Brief Introduction of the Three Gorges Dam Project on the Yangtze River

The Three Gorges Project of the Yangtze River adopts the scheme of "one-level development, one-time completion, water storage by stages and continuous resettlement". The total construction period of this project is 1993 to 2009 *** 17 years, which is divided into three stages, and the project was completed in 2009.

The first phase project (1994- 1997) is the construction preparation and the first phase project.

The second phase project (1998-2003) is the second phase project.

The third phase of the project from 2004 to 2009 is the third phase.

The dynamic total investment of the Three Gorges Project is estimated to be 203.9 billion yuan, and the reservoir will eventually submerge 4310.3 million mu of cultivated land, and eventually10.65438+0.8 million people will be resettled. Among them, the hub project is 50.09 billion yuan; 11300,000 resettlement fee is 30.07 billion yuan; The power transmission and transformation project is 654.38+05.3 billion yuan.