the existing problems, our district has stopped production and dismantled the painting equipment (wooden roller painting equipment) of this enterprise, and the rectification has been completed at present.

Six, Qingyuan District Xinyang Machinery Factory

Assignment problem: on-site inspection shows that the factory is in production state, 1, products and equipment are painted in the open air, there is no waste gas collection and treatment facility, and VOCs are discharged unorganized; 2. Exhaust gas collection and treatment facilities are not installed in the welding process, and exhaust gas is directly discharged.

Implementation of rectification: In view of the existing problems, our district requires enterprises to stop production and implement rectification measures. At present, 12m _ 6m closed painting workshop has been built, and ultraviolet oxidation waste gas treatment equipment has been installed. The welding workshop was sealed up and several mobile flue gas purification equipment were installed. At present, the rectification has been completed.

Seven, Baoding South Hong Guang Carton Factory

Assignment problem: The factory was producing at the time of on-site inspection. VOCS treatment facilities are not installed in the printing workshop; Ink wastewater is discharged into the sewer pipe put down by the equipment, and then directly discharged.

Implementation of rectification: after investigation, the factory is located in Luzhuang Village, belonging to Jiaozhuang Township, Lianchi District, Baoding City, and not under the jurisdiction of our district.

Eight, Qingyuan County Chengxin Washing Factory

Assignment problem: The factory was producing at the time of on-site inspection. When the inspectors arrived at the factory gate, the employees saw the law enforcement vehicles and closed the factory gate urgently. 10: 05, the inspector knocked on the door 10:20, 1 male and 1 female two employees went to ask about the situation. After the inspectors identified themselves, they not only refused to open the door, but also the local township government staff surnamed Liu came to open the door. The factory director did not open the door for a long time, the law enforcement officers failed to enter the factory, and the enterprise had enough time to temporarily open the treatment facilities.

Implementation of rectification: In view of the existing problems, law enforcement officers in our district criticized and educated the person in charge of the factory, explained the Environmental Protection Law and other relevant laws and regulations, and asked them to actively cooperate with environmental inspection. According to relevant laws, he was fined 50,000 yuan, which has been paid.

Nine, Qingyuan District Unknown Aluminum Ingot Smelter

Assignment problem: The factory did not produce at the time of on-site inspection, and the aluminum ingot smelting furnace in the smelting workshop was not equipped with waste gas collection and treatment facilities.

Implementation of rectification: After investigation, the stall was illegally operated. In view of the existing problems, law enforcement officers in our district banned the stall on May 24, paid a return visit to the stall on August 5, and thoroughly cleaned the factory according to the principle of "two breaks and three cleanups".

X Qingyuan Huaqiang metal die casting co., ltd.

Assignment problem: The company was producing at the time of on-site inspection, 1 aluminum melting furnace collection and treatment facilities were damaged, and there was a hole at the top of the collection cover; 2. The waste gas collection and treatment cover of the foundry workshop has been separated from the pipeline and cannot be collected, and the waste gas of the workshop is directly discharged through the roof ventilator; 3, waste gas collection and treatment facilities are not enabled, workers on-site inspection temporarily open; 4. There is no waste gas treatment facility in the smelting workshop on the right side of the factory entrance, and the smelting furnace uses coal as fuel.

Implementation of rectification: In view of the existing problems, the Environmental Protection Bureau of our district ordered the enterprise to stop production and rectify immediately. At present, the maintenance and repair of waste gas treatment facilities have been completed, and the smelting equipment on the right side of the plant has been completely dismantled. At the same time, the company has been fined 654.38 million yuan according to the relevant laws and regulations on environmental protection, and the punishment has been put in place.

Eleven, Qingyuan District Caiqiao Door Industry Factory

Assignment problem: The factory is in production and has the following problems: 1. The factory is using two coal-fired boilers (there is no nameplate identification, and the initial judgment on the spot is 0.3 tons of steam), with coal as fuel, supporting bag dust removal facilities, no desulfurization facilities, and direct discharge of SO2 flue gas; 2. The painting workshop does not carry out painting operation in the special painting room, and directly discharges VOCS.

