Job Recruitment Website - Zhaopincom - Advanced deeds of the unit
Advanced deeds of the unit
Advanced deeds of the unit 1
The fire protection work of the xx County Radio and Television Bureau has always adhered to the principle of “prevention first, combining prevention with firefighting, everyone participating, and treating both the symptoms and root causes”. Under the guidance of relevant departments, we give full play to our subjective initiative, carefully study the characteristics of this fire protection work, actively take effective measures, and strive to do a good job in fire safety work. Over the past few years, our fire safety work has made steady progress and achieved gratifying results. The main tasks in our work The following approaches were taken.
1. Leadership attaches great importance to ideological thinking, and the safety organization is sound
Our bureau has always had a good tradition of leaders attaching importance to safety work. The rules and regulations, boss meetings, and work schedules for safety work have been It has formed an unwritten rule in our bureau.
The unit has established a safety work leading group headed by the leader in charge of safety work, to implement the "Fire Protection Law", establish a fire protection work system, organize and launch fire protection knowledge publicity and education, and carry out fire safety self-examination and self-examination rectify and hold regular safety work meetings to study and discuss the unit's fire protection situation and fire protection measures.
With the care and support of the leaders, a long-term mechanism for the healthy development and harmonious operation of fire protection work has been established.
2. Prepare for a rainy day and improve hardware facilities
Prevention is always at the forefront of all fire protection measures. Only by taking precautions and doing a good job of prevention can we prevent the occurrence of fire accidents and be effective. Protect public property and people’s lives.
Compared with other units, our bureau has a distinctive feature, that is, its subordinate units are scattered in locations and have many circuit facilities and equipment. In response to the above characteristics, the safety working group, under the leadership of team leader Li Huiquan, has improved various management systems, strengthened fire safety education for staff, and done a good job in building a soft environment. At the same time, the fire protection hardware facilities of subordinate units will be improved. We conduct a comprehensive survey of transmission lines, electrical equipment, and fire-fighting facilities (equipment) every six months. We update what needs to be updated, scrap what needs to be scrapped, and add what needs to be added. We form a system and stick to it, so as to effectively control fire hazards. Nip the signs in the bud and eliminate fire safety hazards.
3. Strengthen publicity and education and improve firefighting skills
Every year, we use various forms and means such as blackboard newspapers, galleries, lectures, visits, etc. to educate cadres and workers on fire safety and strengthen fire safety education. Increase their fire safety awareness, increase their fire safety knowledge, and cultivate their habits of implementing fire protection work; at the same time, formulate fire protection emergency plans, strengthen fire drills, and ensure that everyone knows the correct use of fire extinguishing equipment. Basic knowledge on fire fighting and escape methods in fires, etc., to improve the self-rescue and mutual rescue skills of cadres and workers in emergencies.
4. Frequent inspection and supervision to promote work implementation
Our bureau conducts daily inspections and random inspections based on seasonal characteristics and work tasks on the implementation of fire protection work in various departments of the unit. According to the method, each inspection can have a plan before the inspection, a summary during the inspection, and a report after the inspection.
When supervising the implementation of fire protection work by various departments, the safety work leading group adopts the working method of "setting responsibilities, looking back, focusing on one point, and taking the lead from point to point". Defining responsibilities means that the unit signs a safety work responsibility letter with each employee, clearly stipulating the responsibilities of each department's cadres and employees in safety work; looking back means that if problems are found during the inspection, they are ordered to correct them on the spot, and then go back and check the improvements afterwards. ; To focus on one point is to grasp the implementation of the system, to grasp the key points without relaxing, to pay attention to the effectiveness of the work, and not to commit the problem of treating the head when it is a headache, and to treat the foot when it is painful; to focus on the points and areas is to strictly screen and inspect each office and cadre and employee one by one , starting from doing a good job in fire safety work at each small point, to drive the overall situation of fire safety in the entire bureau.
Through the unremitting efforts of all employees of our bureau, our bureau has made its own contribution in implementing the "Fire Protection Law" and creating a safe unit.
5. Strict duty discipline and ensure that responsibilities are assigned to everyone
This year’s fire prevention work will be guided by the county’s fire protection work and arrangements, conscientiously perform fire prevention work responsibilities, and establish and improve fire prevention and emergency response treatment mechanism, improve the ability to put out fires, and comprehensively implement fire protection measures. During holidays and fire prevention periods, a 24-hour duty system is implemented. All communication tools for on-duty personnel are open 24 hours a day. The duty telephone numbers of each department and the person in charge are all open 24 hours a day to ensure that if a fire occurs, they can be contacted in time and personnel can be organized to put out the fire. Materials on the advanced deeds of the unit 2
After the efforts of the previous stage, the first national economic census in xx District is progressing smoothly. Now that there are only two days left until the standard time of the census, the economic census in the region has entered a critical stage. Faced with the largest and most difficult district situation survey since the founding of the People's Republic of China, all the staff of the District Economic Census Office and statistics professionals carefully deployed, carefully arranged, and responded calmly. It can be said that they have done a good job at every stage of the census. Fight hard.
