Rural water conservancy application report

Model essay on rural water conservancy application report (generally 5 articles)

In the era of continuous progress, the report plays an important role, and all the information mentioned in the report should be accurate. Actually, writing a report is not as difficult as you think. The following is a sample report on rural water conservancy application compiled by me. Welcome to read the collection.

Rural water conservancy application report 1 leaders at all levels:

We are in Xujiawan and Tongjia Village, xinfeng village, Xinqiao River Town, with 80 households and 350 people.

Rural roads and water conservancy are the lifeblood of agricultural production and rural economic and social development, and are indispensable conditions for farmers to survive. Strengthening rural highway water conservancy construction is an important guarantee for improving comprehensive agricultural production capacity, ensuring convenient transportation, increasing grain production and people's living and working in peace and contentment, and it is also an important work for prospering agriculture, developing rural economy and promoting the construction of new socialist countryside.

In the early days of People's Republic of China (PRC), the government built a highway from Xinqiao River to Hanshou in 1950s. The road section that our group passed has now existed in name only: the roadbed has narrowed, the roadside has collapsed, and the road surface has different sizes. As long as it rains, especially in the rainy season, the road is wet and muddy, and the road is slippery and difficult to walk, not to mention the danger of traffic.

The cultivated land area of the two groups is more than 400 mu, mainly relying on several ponds and dams for water supply. However, after years of disrepair, silt accumulated in the dam, storing too much water, and the dike was about to collapse. Especially when the dam is heightened, the rising water overflows fertile fields and floods crops, and there is no water supply during drought, so the storage of water in the pond dam is obviously not enough for drought resistance.

If roads and water conservancy construction are not good, it will seriously affect rural economic development. In order to eliminate hidden dangers, ensure the safety of farmers' lives and property, and ensure a bumper harvest in agriculture, we request superior leaders to conduct field visits, attach importance to the construction of new countryside, and create a beautiful home together.

Sincerely present

2 county finance bureau rural water conservancy application report:

Changjiang Village is located in the northwest of Sishun Township, with 16 villagers' groups, a population of 22 16 and cultivated land 1779 mu. Agricultural income is the main income of the people in the Yangtze River Basin. Since the country implemented the policy of benefiting farmers, great changes have taken place in rural areas, and farmers' income has been significantly improved. Increasing grain output and maintaining farmland water conservancy are the most important tasks in rural areas at present. Now, we ask you to provide financial support for the implementation and maintenance of the Gaozhen Canal in our village. The total length of the canal is about 1.260m, and the irrigated farmland area is more than 330mu, involving three villagers' groups,1.26 farmers. The water in the canal is also the drinking water for 49 farmers.

Because the canal is a sandy canal, it leaks seriously and often collapses. Farmers often quarrel over water, which affects the bumper harvest of agricultural production for a long time, especially bringing drinking water difficulties to 49 farmers and unfavorable factors to social harmony. Therefore, the village committee of our village decided to benefit from the farmers' labor and strive for your financial support. After the rice harvest this year, migrant workers will be organized to repair and transform the project.

According to the field investigation, the total investment needs 6.5438+500,000 yuan. Due to the financial weakness of our village, we hereby apply to your company for support and solutions. After the completion of the project, the irrigation problem of this farmland will be completely solved, and the drinking water problem of 49 households will also be solved, which will promote the harmonious atmosphere of farmers.

If the above is correct, please reply.

XX village Committee

20XX August 9th

Rural Water Conservancy Application Report 3 I. Overview

(1) Basic information

Briefly describe the natural and socio-economic conditions of the county (mainly including: natural conditions, socio-economic conditions, natural disasters, agricultural production status, etc.). ).

(B) the status of small-scale irrigation and water conservancy

Types, distribution and completeness of small-scale irrigation and water conservancy projects in the county (mainly referring to irrigation and drainage facilities with irrigation area less than 1 10,000 mu or farmland drainage area less than 30,000 mu, and final canal system of large and medium-sized irrigation areas); Transformation and operation of key projects in large and medium-sized irrigation areas; Operation status of reservoir as irrigation water source project; The current management system and operation mechanism of small-scale irrigation and water conservancy projects; The investment and effect of implementing small-scale irrigation and water conservancy projects in recent years; Technical capabilities such as design and construction of small-scale farmland water conservancy projects.

(3) Water resources status

The total amount of water and soil resources in the county, the available amount of water and soil resources, the degree of development and utilization, focusing on the analysis of development and utilization potential (objectively analyzing the cultivated land area, irrigation area, water resources utilization status, available amount and other conditions).

