Job Recruitment Website - Ranking of immigration countries - Charge standard of project settlement audit

Charge standard of project settlement audit

The project settlement audit fee standard is as follows:

1, when the cost consulting service fee is less than 5,000 yuan, it will be charged at 5,000 yuan;

2. Whole process cost control If the service content in some stages is not implemented, the rate of the corresponding stage will be deducted;

3. According to the complexity and difficulty of project management and technology, the difficulty adjustment coefficient of complex coefficient can be calculated between 1. 1 ~ 1.3, and the complexity coefficient can be calculated for simple projects such as independent earthwork, soft foundation treatment project and greening project, with the difficulty adjustment coefficient between 0.7 and 0.9;

4. Whether the engineering materials and equipment are included in the control price and settlement price shall be included in the charging base.

The project settlement audit time is specified as follows:

1 5 million yuan, 20 days from the date of receiving the completion settlement report and complete completion settlement information;

2, 5 million yuan-20 million yuan, 30 days from the date of receiving the completion settlement report and complete completion settlement information;

3, 20 million yuan-50 million yuan, 45 days from the date of receiving the completion settlement report and complete completion settlement information;

4, more than 50 million yuan, 60 days from the date of receiving the completion settlement report and complete completion settlement information.

Legal basis: Article 13 of the Interim Measures for Settlement of Construction Project Price.

The settlement and payment of the project progress payment shall meet the following requirements:

(1) Settlement method of project progress payment

1, paid monthly. That is, the method of paying the progress payment on a monthly basis and liquidating after completion is implemented. For projects with a contract term of more than two years, the project inventory should be made at the end of the year, and the annual settlement should be handled.

2. Settlement and payment by sections. That is, projects that started in the same year but could not be completed in the same year will be paid in different stages according to the project image progress. The specific division is clearly stipulated in the contract.

(2) Calculation of engineering quantity

1, the contractor shall, in accordance with the way and time agreed in the contract, submit a report on the completed quantities to the employer. The Employer shall verify the completed quantities within 65,438+04 days after receiving the report, and notify the Contractor 65,438+0 days before verification. The contractor shall provide conditions and send personnel to participate in the verification. After receiving the notice, the contractor will not participate in the verification, and the quantities verified by the employer will be used as the basis for paying the project price. The employer failed to notify the contractor at the agreed time, which led to the contractor's failure to participate in the verification, and the verification result was invalid.

2. If the Employer fails to verify the completed quantities within 14 days after receiving the contractor's report, the quantities reported by the contractor shall be regarded as the basis for paying the project price from 15 days. Unless otherwise agreed in the contract, the contract shall prevail.

3. The Employer will not measure the contractor's quantities beyond the design drawings (including design changes) and rework caused by the contractor.

(III) Payment of progress payment

1. According to the determined engineering measurement results, the contractor applies to the employer to pay the project progress payment. /kloc-within 0/4 days, the employer shall pay the progress payment to the contractor at not less than 60% and not more than 90% of the project price. The advance payment that should be deducted by the Employer at the agreed time shall be settled and deducted at the same time as the project progress payment.

2. If the Employer fails to pay the project progress payment within the time limit, the Contractor shall promptly send a dunning notice to the Employer. If the Employer still fails to pay as required after receiving the notice from the Contractor, it can negotiate with the Contractor to sign a deferred payment agreement, and the payment can be postponed after the consent of the Contractor. The agreement shall specify the time of deferred payment, and the interest payable shall be calculated from the15th day after the confirmation of the engineering measurement results (the interest rate shall be calculated according to the bank loan interest rate for the same period).

3. If the employer fails to pay the project progress payment as agreed in the contract and both parties fail to reach an agreement on deferred payment, the contractor may stop the construction, and the employer shall bear the liability for breach of contract.