What materials does the director need for filing?

Article 1: Materials required for supervision project filing

Materials required for supervision project filing

Engineering supervision registration form (in triplicate)

Letter of appointment of directors

Verification of the original qualification certificate of filing personnel (national note, provincial note, manufacturing supervision and witness sampling)

Check the original bid-winning notice (direct bid-winning notice), keep a copy and affix the official seal.

Check the original supervision contract filing form, keep a copy and affix the official seal.

Check the original supervision contract, keep a copy and affix the official seal (main seal).

The number of project supervisors meets the requirements of documentNo. Ning Jian Gui Zi 1 (20 10) and is consistent with the bidding documents.

The project director changes the required materials.

Original registration form of original project supervision records.

Registration Form of Project Supervision after Director Change (in triplicate)

Application form for change of directors

Letter of appointment of current director

The original practice certificate and performance certificate of the current director.

The explanation of the reasons for the change of the original director shall conform to the requirements of document Su [2007] 168.

The directors shall not be changed more than twice within one year, and the original directors shall not participate in the bidding within six months after the change.

note:

1. The supervision company and personnel required for filing and the change director need to supervise the credit information system in Nanjing.

Only after passing the exam can they be appointed.

2 in addition to the director (three projects), the personnel required for the record shall not be renewed, and can only be appointed after the completion of the previous project.

Part II: Information required for filing supervision contracts.

Information required for filing project supervision contract in Xiangshui County, Huai 'an

1. Qualification certificate of legal representative or power of attorney of entrusted agent (submit a copy to verify the original)

), the appointment of the director.

2, supervision unit qualification certificate, business license, organization code certificate (submit a copy

One original), which can be exempted from submission when bidding is implemented.

3, the implementation of bidding supervision project, should provide the tender documents and the bid-winning notice (mention

Submit a copy to verify the original); Direct contract supervision project must provide the owner's power of attorney (submit a copy of the original verification).

4. Six originals of the supervision contract (provided by Party A);

5, the project management team personnel list, relevant certificates, labor contracts, the last 6 months.

For the old-age insurance certificate and ID card (submit a copy to verify the original, and the director will press the card).

6, the chief supervision engineer has a project in prison, to provide the consent of the original unit head of science and technology.

If the engineer has no supervision project, the supervision unit shall provide a commitment letter for the project without supervision.

7. Non-Huai supervision enterprises provide "Non-Huai supervision enterprises undertake supervision projects" to the Municipal Housing and Construction Bureau.

Registration form for filing.

8. Upload the supervision information to the construction project supervision management information system of Jiangsu Province. Handling location: 1406 Manager: Wang Fuzheng Tel: 8371615 List of personnel of engineering supervision department of Xiangshui County, Huai 'an City.

Chief supervision engineer: Yuan Zhendong, civil supervision engineer: Gong Biao, installation supervision engineer: Yang Dengyin, and civil supervision engineer: Shao Li.

Civil Engineer: Chen Bingyue.

Part III: Materials Required for Project Filing

Enterprise fixed assets investment project filing

1. Application (one original with official seal)

2. Project proposal or project feasibility study report (original 1 copy)

3, Shanxi province enterprise investment project filing form (original 1 copy and stamped with the official seal)

4. Valid legal person certificate (copy of business license or organization code certificate with official seal) and project resolution of the board of directors (original with official seal)

5. Approval document for energy-saving assessment of fixed assets investment projects (original price)

6. Commitment letter on the authenticity of fixed assets investment projects (original 1 copy, with official seal)

7、

Chapter IV: Attachments Required for Project Filing and Approval

Attachments required for project filing:

Filing application

Fill in the filing application form

company profile

Project introduction

A copy of the business license of the enterprise and a copy.

Energy-saving evaluation program

Communication between land and resources, environmental protection, urban planning and other relevant departments (qualification certificate and copy of legal person ID card are also required for housing projects) Letter of commitment from the project applicant on the authenticity of the application materials provided.

Attachments required to approve the project:

Project application report

Urban planning opinions issued by the competent department of urban planning administration

Pre-examination opinions on project land issued by the administrative department of land and resources

Opinions on examination and approval of environmental impact assessment documents issued by the competent administrative department of environmental protection and other documents that shall be submitted as required by laws and regulations:

—— Belonging to a mineral resources development project, it should conform to the overall planning of the mining area (with a reserve of 654.38+100 million tons or more), and submit the approval of the mining plan, the establishment plan of the project legal person, the mine safety pre-evaluation report, the approval of the mining area delineation, the approval of the water and soil conservation plan report, the bidding plan, the procedures for mine water supply and power supply, and the bank loan commitment letter.

—— For thermal power projects, opinions on technical scheme review of power plants, opinions of water administrative departments on watershed planning of water source projects, opinions on pre-application for water intake permits, opinions on technical review of water source projects from the perspective of public safety, reports and review opinions on water and soil conservation schemes, plans for establishment of project legal persons, opinions of highway departments on large-scale transportation road reconstruction design schemes, bidding schemes and bank loan commitment letters shall be submitted.

