The sequence and process of rough house decoration

The decoration sequence of rough houses is water and electricity installation first, and then civil decoration. The process is: design scheme, construction preparation, hydropower transformation, mason stage, painting stage and completion acceptance.

1, design scheme

The first step of rough house decoration is design scheme. At this stage, the owner needs to communicate with the decoration company or designer to clarify his own needs and preferences, as well as budget constraints. The design scheme includes plane layout, circuit planning, wall decoration, floor materials and furniture style design.

2, construction preparation

After the design scheme is determined, construction preparation is needed. This stage includes material procurement, construction personnel recruitment, construction tools preparation, etc. At the same time, we need to consider the safety issues during decoration, such as protective measures at the construction site and circuit safety.

3. Hydropower transformation

Hydropower transformation is an important link in the decoration of rough houses. At this stage, it is necessary to inspect and transform the water and electricity pipes of the house to meet the new decoration needs. Hydropower transformation includes the transformation of water pipes, wires, sockets and switches.

4. Masonry stage

Masonry stage refers to the treatment of walls, ceilings and other parts. At this stage, wall plastering, bricklaying and suspended ceiling are needed. At the same time, we need to consider the decoration of the wall, such as latex paint and wallpaper.

5. Woodworking stage

Woodworking stage refers to the production and installation of furniture, doors and windows and other wood products. At this stage, it is necessary to design and manufacture furniture, and at the same time install and adjust doors and windows.

6. Painting stage

Paint stage refers to the treatment of paint, paint, etc. At this stage, it is necessary to paint and paint the walls and ceilings. At the same time, we need to consider the color and quality of paint.

Seven. final acceptance of construction

Completion acceptance refers to the acceptance after the completion of the decoration project. At this stage, it is necessary to conduct a comprehensive inspection and acceptance of the decoration project to ensure that the decoration quality meets the requirements. At the same time, it needs cleaning and disinfection to ensure the health and safety of the house. When problems are found, they need to be rectified in time.