Second, the implementation plan of key counties

(1) objectives and tasks

According to the main tasks and objectives of key county construction proposed by Cainong [2009] No.92 document, combined with the actual situation of this county, this paper puts forward the main goals and tasks that this county plans to achieve through key county construction (illustrated by data).

(2) Project construction and management

According to the county-level irrigation and water conservancy planning or other related planning, the situation of water and soil resources, and the construction requirements of key counties, the construction scope and layout, main construction contents, project quantity and scale, construction standards, project construction management mechanism and operation management mechanism are determined. It's all been brought up.

(3) Financing and integration plan

Calculate the cost and total cost of each major construction content; Put forward the fund raising plan and the fund integration plan.

(4) Expected benefits

Analyze and predict the economic, social, ecological and environmental benefits that can be achieved after the completion of the construction of key counties. (Economic benefits are quantitatively described by indicators such as increasing, restoring and improving irrigation area, improving irrigation guarantee rate, increasing grain production capacity, and increasing agriculture, especially planting benefits).

III. Annual Implementation Plan

According to the implementation plan of key counties, make a specific annual plan for 2009-20 1 1, and the implementation plan for 2009 should be as detailed as possible.

(1) objectives and tasks

(2) Project construction and management

(3) Financing and integration plan

(4) Expected benefits

Fourth, safeguard measures.

From the aspects of organization and leadership, coordination and linkage of departments, fund raising and integration, guiding farmers to raise funds and labor, project construction management and fund management, this paper expounds some important measures for ensuring the smooth implementation of key county construction and giving full play to the expected benefits.

Verb (short for verb) preemption

The fourth part of the rural water conservancy application report is the application for the matching funds (materials) of drip irrigation project construction in xinmi city Water Affairs Bureau;

With the development of society and the adjustment of economic and industrial structure, the problems concerning agriculture, countryside and farmers are facing renewal and change. As farmers go to cities to work, do business and switch to the tertiary industry, leasing land in pieces is a new model and new impetus to ensure the sustainable development of agricultural production. The 18th National Congress of the Communist Party of China clearly pointed out the policies on agriculture, such as speeding up the development of modern agriculture, focusing on increasing farmers' income, and speeding up the improvement of the system and mechanism for the integration of urban and rural development. Point out the direction for rural economic development. Our Sino-Singapore Agricultural Development Co., Ltd. and Zhengzhou Institute of Agriculture and Forestry Science have joined hands to innovate for the purpose of high-yield and efficient ecological agriculture and agricultural technology research. In order to promote the development of surrounding agriculture and explore new ways of agricultural innovation.

I. Overview of the Project

The land leased and transferred by Zongxin Agricultural Development Co., Ltd. is located in Gangpo Village, Yuecun Town, xinmi city, with a total area of1.200mu.. The transferred land is used for agricultural development and agricultural technology research. At present, wheat, miscellaneous grains, vegetables and fruits have been planted, but due to the lack of agricultural water resources, there are problems such as poor growth and limited yield. In order to ensure the smooth, high-yield and efficient operation of the leased land and play a leading role in demonstrating the new mode of science and technology agriculture for farmers around the company's location, it is planned to apply for the implementation of water conservancy drip irrigation project to create a good planting environment for expanding the high-end cultivation of fine products, increasing and improving crop growth.

Second, the situation of water

According to the results of the geological prospecting department of Mei Zheng Group, the 300 meters underground of the leased plot belongs to a rich aquifer, and the water yield can reach 40 cubic meters per hour. Its water quantity standard can be used for irrigation 1200 mu of land.

Third, the project cost budget

1, construction engineering

① Budget of reservoir project: 247,804.85 yuan.

② Budget of well drilling project: 366,400 yuan.

③ Well house project: 72,500 yuan.

2, mechanical and electrical engineering

①200QJ20- 175/ 13 equipment, pipelines, starting cabinets, cables, check valves and other accessories totaled 39,940 yuan.

3, pipe network engineering (including installation)

①90PE pipe (1.25mpa): 52,500 yuan.

② 160PE pipe (0.8mpa):6 2000 yuan.

③ 1 10PE pipe (0.8mpa): 92400 yuan.

④90PE pipe (0.8mpa):150,000 yuan.

⑤PE pipe fittings account for 8% of the pipe: 28,552 yuan.