—— hydropower projects, materials related to the right to develop hydropower resources, the reply of the water administrative department to the basin development plan, the reply of the pre-application for water intake permit, the technical review opinions of the project from the perspective of public safety, the report of water and soil conservation plan and its reply opinions, the water resources demonstration report of the construction project and its review opinions, the review opinions of the technical plan of the power station, the establishment plan of the project legal person, the review opinions of the immigration administrative department on the reservoir inundation and the resettlement plan of permanent land occupation, and the letter of commitment of the local people's government.

—— A pre-evaluation report on occupational hazards audited by the health administrative licensing department shall be submitted for construction projects that may cause occupational hazards; The construction of large-scale projects in natural foci shall be submitted to the relevant assessment report of the health department.

The project applicant shall be responsible for the authenticity of all application materials.

Chapter V: Materials Required for Filing

Application materials for filing the commencement of safe production conditions

(1) establishment document of the leading group for production safety; (with official seal)

(2) the management system of the construction site (establish the responsibility system for production safety, production safety education system, production safety inspection system)

Conditions, the establishment of shift safety activities system, the establishment of mechanical equipment management system, etc. ); (with official seal)

(3) A copy of the safety production assessment certificate of full-time safety management personnel; (official seal) (original to be inspected)

(4) Copies of equipment and operation qualification certificates of special operators in construction (tower crane drivers, signalmen, electricians, welders, scaffolders, etc.). );

(official seal) (original to be inspected)

(5) Implementation plan and project progress of safety construction measures; (with official seal)

(6) Construction enterprise safety production license (official seal);

(7) Copy of employee accident insurance policy (the original should be checked);

(8) Detailed rules for the implementation of safety supervision;

(9) Special construction scheme (partial) for dangerous projects (earthwork, formwork, temporary electricity consumption, scaffolding, building energy saving, etc. ) with "special structure"

Organizational design (scheme) report form (original);

(10) major hazard control measures and emergency plan (original);

(1 1) Commitment Letter for Civilized Construction of Safety Production in Construction Project (original)

(12) After paying the measures for safe and civilized construction, fill in the Handover Report on Measures for Safe and Civilized Construction of Construction Projects (original);

Application materials for admission filing

1, enterprise qualification certificate;

2, enterprise safety production license;

3. Business license of the enterprise;

4, enterprise construction project cost standard certificate;

5, the identity certificate of the legal representative of the enterprise;

6, enterprise technical director title certificate;

7. A power of attorney shall be submitted for the proposed entrustment, and the client shall handle it with his ID card;

8, the enterprise belongs to (all) construction engineer qualification certificate;

9. Enterprises outside the city need to submit the entry filing procedures of Zhangye Housing and Urban-Rural Development Bureau;

10. Detailed materials for the establishment of the project department by the enterprise. The above materials must be inspected in originals and submitted in copies. Fill in Ganzhou District Construction Market Access Filing Application Form (1 copy), Company Builder Summary Form (1 copy) and Market Access Filing Form (2 copies).

Application materials for quality supervision

1, a copy of the approval document (notice of registration and filing of construction projects);

2, one book and two certificates "Construction Project Site Selection Opinion", "Construction Project (Rural) Planning Permit" and "Construction Land Planning Permit (land use approval)" (copy);

3, design drawings review certificate, review comments and reply (copy);

4, energy-saving review opinions (copy).

5, commercial concrete record form or contract (copy);

6, construction, survey, design, construction, supervision, testing unit qualification certificate copy (official seal);

7, survey, design, construction, supervision, testing unit contract copy (general terms cannot be copied);

8, survey, design, construction, supervision, testing unit management, technical personnel qualification certificate copy (official seal);

9. Copy of qualification certificate of project department of construction enterprise (with official seal)

10, bid-winning notice (copy);

1 1. Report Form of Construction Organization Design (Scheme) (original) is attached to the construction organization design;

12, supervision planning, supervision implementation rules, appointment letter of the director and site supervision personnel (original);

13, geotechnical investigation report (original is not required);

Application data of tower crane

1, tower crane product certificate must be provided;

2, tower crane installation and maintenance instructions;

3, tower crane factory license;

4, inspection report issued by the inspection agency;

5, construction hoisting machinery installation acceptance data;

6, construction hoisting machinery safety management system;

7. A copy of the certificate of special operations personnel must carry the original (driver, bell man and rigger).

8, tower crane, construction elevator and material hoist must also provide the previous use of the test report or the previous construction hoisting machinery use registration certificate and other information;

9. The hoisting machinery and equipment must provide valid certificates such as the hoisting equipment installation qualification and disassembly contract of the installation unit;

10, multi-tower operation scheme.

In addition:

Newly purchased hoisting machinery and equipment: instruction manual, inspection certificate or appraisal report.

Lease of hoisting machinery and equipment: lease contract

Newly purchased tower cranes must fill in the Registration Form of Construction Lifting Machinery in Gansu Province and apply for household registration at Zhangye Construction Safety Supervision and Management Station.