2022 Water Conservancy Year-end Summary Personal Series

Soon, time flies, the day of the year is coming to an end, and I have to prepare to write the annual work summary of my post. Abstract is a written document for evaluation and description. What is the annual work summary of an excellent post? Please stay for a while. I recommend someone to summarize the water conservancy year-end for you. Welcome to share it with your friends!

Year-end summary of water conservancy 1 This year, under the leadership of the Municipal Water Conservancy Society, I worked actively, pioneered and innovated, faithfully served water conservancy construction and water conservancy economic development, and made certain achievements in promoting the healthy and sustainable development of ecological water network. The main work in the past 20 years is summarized as follows:

First, fine management is carried out to maximize the benefits of ecological water network projects.

My office is mainly responsible for the management and operation of the city's ecological water network project. In order to scientifically dispatch water sources and ensure the safe operation of the ecological water network, especially in view of the serious shortage of above-ground water storage in the city this year, we have carefully formulated plans and plans, implemented strict dispatching, organized personnel to check at any time, and better controlled the water level of water control projects and channels; Strictly and scientifically dispatch urban water sources to ensure a good and safe water supply order.

This year is the most severe year since the operation of ecological water network, and the water source is the most tense period. The storage capacity of the two major reservoirs is only _ _ million m3 and _ _ million m3 respectively, and the water shortage situation is more serious than once every 20 years. In order to ensure the normal operation of the ecological water network and ensure the safety of industrial and agricultural production in the city, the whole department first established the concept of "water is more expensive than oil and cannot be wasted", carefully scheduled and scientifically managed. In addition to the peak period of agricultural irrigation, the water system has always insisted on high water level and low flow, even running near the warning water level. Second, in order to make good use of rain and flood resources, give full play to the role of sluice and culvert hub along the river, and use flexible dispatching means to block water sources one after another and make effective use of them. Third, in view of the serious drought situation, extensive publicity was carried out to ask the masses to change the planting structure and sow more drought-resistant crops. Throughout the year, the water network realized 10,000 mu of farmland irrigation, of which 10,000 mu was irrigated by the main and branch canals under control and management, and 10,000 mu was irrigated, which contributed to the city's agricultural harvest.

Two, actively organize cadres and workers to participate in various learning and training, improve the technical level.

Actively organize the relevant cadres and workers of the whole institute to participate in various professional business training courses organized by higher authorities, and participate in various trainings such as accounting, accountants, legal representatives and personnel. , to carry out water transfer, water use, water management and other aspects of learning and training. Through the form of office meetings and office plenary meetings. The cadres and workers of this department also participated in the study of hydrology, water resources and accounting through self-study and correspondence, and combined with the training of hydrological testing, carried out the special training of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Through systematic study, the political quality and professional quality of grass-roots water conservancy workers have been comprehensively improved, and their practical work ability has been enhanced, which has laid a certain theoretical foundation for water conservancy construction and management to reach a new level in the new period.

Three, strengthen the technical foundation and innovative management, and promote the scientific management of water network.

While strengthening the management of ecological water network project, we should actively do a good job in popular science propaganda, guide agricultural irrigation and water fee collection during the most tense period of agricultural irrigation, strengthen water-saving propaganda, and encourage counties to use new water-saving technologies and equipment to maximize the benefits of limited water resources.

At the same time, we should change our thinking in time, start with the work of ecological water network, innovate management concepts, guide and help counties to do a good job in county water landscape construction, especially give full guidance and support in concept and technology, give the greatest satisfaction to water resources in the critical period, and focus on guiding _ _ county to complete the water surface construction of _ _ lake landscape and _ _ county to complete the water landscape construction of _ _ garden. Actively organize members to write academic papers and study scientific and technological innovation. This year, "Ideas and Measures for Comprehensive Management of _ _ River in _ _ City" written by our office was published in _ _ sponsored by _ _ Provincial Water Conservancy Society. Combined with my own work, I have compiled an ecological water network management manual from the aspects of water source engineering, irrigation area engineering, water storage engineering, drainage engineering, water metering engineering and dispatching management.

In 20__ _ _, under the leadership of the Municipal Water Conservancy Society, combined with the _ _ plan, our city will add hundreds of millions of cubic meters of water for the implementation of _ _ and other projects. In-depth study will be made on how to effectively dispatch and manage water to benefit the people of the city, do a good job in water transfer, and give full play to the maximum role of ecological water network.

