Job Recruitment Website - Zhaopincom - How many days does it take to scrape putty?

How many days does it take to scrape putty?

In general, the time limit for putty scraping is about 1~2 days. Because the putty wall needs to be scraped 2~3 times, after the putty is scraped 1 time, the second layer must be scraped after the putty is dry. If it is rainy, the construction period will be longer, and it may take about 3~5 days to complete. Therefore, it is suggested that when scraping putty, it is best to choose dry weather, which can reduce the construction period of scraping putty. If the construction area is relatively large, then at least two or three putty scraping workers are needed.

How many days can I scrape putty?

Mainly depends on the season and the weather. Generally, in spring and autumn, when the weather is dry, it can be done in 1-2 days, and it takes at least 3 days in summer. Because the temperature is very high in summer, the surface water evaporates quickly, but the humidity is high, so it is just dry most of the time, while it is cold in winter, and it takes 4 or 5 days to do it. Note that it will take longer if there is a rainy season.

What should I pay attention to when scraping putty in batches?

1, the batch of putty scraping is generally recommended to be carried out in 2-3 times, and the putty must be completely dried before the next construction. Note that the first time the putty dries is relatively short, and the second time is relatively long, so be sure to pay attention.

2. Before the batch of putty scraping construction, if there is water vapor on the wall, dry it with a dry rag first, and try to keep the wall dry, so as not to affect the quality of putty. If the wall is accidentally wetted during the construction process, the putty will be pulverized before it is completely dried.

3. After this batch of putty is scraped, it should be naturally dried in the shade. However, in order to shorten the time, some owners open doors and windows. This is actually not feasible, because it will make the water in the putty lose quickly and cause deformation and cracking, so the putty construction must not be in a hurry.

4, batch of blow be bored with child has very high requirements for grass-roots treatment, if there are uneven places, it must be filled in advance, otherwise it will affect the final effect. In addition, if the wall is plastered, it is necessary to hang wall cloth first, and then blow putty in batches to avoid arching and cracking.