1. The detailed and solid thorough investigation shows its characteristics
The thorough investigation is the basis for doing a good job in the economic census. By finding out, registering and verifying the basic situation of the census objects one by one, it ensures that the census objects are not Only by not missing out can we truly and comprehensively grasp the basic situation of all legal entities and industrial activity units in the secondary and tertiary industries, as well as the number of individual industrial and commercial households.
(1) Attach great importance and prepare carefully
Faced with the importance and arduousness of this census, the xx District Committee and District Government attached great importance to it. Since June this year, the economic census has been included in the main monthly government work arrangements, emphasizing that "awareness, organization, and responsibility are in place." The government has worked together to make all preliminary preparations for the census and pay real attention to the census. Organization establishment, staffing, funding implementation, etc. Relevant departments also actively cooperated in preparing for the census, such as the recruitment of census personnel, unit directory, and code cleanup. In early June, our district established an economic census network covering the entire district.
(2) Seriously pilot the project and sum up experience
The district economic general office carefully selected the highly representative Hecheng Community of Baihe Street as the district-level pilot unit. This community has both a building economy and a professional market, and a large proportion of individuals and industrial activity units, which is more in line with the pilot requirements of the xx District. After the pilot, the enumerators in the district have better mastered the skills of filling out the census form, and summarized several effective experiences: first, "carry out in blocks", which is divided into three blocks: roads, markets and buildings; second, " The word "ritual" is at the forefront, and the intensity of publicity and explanation is increased; the third is to "prescribe the right medicine to the case", using different methods for different survey objects.
(3) Orderly inventory and cross-verification
Starting from March 8, the inventory work in our district has been fully launched. The enumerators combined their experience in the pilot work and the actual situation of the enumeration area to conduct door-to-door registration using a blanket inventory method. The District Economic Census Office has implemented the responsibility system for census instructors and enumerators at all levels. Members of the Subdistrict Economic Census Office go to the front line of the census every day to provide on-site business guidance on the census work and supervise the progress of the work. They also regularly gather census instructors and enumerators to communicate and discuss the census. experiences and problems. Streets also frequently check intersecting lots to avoid duplication or missed inspections and ensure smooth progress of the inspection.
(4) Quality control, with remarkable results
In order to implement the economic census and inventory implementation plan and ensure the quality of the inventory, xx District conducted a quality spot check on the inventory work of the entire district on the solstice. This spot check was divided into three groups. According to the route of the worksheet in the census area, a blanket check was made to see if any units were missing, and units and self-employed households were randomly selected to check if there were any errors. The random inspection results showed that the unit omission rate and error rate were both controlled within limits. After the random inspection, each street census agency took measures to make up for its own shortcomings. For example, Dongsheng Street held a meeting of heads of community census agencies to carry out a new round of work to check for omissions and fill in vacancies, and nearly 100 forms had been filled in as of May; Baihe Street organized business training for street and community census personnel in advance, striving to improve the quality of census forms.
2. Business training lays the foundation in an orderly manner
Improving the professional level of census personnel and the professional ability of unit fillers is the basis for doing a good job in the economic census and is also the key to ensuring data quality. Our district adopts a top-down and step-by-step training method and carefully prepares materials to ensure the number of participants and the effectiveness of the training.
(1) Combined with the annual report, all levels are in place
After the inventory work was completed, in order to ensure the data quality of the economic census, the District Economic Census Office began to organize business training intensively. The first batch of business training venues will be held from March to March, with the number of people. The training targets mainly include industries above designated size, wholesale and retail, real estate, construction enterprises, business backbones in various streets and community census takers. At the same time, units that need to submit annual reports will be assigned xx annual reports and xx regular reports. For the second batch, from late September to January, each sub-district will conduct training for enterprises below the scale or below the quota.
(2) Pay attention to reality and submit in batches
According to the reporting time limit of the economic census form in our district, and combined with the actual workload of each street, the census form in our district is submitted in batches form. That is, the reporting time is determined based on the workload of each street. The reporting time of each street is three days apart to ensure input review and return verification.
3. The publicity work is vivid and effective
Increasing publicity is the basis for clarifying the meaning of the census, raising awareness, and actively cooperating. For this reason, since the preparation stage of the census, xx District has always included publicity and mobilization as the main content on the census agenda.