Year-end Summary of Personal Articles on Water Conservancy 2 Under the correct leadership of the county party committee and government, under the care and guidance of the county water conservancy bureau, and through the joint efforts of cadres and masses in the township, water conservancy management in our township has done some work in flood control and water conservancy management. Now, we will briefly summarize the water conservancy work in the past 20 years:

1, in flood control:

The flood control and drought relief headquarters was established, and the 20-year flood control implementation plan and emergency flood control plan for water conservancy projects were formulated. Implement all kinds of flood control materials in the area, and allocate emergency materials and tools such as sand, gravel and woven bags, and the person in charge is responsible. The water conservancy managers in each village have received on-the-job training (in the township government), which has strengthened their sense of responsibility. At the same time, emergency teams for flood control and emergency rescue have been established at both rural levels, with specific division of responsibilities. In particular, my hometown 7.25 and 8. 12 suffered a catastrophic flood which is rare in history. Under the correct leadership of the township party Committee and government, it won a major victory and ensured the safety of people's lives and property.

2. Winter maintenance:

According to the arrangement of the county magistrate, a special meeting was held, the winter road reconstruction plan was compiled, and the main battlefield for winter road reconstruction was determined. The main battlefield of this year's winter repair is mainly

(1) Baiyangtan to Nanchenggou section.

(2) along the fire ditch.

③ Zhu Yuan and Wang Ping.

(4) Yuanqu reach

(5) Liu Jialiang section.

Roads in other villages will be completed by the villages themselves before the end of February 20 _ _-65438.

In the past 3 1 year, under the correct leadership of the superior, under the specific guidance of the Water Conservancy Bureau, with the strong assistance of the village leaders and the active efforts of all the staff in the institute, we have conscientiously studied and implemented the relevant water conservancy laws and regulations, actively completed the tasks assigned by the Water Conservancy Bureau, and promoted the development of water conservancy in our town through the development of farmland water conservancy capital construction, and successfully completed the tasks assigned by the higher authorities. The following is my annual work summary:

First, strengthen business study and formulate rules and regulations.

Organize the staff in the institute to learn relevant water laws and regulations, actively participate in computer training courses, administrative law enforcement examinations and financial personnel training courses, and improve their business knowledge and work functions. At the beginning of the year, a series of rules and regulations such as various work plans, work responsibilities, flood control duty system and financial management system were formulated, and the division of labor was clear, which laid a good theoretical foundation for the smooth development of the work.

Second, do a good job in the capital construction of farmland water conservancy.

1, irrigation

Two irrigation areas were built this year, one of which is the channel of the labor village, which was washed away during irrigation. At that time, it was the time for farmers to transplant rice seedlings, which affected farmland irrigation. So I went to the countryside many times to understand the situation and solved __x woven bags and __x meters of plastic sheets. The other is the barrage in _ _ village, which has washed away _ _ meters for some reason, resulting in water shortage in _ _ rice fields. In order to solve the problem of farmland water use, we have negotiated with the higher authorities many times without weekends. It took _ _ days to pull stones and weave cages, repair the washed dams and canals, and ensure the irrigation water in _ _ village. In addition, a village bridge was repaired, and materials such as cement and steel bars were solved in time, which did not affect the normal water use of paddy fields.

2. Drinking water project

In order to solve the drinking water problem of the villagers, the following work has been mainly solved. First of all, we helped _ _ village to repair the reservoir, solved the problem of water seepage, and let the villagers drink tap water in time. Secondly, the renovation project of tap water in Minzhu Village includes drilling a deep well, maintaining reservoirs and pipelines, among which the reservoir project has not been constructed. Thirdly, Xiaoying village drilled two deep wells, repaired pipelines, and vigorously mobilized the village's financial and material resources to solve the farmers' drinking water project. And report the drinking water projects in other villages to the superior, and make the project design and budget estimate in advance.

Third, do a good job in flood control.

Flood control work is an important event to protect the national economy and the safety of people's lives and property, and it is also the focus of the whole town's work. As a water conservancy department, report the characteristics of flood control work this year to the competent leaders before the flood season comes, and formulate a flood control responsibility system to achieve early departure, early preparation and early prevention.

1, strengthen organizational leadership. Villages are required to establish and improve leading groups for flood control work, clarify leadership responsibilities, divide responsibilities and perform their duties, so that this year's flood control work is organized and guaranteed.

2 flood control post responsibility system has been implemented. The members of the leading group for flood control in the town have their own responsibilities, such as small reservoirs, ponds, river banks, etc., and sign letters of responsibility for small reservoirs and ponds with village leaders and pond owners. Organize staff to go to the countryside frequently, check the situation, find problems and solve them in time. If there is any problem that cannot be solved, report it to the competent leader, which will attract the attention of the leader and be solved in time. At the same time, assist the villages to clean up the garbage in the flood drainage ditch in time to achieve the standard of smooth drainage in flood season.

