Job Recruitment Website - Ranking of immigration countries - Social Status of Gaobei Water Control Project in Hanjiang River
Social Status of Gaobei Water Control Project in Hanjiang River
Gaobei Water Control Project is one of the 27 major water conservancy projects that the State Council plans to start construction in 215, and it is also one of the first batch of pilot projects determined by the National Development and Reform Commission, Ministry of Finance, Ministry of Water Resources and the provincial government to introduce social capital to participate in the construction and operation of major water conservancy projects.
with a total investment of 6.154 billion yuan, the Gaobei Water Control Project of Hanjiang River in Tai Po was officially started. Chen Lei, Minister of Water Resources, Zhu Xiaodan, Deputy Secretary of Guangdong Provincial Party Committee and Governor, and Deng Haiguang, Vice Governor of Guangdong Province attended the groundbreaking ceremony.
this project is the largest single investment water conservancy project in our province since the founding of new China, and it is also one of 27 projects to be started in 215 among the 172 major water conservancy projects for water saving and water supply deployed by the the State Council executive meeting, and it is listed as the key construction project in Several Opinions of the State Council on Supporting the Revitalization and Development of the Former Central Soviet Area, such as Gannan.
Hanjiang Gaobei Water Control Project is a comprehensive water control project focusing on flood control and water supply, taking into account power generation and shipping, etc. It is a controlled project in Hanjiang River Basin, which combines flood regulation with Yongding (Mianhuatan) Reservoir and forms a "dike-reservoir combination" flood control system with downstream dikes.
the maximum dam height of this project is 5m, the normal water level and flood limit water level of the reservoir are 38m, and the design flood level, check flood level and flood control high water level are 47.44m.. Among them, the main buildings such as the sluice, the upstream water retaining part of the power plant, the upper lock head of the ship lock, the fishway and the gravity dam connecting the two banks are Grade 2, and the design flood standard is once in 1 years, and the check flood standard is once in 1 years. After the completion, the flood control standard of important dikes such as the south and north dikes of Hanjiang River and Shantou Dawei will be raised from once every 5 years to once every 1 years. The flood control standard of main dikes such as Shangpengwei, Yibawei and Suxiwei will be raised from once every 3 years to once every 5 years. The scope of flood control protection covers Chaozhou, Shantou and Jieyang in the lower reaches of Hanjiang River and the delta region, with a population of 6,242,9 and cultivated land of 1,96,2 mu.
- Previous article:Shaoguan Hakka Dialect and Shaoguan Dialect
- Next article:How long does it take to apply for a Japan study visa?
- Related articles
- Immigration officials entered the border.
- Super junior member information
- Movies of space immigrants giving birth to children
- How to do a good job of insurance allocation when immigrating to the United States?
- Is Ancient Water Margin (120) the original work of Shi Naian?
- What does Shaopi mean in Sichuan dialect?
- Who can help me find some stories about Zhuge Liang? (More specifically, at least 3)
- What are the ways of Irish immigration?
- Immigrant reading comprehension
Question 1:D
Question 2: D.
Question 3: A.
Question 1:
Test analysis: This question can first find a passage related to "Mars migration pl
- Aba immigrated to Xinjiang