Job Recruitment Website - Zhaopincom - Installation instructions of chuck of Shanghai No.3 cylindrical grinder

Installation instructions of chuck of Shanghai No.3 cylindrical grinder

The installation of the chuck of Shanghai Sanjie cylindrical grinder needs to be carried out according to the following steps.

1. Prepare tools and materials, chuck, splint, chuck bolt, Phillips screwdriver, wrench and other tools.

2. Clean the working face and thoroughly clean the working face of the machine tool to ensure the installation accuracy of the chuck.

3. Install the splint on the chuck, put the splint on the chuck and fix it with bolts.

4. Install the chuck bolt, insert the chuck bolt into the chuck hole and tighten it with a wrench. Be careful not to tighten it too tightly, so as not to affect the service life of the chuck.

5. Install the chuck, put the chuck on the working surface of the machine tool, and tighten the chuck bolt with a Phillips screwdriver.

6. Check the installation of chuck. After installation, check the chuck to ensure that its parallelism and verticality with the machine surface meet the requirements.

7. Adjust the chuck. If the chuck is not parallel or vertical, adjust it to ensure that the chuck is exactly the same as the working surface.