3. Flood control on duty. During the flood control period, we should consciously abide by the duty system. No matter day or night, no matter whether the weather is good or bad, there is no rest day, we should stick to our posts, fill in the duty situation of the day carefully, and provide the leaders with rain, water and disaster conditions in time to avoid missing posts.

Four, the basic data of water resources investigation work

In order to further grasp the utilization of water resources in each village, we went to the countryside to make a thorough investigation of each village and collected specific data such as springs, deep wells and vegetable fields. This work is complicated and long-term. We will continue to do a good job in all kinds of data census next year, and also create favorable conditions for applying for projects in the future.

Verb (abbreviation of verb) Do a good job in immigration investigation.

This year, the higher authorities arranged for the water conservancy department to conduct an immigration survey, which is related to the interests of future immigrants receiving subsidies. Therefore, from the first step to register immigrants, the second step to register immigrant children, deceased families, witness signatures and villagers' signatures, a series of registration processes require all villages to strictly control, the leaders are responsible, and the list is published. This immigration registration is the first time that the higher authorities have started this work. So many aspects are repetitive, complicated and tedious, so the village leaders feel very patient, but considering the vital interests of the vast number of immigrants, they still patiently explain to them so that there are no loopholes in immigration registration.

The intransitive verb prepares the project design report.

According to the survey department of Water Resources Bureau, the survey and design projects in our town this year include _ _ tap water, _ _ flood control ditch, _ _ reservoir and _ _ ditch small watershed project. Among them, _ _ gully small watershed management project was reported to the Finance Bureau, _ _ reservoir reconstruction was completed, and _ _ tap water project was reported to the Water Conservancy Bureau. Water is the lifeline of mankind, and the world is facing a water shortage crisis. In order to raise people's awareness of saving, water law publicity activities were carried out. Be able to go to the countryside in time to organize the general election of the village-level two committees in Baocun. Do a good job in Qingming fire inspection and new house project. Actively participate in theoretical study and various activities organized by government departments.

Work ideas for next year: do a good job in flood control, re-investigate the basic situation of dams, continue to do a good job in general survey of basic data of water resources and soil and water conservation, and severely crack down on indiscriminate sand mining and build buildings in flood control ditches. Timely report the drinking water project and flood control ditch project in each village.

In a word, in the past year, although our work has made some achievements, there are still great shortcomings. In the new year, under the correct leadership of our superiors, we will overcome difficulties, seize opportunities, blaze new trails, sum up experience, work harder to do all the work assigned by our superiors, and make due contributions to the water conservancy cause of our town.

Water conservancy year-end summary article 4 is fleeting, the sun and the moon fly, time often passes inadvertently, and a year is fleeting between our fingers. Looking back on a year's work, I can't help thinking a lot, and I am happy with the harvest. From the hardships of exploration, I summarized my work and study in the past year as follows:

First, strengthen policy theory study and improve political quality.

Over the past year, I have persisted in studying the principles and policies of the country, and in accordance with the specific requirements of the spirit of the documents issued by the office, I have completely completed all the work and learning tasks assigned by the office. In my usual study, I have further emancipated my mind through continuous practice and deepened my understanding of theoretical knowledge through personal summary, so that I have been strict with myself and consciously abide by the rules and regulations of the office, laying a solid ideological and political foundation for my future work.

Second, strengthen business study and improve work skills.

Based on my own work, I strengthened the continuous improvement of my business skills, always followed the pace of water conservancy in the times, followed the learning consciousness of advanced technical theory knowledge and professional technical knowledge, became a learning worker, strengthened the spirit of seeking truth from facts, innovated various concepts, improved the essential requirement of being in power for the people, and with my continuous efforts and the help of my colleagues, further improved my business skills and organizational management capabilities, thus further improving my business skills and level.

Third, do your job conscientiously.

I work hard, obey long-term arrangements, and strive to complete various tasks. The safe operation of the project is the primary task to ensure irrigation. Over the past year, I have persisted in further understanding and mastering the current situation and operation of the project, and carefully studied the engineering performance of each main canal, the installation and debugging of information automation facilities, and the inspection, replacement and maintenance of each bucket hoist. In the normal operation and inspection of the project, I always do: people, channels and eyes. Report problems in time, and coordinate and solve various systems and post objectives and responsibilities of project management in time. The number of patrol reports on problems existing in normal operation and key canal sections has been increased, and the safe operation of the project has been realized.

In the next emergency repair, the staff on the section and I, in the scorching sun, worked overtime on the collapsed parts of the five branches and one canal, and strictly controlled the quality, which ensured the seriousness of engineering maintenance and the reliability of operation management. It was the safe operation of the project in the past year and ensured the normal irrigation in the irrigation area.

