District Construction Bureau's Work Summary and Plan for the Second Half of the Year
In the first half of the year, under the correct leadership of the district party committee and the district government and the guidance of the superior industry authorities, the District Construction Bureau conscientiously implemented the spirit of the Third Plenary Session of the 16th CPC Central Committee, overcame the difficulties of heavy urban construction and management tasks and tight time in accordance with the overall requirements of the district party committee and the district government, vigorously accelerated the construction of urban infrastructure, strengthened urban management and industry management, promoted the coordinated development of all work, and successfully completed all tasks assigned by the superior.
First, strengthen the dominant position of planning and pay close attention to urban planning management.
In strict accordance with the requirements of zoning planning, strengthen measures, give full play to the functions of planning and design, urban surveying and mapping, village construction and planning management, and pay close attention to the management of various measures, so that the urban and rural planning and design work in the whole region will reach a new level.
1. In the first half of the year, * * * issued 22 site selection opinions and planning permits, covering an area of 1853.85 mu. Issued 12 construction project planning permit with a construction area of 105800 m2.
2, carefully prepare the urban and rural planning, promote the standardization of industry planning approval. Complete the overall planning of Rongshan Town and dagang town and the planning of village and town system; Complete the road network planning of Chonggang master plan; Complete the reconstruction planning of Shangdundu Jinlong South Road, the detailed planning of Yu Ming Garden Phase II and the adjustment of Luojiaxiang Construction Detailed Planning Phase II; Complete the planning of four resettlement sites in Liao Fang and the relocation and resettlement planning of Fu Ba Line; The location of Jiangling Training Center, Linchuan Winery Group, Linchuan No.1 Middle School and No.2 Middle School was selected.
3. Completed urban surveying and mapping. The topographic maps of Chonggang Town (3 square kilometers), Luohu Town (5 square kilometers) and Taiyang Town (3.5 square kilometers) were mapped. Complete the surveying and mapping of land requisition for expansion of Linchuan No.1 Middle School and Linchuan No.2 Middle School and the surveying and mapping of land requisition for hot springs.
Two, through the city investment company to operate the city, the market operation of Linchuan urban construction.
Our bureau continues to take the city investment company as the main body, implement the city management strategy, use the market economy means, vigorously revitalize the state-owned land, and successfully operate the construction of Linchuan Town.
(1) Shangdundu Old City Reconstruction Project
1, Phase I renovation project: the dormitory of cotton and linen company with the left area of 167 1.34 square meters in Phase I was demolished, and the demolition agreement has been signed for the public houses, while the private houses are actively working; The demolition of the Party School's 6,360m2 dormitory has been completed, including preliminary preparation, demolition permit, evaluation, publicity and mobilization. And this work is being done at home. Complete the preliminary work of land auction at the intersection of Zhongxing Road and Qiaodong Road 1377.5 square meters. Binjiang Park covers an area of 76 mu, and Shenzhen Xinzhong Design Company was entrusted by the city investment company to invest 282,000 yuan, and the construction drawing design was completed in mid-May. The reconstruction of Zhongxing Road with a total length of 962 meters and a width of 26 meters has completed the laying of more than 400 meters of main lanes in the first half of the year, with an investment of 2.2 million yuan. The commercial and residential building area within the scope of the first-phase renovation is 1 10000 square meters. In the first half of this year, the Binjiang Building, the Cultural Plaza and the Binjiang Garden have all been capped, and the Binjiang Plaza is stepping up construction, which is expected to be basically completed this year.
2. The second phase of the old city reconstruction project: the second phase of the reconstruction, demolition, demolition permit and evaluation work has been completed, and the demolition implementation plan has been formulated. In the second phase of reconstruction, 8 1.600 square meters of houses need to be demolished, and the compensation for demolition costs is 40.93 million yuan, involving more than 730 households. According to the adjustment of relevant national policies, combined with the actual situation of the second phase transformation and funds, the company made an economic analysis of the overall investment promotion and block investment promotion in the second phase transformation, drew up a detailed investment promotion construction plan, and held talks with many merchants. The site selection of affordable housing construction has been completed and preliminary planning has been made. The economic analysis of the first-phase construction of 210.6 million square meters has been completed, and the construction implementation plan has been formulated.
(2) Yu Ming Garden Residential Project
In the first half of the year, * * * sold 87 houses, 48 storefronts, 34 wooden houses and kindergartens 1 school, with an income of 822 1, 654,38+0,000 yuan. Up to now, Yu Ming Garden Community has achieved a cumulative sales income of 654,38+0,909, and 540 yuan (including the sales income of the remaining houses in the first phase of 3.926 million yuan). 1-June * * * invested more than 700,000 yuan to build a 300-square-meter kindergarten to complete sidewalk laying and environmental greening; Complete the installation of water, electricity and audio doors. The total construction area of the third phase project is 654.38+10,000 square meters. The first phase has planned and designed a 50,000-square-meter residence, and has drawn up a construction plan. Site leveling and preliminary project bidding are in progress. The security of the community has been strengthened, and more than 200,000 yuan has been invested to improve and maintain the supporting facilities of the community, further improving the community environment. Sign property management agreement with users, train property management personnel, and collect property management fee 1.55 million yuan in the first half of the year through hard work.