Implementation of rectification: In view of the existing problems, the Environmental Protection Bureau of our district ordered it to stop production immediately and carry out rectification as required. At present, the coal-burning facilities and painting equipment in the workshop have been dismantled.

Twelve, Baoding pesticide plant

Assignment problem: At the time of on-site inspection, the company did not produce, and there was no organic waste gas collection and treatment facility in the packaging process of liquid pesticides, and VOCs were discharged directly.

Implementation of rectification: In view of the existing problems, the Environmental Protection Bureau of our district ordered the enterprise to stop production and rectify. At present, the collection and treatment facilities for volatile organic compounds have been installed.

Thirteen. Baoding Liyuan Copper Co., Ltd.

Assignment problem: The company was in production at the time of on-site inspection, and there were problems:

1. Environmental protection procedures are not provided on site;

2. Dust collected in the casting chamber is directly discharged to the outside;

3. The third smelting furnace has no facilities for collecting and treating smoke and dust, and the smoke and dust are directly discharged; 4. The shot blasting machine has no dust collection and treatment facilities, and the dust is discharged unorganized. "Field investigation: there is no environmental protection procedure, and dust is directly discharged.

Implementation of rectification: In view of the existing problems, the Environmental Protection Bureau of our district ordered the enterprise to stop production and rectify. At present, the technical transformation EIA has passed the project approval meeting, and production equipment and pollution control facilities are being installed in accordance with the requirements of the technical transformation EIA. At the same time, according to environmental laws and regulations, the company was fined 290,590 yuan, and the punishment was in place.

Fourteen China energy-saving Baoding environmental protection energy co., ltd

Assignment problem: After the law enforcement officers show their identity and show their law enforcement certificates, the security guards refuse to open the door and refuse to check. On-the-spot investigation: Company security guards are employed by security companies. Due to the security system, the person in charge of the unit was not informed in time, which led to the failure to open the door in time.

Implementation of rectification: In view of the existing problems, law enforcement officers in our district criticized and educated the person in charge of the factory, explained the Environmental Protection Law and other relevant laws and regulations, and asked them to actively cooperate with environmental inspection, and have filed an investigation.

Fifteen, Tan Zhanwei baking-free brick factory

Assignment problems: there is no EIA procedure, the ground is not hardened, the materials are stacked in the open air, not covered, and there are no dust suppression measures.

Implementation of rectification: In view of the existing problems, our district has completed the ban in accordance with the principle of "two breaks and three cleanups".

Sixteen. Baoding alpha precision casting co., ltd.

Assignment problem: its metal smelting furnace has no waste gas collection facilities.

Implementation of rectification: In view of the existing problems, the Environmental Protection Bureau of our district ordered the enterprise to stop production and transform immediately. At present, the factory has been demolished, and the enterprise plans to transform into logistics warehousing.

17. Sheng Da Gas Protection Equipment Factory

Assignment problem: On-site inspection shows that the factory is in production state, there is no environmental protection procedure, there is no voc collection and treatment facility in the painting workshop and the dust is unorganized.

Implementation of rectification: In view of the existing problems, the enterprise has been required to implement the previous shutdown measures, and its workshop and equipment have been dismantled during the law enforcement review.

Eighteen, unknown steel processing plant

Assignment problem: There was no production in the factory during the on-site inspection, and there was no special spray booth for spray painting. Open-air painting and direct emission of VOCs.

Implementation of rectification: After investigation, the factory belongs to qingyuan county Caiqiao Door Industry Factory, which is actually a cutting workshop of Caiqiao Door Industry, and there is no painting operation. Now the cutting equipment in this workshop has been dismantled and used as a warehouse.

