What water conservancy quota and soil quota are used for the project?

Composition and Application of Water Conservancy Quota The current water conservancy quota mainly includes quota distribution document, general description, catalogue, chapter description and quota table, among which quota table is the main part. The use of quotas should be professional and special; Engineering quota and cost quota are used together; The choice of quota should be suitable for the design stage and the role of quota; Familiar with the relevant contents and detailed instructions of quota; Quota application should accurately select the corresponding quota according to the design instructions, and pay attention to quota correction and conversion, and directly apply for or convert correction according to the situation. 1 Composition of Quota The current quota of water conservancy and hydropower projects mainly includes the following contents: 1. 1 Quota issuing documents: legal documents issued by competent departments (Ministry of Water Resources and Water Resources Department) on the implementation of new quotas, the time when old quotas are abolished, and the departments responsible for interpretation. 1.2 summary: it is an overall overview of the structure and content of each single section, and expounds the compilation basis, application scope, use regulations and matters needing attention of the quota. 1.3 directory: it is the index of quota inquiry, indicating the specific content of quota and its corresponding page number in chapters. Description of section 1.4: It is the guidance of quota quotation, and expounds the contents of this section, the calculation of engineering quantity, and the description of digital starting and ending range, etc. 1.5 quota table: it is the main component of quota, and details the name, scope of application, work content and corresponding data table of related quota projects. The use of quota plays an important role in the economic management of water conservancy and hydropower project construction, and the project cost management personnel must use quota skillfully and accurately. To this end, we must do the following: 2. 1 Specialized water conservancy and hydropower project capital construction includes not only hydraulic structures and water conservancy and hydropower equipment, but also housing construction projects, highways, railways, power transmission and transformation lines, communication projects, etc. Water conservancy projects should adopt the quota issued by the water conservancy department, and other projects should adopt the quota issued by the competent department respectively. For example, highway engineering adopts the highway engineering quota issued by the transportation department, and housing construction adopts the industrial and civil engineering quota. 2.2 The engineering quota should be used together with the cost quota. In the process of calculating the investment of water conservancy and hydropower projects, we should not only adopt the project quota, but also combine the current cost quota. Such as other direct quotas, on-site funding standards, spending quotas, etc. 2.3 The selected quota should be suitable for the design stage and the role of quota, and investment estimation indicators should be adopted in the feasibility study. In the initial stage, the budget estimate quota is used to prepare the design budget estimate; Construction drawing budget adopts budget quota. If the quota at this stage is missing and it is necessary to use the quota at the next stage, it shall be multiplied by the transition coefficient as required.

2.4 Be familiar with the relevant contents and detailed instructions of the quota (1). First of all, read the general description and chapter description of the quota carefully. The scope of application of the quota, the work content and expenses involved, the relevant adjustment factors and the use method of the quota pointed out in the description should be familiar and familiar. (2) Understand the work content of the quota project. According to the construction site, construction methods, construction machinery and other construction conditions, correctly select the fixed items, so as to achieve good items, no missing items and no heavy items. (3) Learn to use the quota appendix. Such as geotechnical classification, mix proportion of mortar and concrete, coefficient of formwork erection, amount of installation materials, etc. (4) Attention should be paid to the scope of application of the quota unit and the digital representation in the quota, and the unit of measurement of the budget item should be consistent with the unit of measurement of the quota item. It is necessary to distinguish the natural surface and compaction surface of earthwork; Finished cubes, natural cubes and stacked cubes in sand and gravel preparation; Masonry square and courtyard square in masonry engineering; Concrete mixers and entities. In the quota, adding "above" and "outside" after all figures does not include the figures themselves; The "below" and "within" after all numbers include the numbers themselves. Where the upper and lower limits of numbers are used, such as 1000~2000, it is equivalent to more than 1000 and less than 2000. 2.5 The application of quota should accurately select the corresponding quota according to the design instructions, and pay attention to the correction and conversion of quota. (1) Directly applying quota When the design requirements are completely consistent with the contents of the selected quota items, the quota items can be directly applied, and the following points should be paid attention to when applying: Select the quota items according to the design instructions. Carefully compare the project contents, construction methods and technical characteristics, and accurately determine the quota items corresponding to the design drawings. The name, content and measurement unit of subdivisional work in design drawings shall be consistent with the budget quota project. (2) Conversion of Quota When the construction conditions are inconsistent with the provisions of the quota project, it shall be converted and revised according to the relevant provisions in the "Remarks" in the quota description and quota table. Quota conversion is the process of making the content of the quota consistent with the design requirements, that is, according to the provisions of the quota, the shifts of labor, materials and machinery listed in the original quota are adjusted to make the budget price, quantity and shifts of the original project conform to the actual situation. The conversion of quota must meet the following three conditions at the same time: when the design content and construction method are inconsistent with the content of quota project; Allow the conversion of relevant contents in the preparation regulations and instructions; The conversion must be carried out in accordance with the prescribed methods. The conversion of various coefficients, unless otherwise specified, is generally a multiplication calculation. When using, it is necessary to distinguish whether the correction coefficient is completely corrected or only multiplied by one or more of labor hours, material consumption and mechanical shift hours.

5.9

Baidu library VIP limited time discount is now open, enjoy 600 million +VIP content.

Go get it now

Composition and use of water conservancy quota

Composition and use of water conservancy quota

The current water conservancy quota mainly includes quota release document, general description, catalogue, chapter description and quota table, among which quota table is the main part. The use of quotas should be professional and special; Engineering quota and cost quota are used together; The choice of quota should be suitable for the design stage and the role of quota; Familiar with the relevant contents and detailed instructions of quota; Quota application should accurately select the corresponding quota according to the design instructions, and pay attention to quota correction and conversion, and directly apply for or convert correction according to the situation.

Composition of 1 quota

Page 1

The current quota of water conservancy and hydropower projects mainly includes the following contents:

1. 1 Quota issuing document: refers to the legal document issued by the competent department (Ministry of Water Resources and Water Resources Department) on the implementation of the new quota, the abolition time of the old quota and the department responsible for interpretation.

1.2 summary: it is an overall overview of the structure and content of each single section, and expounds the compilation basis, application scope, use regulations and matters needing attention of the quota.

1.3 directory: it is the index of quota inquiry, indicating the specific content of quota and its corresponding page number in chapters.