Third, accelerate the pace of urban infrastructure construction, strengthen urban management, and carry out all urban construction work in an orderly manner in the first half of the year.
Over the past six months, our bureau has increased investment in urban infrastructure and accelerated the pace of urban construction. Strengthen urban management, so that the appearance of Shangdun city has been significantly improved. Municipal, garden, sanitation, urban management, tap water and other departments have done a good job in the industry.
1, the municipal administration department invested1183,000 yuan for the construction of urban municipal facilities. Complete the sewer reconstruction at the west exit of Jianshe East Road, and the culvert sewer reconstruction with a total length of 760m and a length of Ф1.00m from Tianqiao Bridge in Linchuan New Town to Xiong Jia, Yu Fang; Dui downtown 700
The main sewers and branch sewers over 0 meters have been dredged. Complete the renovation and new construction of the sewers inside and outside the public, inspection and French dormitories supervised by the District People's Congress, and complete the main sewer from the Agricultural Machinery Company to Xinxin Building160m long. Completed 400 square meters of sidewalk maintenance, 60 meters of trench wall and 506 replacement cover plates. The street lamps in the urban area were thoroughly inspected and maintained, and the old street lamps of Linchuan Avenue 1 15 and the new street lamps of 1 14 were removed, and 24 old street lamps of Shangdundu Bridge were removed and 20 new street lamps were installed.
2. The garden management department has done a good job in the daily management of street trees and green belts on Linchuan Avenue. Invested more than 50,000 yuan to transform street trees in Jinlong South Road, and replanted all the old French phoenix trees in Tianji Guicheng; The interior of Zhongzhou Park is re-planned, the seedlings in the park are maintained and reconstructed, and the scenic spots are re-planned. Yu Ming road green belt is trimmed once a month, and the garbage and weeds in the green belt are carefully cleaned, plants such as sisal are arranged in the green belt, and pittosporum is trimmed in the urban green belt. In the case of tight economic conditions, the green belt was treated with drugs and pesticides, and the budding and pruning of street trees on Qiaodong Road, Jinlong North Road, Jianshe Road and Gongyuan Road were completed.
3. The sanitation department strengthens the target management responsibility system for street cleaning and cleaning to ensure the daily production of domestic garbage. Wenchang City Environmental Sanitation Institute took over the environmental sanitation work of small streets and lanes in the city as an opportunity to strengthen management, straighten out the relationship and improve the social and environmental benefits of environmental sanitation. According to the work arrangement of the municipal and district government departments, the environmental sanitation work of nearly 100 small streets and alleys in Fuzhou was officially taken over by Wenchang Environmental Sanitation Office in June this year. We made reasonable adjustments from management to operation, and transferred a group of employees with strong sense of responsibility and certain working ability to take charge of the management of small streets and alleys in the whole institute. Based on the principle of "people's satisfaction is our service aim", a "1 10" mobile monitoring and environmental sanitation system was established by perfecting the system and strengthening management, which solved the problems reflected by residents in time and managed the important sections such as Beishan Road, Fulin Road, Gongyuan Road, Sanyuan Building and Xinglufang in a targeted manner, and the environmental sanitation of small streets and lanes was greater than before. By adjusting the management structure, the city appearance supervision and street work are unified, the relationship is straightened out, and the management function is further strengthened. In the past six months, it has experienced dozens of environmental sanitation inspections. During the rectification period, more than 30 dead spots of garbage in the urban-rural fringe were cleared, involving more than 600 people. Through centralized rectification, the city appearance and environmental sanitation in the region have been further improved, which has been well received by superior leaders. Shangdundu Environmental Sanitation Institute attaches great importance to the environmental sanitation management of Shangdundu urban area, which has obviously improved the environmental sanitation situation of Shangdundu. Earnestly formulate the Environmental Sanitation Work Renovation Plan of Shangdundu Area in Linchuan District, with all administrative personnel participating in the front-line management, and implementing the responsibilities to people, and improving various rules and regulations, so that the environmental sanitation work will gradually move towards the track of institutionalization and standardization. Seize the opportunity of environmental improvement, increase publicity, improve public health awareness, and gradually implement garbage bagging for shops and unit buildings along the street. All the dumped garbage was buried, effectively reducing environmental pollution.
4, urban management brigade strong quality tree image to do a good job in urban management. The first is to increase the publicity of public opinion and gain the trust and support of the general public. In March this year, we conducted a thorough investigation on the occupation of roads, disorderly construction, littering and environmental sanitation in Shangdundu City (including Jinshanjiao), and formulated a targeted remediation plan. In April, we concentrated our efforts on the joint rectification of key and difficult areas in the city, * * * cleared 27 illegal occupation households, standardized occupation stalls 16, and demolished illegal occupation buildings 3 1 building.