Four. Irrigation management

1, calibration of metering facilities is an important task of hydraulic engineering. A new description is given to the measuring weir, which ensures the clarity and accuracy of the observation water gauge. In the metering work, in cooperation with the statisticians of our hospital, 99 metering inspections were carried out on the water intakes of various departments throughout the year, ensuring the accuracy of metering.

2. During the inspection of normal irrigation water distribution channels, I dutifully adjusted the design flow of channels at all levels according to the instructions in paragraph, carefully filled in the water level records observed during the inspection, and strictly carried out the inspection of water distribution for each channel three times a day, so that all crops were irrigated in time, and there was no drought on an acre of land, achieving a "double harvest" of economic and social benefits.

This year's work is over. While some achievements have been made, the task of water conservancy system is also very arduous. We should constantly sum up experience, find loopholes in work, analyze the reasons, constantly improve working methods, strengthen unity and cooperation, be strict with ourselves in all aspects, further forge ahead, always maintain the first-class spirit, and strive for the overall goal of water conservancy projects!

I have been studying Marxism-Leninism and Mao Zedong Thought, deeply understanding Comrade Deng Xiaoping's theory of building Socialism with Chinese characteristics, adhering to the four cardinal principles of the Party, supporting the leadership of the Central Committee, supporting the socialist system, supporting the reform and opening up policy, loving the water conservancy cause, and being full of affection for the unit I serve. Pay attention to their own ideological construction, constantly improve their political quality, match words with deeds in their work, have a correct style of work and seek truth from facts. Be strict with yourself, dare to fight against violations, dare to carry out criticism and self-criticism, unite with comrades, respect leaders, successfully complete all tasks assigned by superiors, adhere to the principle that personal interests are subordinate to the interests of the unit, regardless of personal fame and fortune. Strict and meticulous work style, Excellence, diligence and pragmatism. Maintain a healthy attitude, be positive and optimistic, and have full confidence in the future of water conservancy undertakings and units.

First, pay attention to learning at work. If you can learn and master new technologies, new knowledge, new standards and new norms in time, you will apply them in your work. You will persist in learning according to the needs of your work and apply the technology and application you have learned to practical work, so that your professional level will be improved, you will have strong professional working ability, and you will engage in technical work in multiple positions according to the needs of your work and obey the arrangement of the leaders. In the construction of the three-side light seepage control project of the north main canal, as an engineering technical assistant, I was responsible for the construction and quality supervision of the distribution canal section and the arrangement of the completion data.

Second, according to the characteristics of complex engineering structure and short construction period, the reinforcement design of small reservoirs gives full play to its own professional expertise, rationally plans the construction period, accurately formulates the resource plan, determines the construction scheme, and actively promotes the application of new technologies, new processes and new materials. The project was rated as an excellent project. The construction is difficult. As the technical director of the project, I kept forging ahead in the construction process, studied hard, consulted modestly, actively assisted on-site construction personnel to solve various technical problems encountered in the construction process, thoroughly implemented ISO9002 quality system standards, and organized the construction in strict accordance with the company's quality management procedures, so that the project quality, safety and construction period were completed in strict accordance with the contract requirements. The project won many honors and awards such as Hebei Diameter Civilized Construction Site and Hebei Science and Technology Progress Award. At the same time, my professional quality and ability have been further improved and strengthened through my own study and work practice. Haitong Building Project in Shijiazhuang is located beside Zhongshan Road, the most prosperous city in Shijiazhuang, opposite to the railway station. Because it is located in the downtown area, the construction site is narrow and the construction is difficult. As the technical director of this project, I keep forging ahead in the construction process, study hard, actively assist the site construction personnel to solve various technical problems encountered in the construction process, and organize the construction in strict accordance with the company's quality, environment and occupational health and safety management procedures. Complete the quality, safety and construction period of the project in strict accordance with the contract requirements. The project won the honor of civilized construction site in Hebei province, won the praise of the owners, won a good social reputation for the company and established a good social image. At the same time, my professional quality and ability have been further improved and strengthened through my own study and work practice.

Pay attention to summing up experience in construction, and complete the exchange of papers such as Standardization and Standardization of Safety Production Materials Management, Selection of Tower Crane from a Technical Point of View, and Application Practice of Plastering Gypsum at the company's annual technical work meeting.

The above is the main technical work I have been engaged in for a year. Through learning from books, learning from practice, learning from others, plus my own analysis and thinking, I have indeed made great gains and progress. Achievements and shortcomings coexist, and experience and lessons go hand in hand. Overcome shortcomings, learn endlessly, and the road extends under your feet. I will, as always, go all out in my work, keep learning, strive for progress, improve my professional quality, exercise my working ability, sum up experience, learn from training, do my work better, serve the training and care of the unit, and contribute all my energy to the unit and the water conservancy cause.