Job Recruitment Website - Zhaopincom - For the 300MW steam turbine in our plant, the No.2, No.4 and No.6 control valves often have large jitter at low load, but not at high load.
For the 300MW steam turbine in our plant, the No.2, No.4 and No.6 control valves often have large jitter at low load, but not at high load.
If the tone jitter also occurs when it is static, it may be that the tone servo card is not well adjusted, such as the integration effect is too strong. If the tone does not shake at rest, it may be that the flow characteristics of DEH tone are not set well (especially when the tone is small) and reset. If you don't understand anything else, ask a master in the industry. Or go to Polaris Power Forum and ask, there are many experts there, and there is also Polaris Power Recruitment Network, which is good and professional enough to find a job in the power industry.
- Related articles
- Which is better, Jinya die-cutting machine or Xu Heng die-cutting machine?
- What's the telephone number of Wenzhou Labor Bureau?
- List of physical examinations for community recruitment of Meixian institutions in Baoji City, Shaanxi Province in the second half of 2022
- How about Zhejiang Erjian Design and Research Institute?
- Kunming registered company: how to register an advertising company? What is the specific process?
- Xinfeng thermoelectric recruitment
- The largest stall market in Jiangmen
- Should charity be high-profile or low-key?
- Reimbursement ratio of rural cooperative hospitals in Suixi county
- Come on, intern. Synopsis (1~36)