⑥ drip irrigation pipe: 1.05 million yuan (1.5 yuan/m× 700,000 m).

* drip irrigation pipe is designed according to 700 yuan/mu, 1000 mu. The main branch pipe network adopts PE 100 grade pipes and fittings.

4. Total project cost * * *: 216. 85 yuan.

Our company implored the superior to include this project in the plan. We will raise 200,000 yuan by ourselves as soon as possible to raise funds and buy building materials. It is estimated that the whole project will be completed within two months, and the project will be applied to the land as soon as possible to bring its benefits into play. Our company deeply feels that water resources are related to the lifeline of agriculture, and the relevant units at higher levels are the backer and source of agricultural construction and development. We will benefit the people with excellent performance and successful products and repay the superior units.

I hereby apply.

He' nan zongxin agricultural development co., ltd

XX year XX month XX day

Rural water conservancy application report 5 I. Accepting unit:

Provincial water resources department

2. Matters to be handled:

Examination and approval for commencement of water conservancy projects

(1) Water conservancy projects directly under the Ministry.

(two) provincial key water conservancy projects and water conservancy projects with a total investment of 10 million yuan (approved feasibility study investment).

(3) All kinds of water conservancy projects such as reinforcement of large, medium and small dangerous reservoirs subsidized by the central government, and water-saving renovation of large and medium-sized irrigation areas.

Three. Procedure:

The application materials of the construction unit shall be reviewed by the municipal (state) water conservancy (water affairs and hydropower bureau) and applied to the provincial water resources department.

Four. Application conditions:

(a) the project legal person (or the main body responsible for the project construction) has been established, the project organization and management institutions and rules and regulations are sound, and the legal representative of the project and members of the management institutions have been put in place.

(two) the preliminary design has been approved, the project legal person and the project design unit have signed a drawing agreement, and the detailed construction design can meet the needs of the main project for three months.

(three) the construction fund raising plan has been determined, the project has been included in the national or local water conservancy construction investment annual plan, and the annual construction funds have been implemented.

(four) the quality and safety supervision unit has identified and handled the quality and safety supervision procedures.

(five) the main project construction and supervision units have been identified, and signed a construction and supervision contract, which can meet the needs of the main project.

(six) construction preparation and land acquisition and demolition work can meet the needs of the main project.

(seven) the main equipment and materials needed for construction have been determined, which can meet the needs of the main project construction.

Verb (abbreviation of verb) application materials:

(a) the application report for commencement and the approval form for commencement in triplicate;

(two) the request and approval documents for the establishment of the project legal person, the organization and main personnel of the project legal person (copy);

(3) feasibility study report and preliminary design approval document (copy);

(four) the annual investment plan issued documents and the implementation of construction funds, in place (proof materials);

(five) quality and safety supervision (copy);

(six) construction drawings and drawings for the agreement;

(seven) a copy of the tender documents, the bid-winning notice, the project supervision contract and the construction contract signed by the construction unit and the supervision unit (copy);

(8) Procedures for examination and approval of land requisition;

(9) Other supporting materials.

6. Time limit for completion:

From the date of acceptance of the administrative examination and approval window, make a decision on whether to approve the administrative license within 20 working days; If a decision cannot be made within 20 working days, a decision shall be made within 30 working days with the approval of the office leader. Individual projects need to organize hearing, appraisal, expert review, inspection, testing and quarantine, and the time required is not included in the legal time.

Seven. Legal basis:

(1) Article 13 of the Regulations on Quality Management of Construction Projects (the State Council Order No.279): Before receiving the construction permit or commencement report, the construction unit shall go through the project quality supervision procedures in accordance with relevant state regulations.

(2) Item 173 of Decision of the State Council Municipality on Establishing Administrative License for Administrative Examination and Approval Items that Really Need to Be Preserved (the State Council Decree No.412).

(3) Article 13 of the Regulations on the Management of Water Conservancy Construction Projects (No.Shuijian [1995] 128 of the Ministry of Water Resources): The project legal person or the construction unit shall submit an application report for the commencement of the main project to the competent department, and the project can be officially started only after it is approved according to the examination and approval authority.

(4) Paragraph 2 of Article 8 of the Interim Provisions on the Management of Construction Procedures of Water Conservancy Projects (Ministry of Water Resources 1998): The project legal person or its agency must submit an application report for the commencement of the main project to the competent department according to the examination and approval authority, and the main project can be officially started only after approval.

Eight, charging standard: no charge.