Nineteen. Beiyangzhuang cement brick factory

Assignment problem: The factory was in production at the time of inspection, and there were problems beyond the following list of dispersed pollutants: 1. There is no environmental protection procedure. 2. The material pile in the site is uncovered and there is more dust on the road surface. "Field investigation: the cement brick factory has no environmental protection procedures and belongs to a' scattered pollution enterprise'; There is no shelter in the yard and there is more dust on the road.

Implementation of rectification: In view of the existing problems, our district has completed the ban in accordance with the principle of "two breaks and three cleanups".

Twenty, Qingyuan County Beiyingtou Yinsheng Weaving Factory

Assignment problem: At the time of on-site inspection, the company had no production and no environmental protection procedures. The oilcloth production line is equipped with waste gas collection facilities, but the volatile organic compounds generated are not treated.

Implementation of rectification: In view of the existing problems, our district has completed the ban in accordance with the principle of "two breaks and three cleanups".

2 1. Baoding yongyi building materials co., ltd.

Allocation problem: 1. On-site inspection does not produce. 2. Materials and waste residue are piled up in the open air, and the road area is dusty and uncovered, and the factory area is messy. 3. There is no EIA procedure. "Field investigation: the company is located in Rongguanying, Suncun Township, Qingyuan District. The company has a business license for industry and commerce, and there is no EIA procedure.

Implementation of rectification: In view of the existing problems, our district has taken measures to cut off power and stop production for the company on June 13. At present, relevant equipment has been dismantled and bulk materials have been covered.

Format of rectification report 2 After the Implementation Opinions of the District Committee and the District Government on Promoting the Construction of Efficient Hailing, all streets in the city earnestly implemented the spirit of the meeting. According to the unified deployment of the District Committee and the District Government, combined with the actual situation of our city, we formulated our street implementation work plan, and through a comprehensive investigation of the administrative efficiency and execution of the organs, we found out the outstanding problems in the efficiency construction in time, and strictly formulated the implementation plan to clarify the responsible person and the implementation time of rectification. The implementation of rectification is now reported as follows:

First, check the pendulum.

(A) Ideological and cognitive issues

First, the understanding of the significance and importance of efficiency construction is not in place, and some of them have nothing to do with themselves, and their actions are not conscious enough to attract enough attention; Second, some people don't know enough about efficiency construction, and think that efficiency construction is a matter for leaders and has little to do with staff, as long as they do their jobs well. Third, the promotion of efficiency construction is not strong. After some departments and units found the problems, they failed to formulate and implement the rectification plan in time, and the improvement of administrative efficiency was not obvious, which affected the work efficiency.

Work discipline problem

First, the examination system of organs is not strict enough to be regularized and institutionalized, and the phenomenon of tightening before loosening occurs from time to time. The phenomenon of being late for work and leaving early occurs from time to time, and the leave system is not well implemented; Second, low spirit, personal absence, no dedication, dealing with things at work, lax discipline, weak sense of responsibility, lack of pioneering and innovative spirit; Third, supervision and inspection are not in place, the monthly assessment of individual departments is not rigorous, there are no severe reward and punishment measures, and there is a lack of an effective restraint mechanism.

(3) Work style problem

The work is not thorough enough, and it is big; Working procedures and links are not standardized enough; The service attitude is not enthusiastic enough, and there are some phenomena such as blunt attitude, poor service and nonstandard civilized language.

(4) the problem of work efficiency

First, the sense of serving the overall situation is not strong, the interests of the departments are too heavy, and some relations have not been straightened out. Second, some things have not been handled to the satisfaction of the parties, and the work efficiency is not high.

Second, the main reasons

(A) insufficient attention to theoretical study. When the work is heavy and long, theoretical study is often regarded as a soft task and virtual work, ignoring active self-study; Sometimes there is a pragmatic idea, eager to learn first, and time is tight and time is loose, which leads to unsystematic, incomplete, not extensive and not profound learning content. Learning business is lazy. Some comrades believe that science and technology managers are not scholars and lack conscious action to take learning business as a responsibility and a way to improve their ability.