(1) Public opinion comes first and runs throughout
At the beginning of every census work, publicity campaigns must first clear the channels. The District Economic Census Office carried out two census publicity activities at Zhongshan Plaza and Cotai Central to introduce the concept, significance, timing, etc. of the economic census, and convey the term economic census to the society. Later, in the stages of economic census pilot, inventory mapping, census form training and other stages, the role of publicity and mobilization was never forgotten.
(2) Various forms, extensive and in-depth
In addition to continuing to focus on several major publicity positions - large fixed outdoor billboards, fixed slogans, banners, community posters, and blackboard newspapers, various The street also set up an economic census publicity and consultation office, and carried out community cultural and sports team performances; the district economic census and the district youth league committee organized students to take to the streets to publicize, distribute economic census promotional materials, and use loudspeakers to broadcast promotional materials; during every business training , combined with the publicity and distribution of the "Letter to Survey Households" ordered by the State Council; timely updates on economic census work dynamics on the websites inside and outside the District Bureau of Statistics; continue to organize economic census briefings; report on advanced figures and deeds emerging from the census wait. Various forms of publicity activities enable the society to learn about the economic census work in our district from many aspects.
(3) Creating an atmosphere with remarkable results
The publicity work in the previous stage created a social atmosphere for carrying out economic census in the whole district; further enhanced the awareness of cooperation and the level of support , business households started to accept the survey enthusiastically from their original concerns, proactively provided information, and filled out the reports truthfully. At the same time, the census was accelerated and the quality was ensured, which provided a strong guarantee for the completion of all stages of work with high standards and high quality.
As the standard time point of this economic census approaches, the clarion call for a new round of battle has sounded. We actively participated and worked hard in the previous stage of work, and mastered some good methods and methods, but there are also some shortcomings. There are more things for us to explore and discover in the next stage. In the new year, we will go all out to meet the challenges and ensure that we complete the economic census task with high standards and high quality. Materials on the unit’s advanced deeds 3
“Smart, capable, and good at settling accounts.” This is the most common comment from people who are familiar with xx. Since he has been engaged in on-site technical management and production management for many years, he is very familiar with engineering design, technical organization, production management, change claims, etc., and has gradually found out the successful experience of controlling the "five barriers" and improving project efficiency. The Wuhan company has become a popular story.
This year, 32-year-old xx, the project manager of the fourth contract section of Daguangbei Expressway of Wuhan Company, was honored to be named the Outstanding Young Project Manager of China Railway Engineering Group.
Establish ideas and control cost accounting
Every time he receives a project construction task, the first thing xx needs to do is to have an in-depth understanding of the design documents, contract terms and the geological environment of the project construction, etc. , clarify where changes can be implemented and where efficiency can be increased, and cost accounting will be carried out accordingly to determine the overall idea of ??creating profits and profits, and ensure project construction benefits. In XX, in order to gain a foothold in the Wuhan market, the company won the bid at a low price to undertake the Viaduct Project of Section B of the South Ring Section of Wuhan's Third Ring Road. However, the company's final calculation result was: a loss of approximately 5.8 million yuan, with a total loss rate of approximately 10! Faced with this, Many project managers are unwilling to take on this "hot potato" task. When the company handed over the task to him, xx did not retreat, but immediately organized professional and technical personnel to start a large number of on-site investigations, contract clause analysis and cost analysis in the early stage of the project. After repeated cost calculations using different methods, combined with many years of practical management experience, we have established a management idea that takes ensuring project safety, quality and progress as the basic requirement, and focuses on careful calculation, tapping potential and creating profits, changing claims, and achieving turnaround and balance. . It laid a solid foundation for the safe and high-quality completion of the project ahead of schedule and the goal of turning losses into wins in one fell swoop.
