Job Recruitment Website - Ranking of immigration countries - How much concrete is used in Leshan Laomukong Power Station?

How much concrete is used in Leshan Laomukong Power Station?

The proposed address of Laomukong Navigation and Power Junction Project is located in wutongqiao district, Leshan City. It is estimated that the installed capacity of the navigation and power hub is 405,400 kilowatts, the average annual power generation is 65.438+56.5 million kWh, and the construction period is 66.5438+0 months. The main buildings include a 220m×34m×4.5m (effective length× effective width× door depth) three-stage lock, a 23-hole spillway, a power station, a concrete gravity dam, a switch station, a fishway and a flood dike in the reservoir area.