(2) The working standard is not high enough. Do the work when it comes, do it when it doesn't, and so on. , and failed to take the initiative to go deep into the grassroots and the masses, investigation and research, some departments can not strictly follow the provisions of the community division of labor and contact points, and regularly go deep into the community to carry out twinning and co-construction activities.

(C) the sense of innovation is not strong enough. Some comrades are used to looking at problems and doing things with old eyes and traditional ideas, and they are not strong in pioneering consciousness. When dealing with new problems, they stick to the old model and lack innovative spirit. Faced with the new situation and new tasks, some comrades have a fear of difficulties and anxiety when conditions are not available at the moment. In their work, they dare not rush for success, dare not try, dare not set higher goals and requirements, resulting in various potentials not being fully tapped.

Third, the rectification measures

In view of the above problems, our street has carefully studied and formulated rectification measures, defined the rectification time and responsible person, and ensured that all tasks were implemented.

(a) to strengthen learning, raise awareness, to ensure the quality of institutional efficiency construction.

Do a good job in learning, establish and implement various learning systems. Seriously organize and study the important spirit of the district committee and district government on carrying out efficiency construction, hold a mobilization meeting with the theme of "enhancing discipline and execution", closely combine the two, improve the understanding of the importance of grasping the efficiency construction of organs, and ensure that the efficiency construction activities of organs are carried out in a solid, effective and in-depth manner.

(two) strict discipline, strengthen supervision, to ensure that the work discipline is in place.

First, establish and improve internal working systems and procedures such as post responsibility system, service commitment system and dereliction of duty investigation system. Adhere to the strict leave cancellation system, you can ask for leave if you have something, and you can't be absent from work without reason. You can't be empty during work. If you have something to ask for leave and leave without authorization, which will cause adverse effects, you should be held accountable in accordance with relevant work discipline. Timely start admonishing conversation and accountability mechanism, and deal with violations of efficiency construction that affect the image of the organization in accordance with relevant regulations, and will never tolerate them.

The second is to improve the assessment, reward and punishment mechanism. Improve the "initial evaluation and final evaluation" assessment mechanism, supervise and assess the monthly work completion of major offices, which will be graded by the leaders in charge, assessed by the street discipline inspection commission, and approved by the main leaders, and the assessment results will be linked to the year-end assessment.

(three) change the work style, to ensure the level of administration according to law.

First, continue to implement the first question responsibility system. Ask the first person in charge to solve the problems within his own responsibilities and coordinate immediately; If you can't solve it yourself, you should guide it to the corresponding functional department or department in time; Those who fail to perform their duties, are indifferent or deliberately make things difficult will be dealt with severely once found.

The second is to strengthen service functions. Deepen the effectiveness of "three services" and set up a special project construction service team to serve the construction of key projects in the streets. Bainaohui, a foreign-funded project, is fully responsible for the street investment promotion office and the service industry office, and arranges special personnel to handle the relevant procedures for the landing of enterprises. Regarding the procedures for the transfer of enterprise property rights, the street actively intervened and actively coordinated, striving to put them in place as soon as possible. The Boer Cultural Project is under the responsibility of the Sub-district Service Office and Song Lin Economic and Industrial Company, and all the procedures required for the project are handled by the sub-district, which simplifies the difficulties of enterprises. The Street Construction Office is solely responsible for the street publicity and cultural center project, and a headquarters has also been set up at the construction site to draw the elite strength of the street and take charge of the construction safety at the site. The whole bidding work is supervised by the street commission for discipline inspection, and the district bidding center is entrusted to conduct public bidding to ensure fairness and transparency, and strive to build this civil engineering into a provincial excellent project and a clean government project.

The third is to set up a leading group for the supervision of the efficiency construction of organs to supervise the efficiency construction of organs in a timely and effective manner. Regularly report the effectiveness monitoring, and urge relevant departments to rectify in time when problems are found. We will further promote the accountability mechanism, promptly handle the rectification that is not in place, and strive to promote the great development of the economy and society with the great improvement of efficiency construction.