Select a team and ensure collaboration management
Collaboration team contracting costs are an important part of the total project cost. In order to select the collaborative team, xx regards their construction capabilities, financial strength and qualification level as necessary conditions for internal public bidding, adopts the method of low price priority, does not exceed the pre-calculated project cost, and implements closed management methods for bidding, and adheres to Achieve "register first and then use", "sign the contract first and then enter the tide", and strictly control the entrance of the collaborative team. In order to do a good job in the management of the collaborative team, he included the collaborative team into the integrated management of the project department, from safety, quality, progress, From cost control to material management, technical management, and on-site organization management, he spared no effort to provide guidance and help, do a good job in supervision and service, and eliminated Party B's mistaken idea of ??"what does it have to do with me" when subcontracting expenses to the collaborative team. In terms of settlement, he insists on making quality inspections, recipients, and settlement payments on a monthly basis based on the contract, eliminating the phenomenon of payment without first settling. The boss of the collaborator often said: "Manager Wang is very important in on-site management and technical support. It's very good, but there is no way to get him to relax on the price. ”
Pay close attention to management and control technology to create benefits
xx attaches great importance to and pays attention to technical management and cost control. In the initial stage of construction, he organized a dedicated class to study and formulate the responsible cost. Implementation construction organization design; during the project implementation stage, he emphasized the authority and programmatic nature of the construction organization design and that it should not be changed at will. If the actual situation on site changes, it can only be optimized once on the basis of the original plan, xx found. The viaduct constructed by the project department passed through very deep plastic silt. The original plan for manually stacking straw bag cofferdams was difficult to implement, and it was expensive and uncontrollable. In order to solve this problem, he organized engineering and technical personnel to repeatedly optimize. The construction plan uses a small excavator to lower the steel plate into the pond, insert and drive wooden piles to form a bamboo cofferdam, and use on-site silt filling construction plan to not only ensure the construction progress and quality, but also control the project cost on the pier column cap beam. During the construction, the collaboration team originally planned to use cast-in-place cap beams with brackets, and the bracket cost was 50.3 yuan per cubic meter of concrete. xx believed that this method was too costly, so he organized technical backbones to boldly innovate and use steel brackets for the first time. The hoop-processed steel composite bracket was successfully tested by using a jack on the test pier, and the bracket cost was suddenly reduced to 23 yuan/cubic meter. This alone saved a cost of 116,000 yuan. In addition, the bored pile steel cage was optimized. The protective layer design plan saves 17.42 tons of steel.
Plug loopholes and control materials
The material cost of a bridge project generally accounts for 60 to 70% of the total project cost. Once the materials are used, If a loss occurs, the project will generally suffer a loss.
For the materials used in the project, xx must conduct preliminary investigations and comparisons, conduct reviews of qualified sub-suppliers, and finally select high-quality and low-cost suppliers, and carry out key control on the two key links of procurement and use. Regardless of steel bars, cement main materials or sand and gravel floor materials, a special scale room must be set up at the construction site for measurement. The measurement of sand and gravel materials is accurate enough to be calculated based on the inspection specific gravity and moisture content. Payment will be made only after the materials pass the inspection. The procurement of materials must first be planned by the technical department based on drawings and matching ratios. Then the material department will provide a material procurement application plan based on the reviewed material plan and on-site material usage and submit it to the project manager for approval before purchasing. After the materials are purchased, they are collected into the warehouse according to the material management system, and the issuance and loss of materials are strictly controlled to ensure responsible storage and limited use of materials, and the materials are cleared after the work is completed to prevent waste and loss. At the same time, we insist on comparing the consumption with the plan and the quantity returned from the inspection and pricing every month, achieving dynamic monitoring of the entire process and maximizing the material utilization rate.
Study the contract and control changes and claims
The Viaduct Project of Section B of the South Ring Section of Wuhan Third Ring Road is a World Bank loan project, and the contract terms are very strict and demanding. In order to ensure that the project turns losses into profits, xx conducted focused research on changes and compensation contract terms on the basis of strengthening the management of various projects. When researching the terms, he found that for projects that undergo substantial changes, the unit price can be declared in full based on the municipal fixed direct fee plus tax. After calculating the municipal fixed direct fee, it was found that it was more than 10% higher than the contract bill of quantities. As long as the geology does not match the design, you can also apply for compensation. To this end, he paid close attention to the quality and progress of the project, ensuring that the work of the project department was always at the forefront of the adjacent bidding sections, leaving a very good impression on the owner, the World Bank Office and the supervisor; he organized a special team to focus on Geological conditions, and often traveled to and from the design unit to fully exchange opinions and communicate repeatedly with the designers, which laid a solid foundation for the project department to carry out change claims. Through hard work, the project department won the large-scale structural change project of pile foundations and beams, and obtained A large amount of change claim funds were obtained, which eventually turned a project with a loss of more than 5 million yuan into a profit, which became a good story in the project management of Wuhan Company.
- Related articles
- What about Xinjiang Uygur Autonomous Region Pharmaceutical Co., Ltd.?
- What is the telephone number of Yuxi Yudian Electric Power Design Institute Co., Ltd. in Yunnan?
- How about Jining Depot of China Railway Hohhot Bureau Group Co., Ltd.?
- How to prepare for Zhejiang Rural Credit Cooperative 20 18?
- Business hours of Yellow River Fashion City
- Consumption of Shajing Baoshi Bar
- What's the telephone number of Cixi Cahill Sealing Material Co., Ltd.?
- Measures of Shenzhen Municipal Bureau of Culture, Radio, Film, Tourism and Sports for Qualification Examination of Institutions in 2023
- How much can a tricycle earn in a day?
- Brief introduction of Weihai Radio and Television Channel