5. The tap water companies in this area tap the potential and strive to improve the economic benefits. In the first half of the year, the output value was 6.5438+0.02 million yuan, an increase of 2% over the previous year; 750,000 tons of water were sold, an increase of 3% over the previous year; The tax is 60,000 yuan, an increase of 1% over the previous year, and 60,000 yuan is still owed. First, according to the water consumption situation, rationally dispatch the electricity consumption of water plants. Strengthen the maintenance of the unit, maintain a good running state, and greatly save costs. The second is to clean up the registered urban water meters again, standardize management, improve various procedures, and effectively plug the loopholes in water fee loss. The third is to increase the collection of water charges. Take effective measures to put an end to the phenomenon of "human feelings for water", and at the same time take various ways to collect some "nail households" who are difficult to collect water charges, so as to improve the recovery of water charges to some extent.
6, gas management departments to strengthen supervision, put an end to gas safety accidents. In March this year, in order to avoid lightning disasters and curb illegal transportation in thunderstorm season, a gas monitoring team was established with the approval of the district gas safety management leading group, and a monitoring coordinator was hired to conduct safety inspections at various liquefied gas stations by means of regular and irregular inspections and spot checks. * * * Detect 400 expired steel cylinders, investigate and deal with charging twice at night and illegal transportation twice. At the same time, more than 300 gas cylinders were forcibly cleaned, and more than 0/00 unqualified gas cylinders were forcibly discarded. In cooperation with Tong Yuan Township Government, a bottled supply point was planned in Tong Yuan Township, which effectively curbed the hidden dangers caused by the chaotic gas operation in this area.
Four, continue to further rectify and standardize the order of the construction market, and further standardize the construction market management and comprehensive development industry.
In the past six months, our bureau has paid close attention to the construction management of the whole region in accordance with the requirements of provincial and municipal construction work conferences. In the past six months, the total construction output value undertaken by the whole region was 230 million yuan, and the construction and installation output value was 65.438+0.3 billion yuan. Mainly do the following work: First, continue to carry out in-depth rectification and standardization of the order of the construction market, and standardize the behavior of construction units and construction units according to law. It has organized four large-scale dragnet inspections, issued 57 general rectification notices, * * * found 36 illegal houses, issued 9 rectification notices for suspension of work, fined four projects with inadequate safety measures and illegal use of unsafe construction machinery, and eliminated hidden dangers of accidents in the bud in time. The second is to seriously clean up the arrears of construction funds and wages of migrant workers in the construction field. According to the unified arrangement of the district government, in conjunction with the district discipline inspection and procuratorate, all units that report the wages of migrant workers who are in arrears with the project payment are investigated, and the defaulting units are urged to make repayment plans. Among them, seven construction units have made repayment plans, totaling 5,539,300 yuan, effectively safeguarding the legitimate rights and interests of all construction enterprises and migrant workers. Third, the annual online qualification inspection was conducted for all construction enterprises in the region. All the construction enterprises in the whole region 18 carried out annual inspection, and the annual inspection rate was 100%. Earnestly do a good job of online declaration, and the quarterly statistical reports of all construction enterprises are timely and accurate. The fourth is to strictly control the quality and safety of engineering construction, strengthen engineering supervision and ensure the quality of engineering construction. * * * There are 1 1 new projects in the whole region, with a construction area of 123 10000 square meters and a total cost of 7 1 12000 yuan.
18 projects were completed and accepted, 16 projects passed the first acceptance, and the other two projects passed the re-inspection after rectification. There are 1 1 projects that have gone through the completion filing procedures, and 1 projects have not been handled due to serious violations of the law. Fifth, strictly follow the principles of openness, fairness and justice, and do a good job in bidding. * * * Accepted 8 bidding projects, and completed 4 public bidding projects, with the winning bid amount of more than 5.3 million yuan; 2 public bidding projects with an amount of 930,000 yuan; 2 open tender preparation projects with an amount of 600,000 yuan; The qualified rate of public bidding reaches 100%. Sixth, actively participate in on-the-job training in the construction industry, such as sending construction, safety, budget and accounting personnel to participate in professional training courses organized by the municipal competent department, which greatly improved the quality of construction professional and technical personnel. Seventh, strengthen the management of architectural design, actively introduce design works with unique designs and novel ideas from other provinces, and design good works in line with the urban construction and development of our region, greatly improving the urban taste of our region, completing the design task of 98,000 square meters with an output value of 420,000 yuan.
Six, conscientiously do a good job in attracting investment, optimize the soft environment for attracting investment.
Our bureau continues to focus on attracting investment. At the beginning of the year, according to the task of attracting investment issued by the district committee and government, the party and government team of this bureau issued document (2004) No.27, formulated the work arrangement of this year's investment attraction of this bureau, and set up a leading group for attracting investment. In order to ensure the completion of the task, our bureau decomposed the task of attracting investment of 72 million yuan issued by the district government into each team member, and formulated practical measures: First, strengthen the follow-up service. All the projects introduced by our bureau have signed a tracking service agreement, providing full tracking service, making good contact and coordination, and solving customers' worries. The second is to strengthen reward and punishment measures. The main party and government leaders of the bureau's party and government leading bodies and subordinate units have paid a certain amount of deposit. If the year-end assessment fails to complete the task, the deposit will become a fine and informed criticism will be given. Where the introduction of investment projects units or individuals, according to the corresponding proportion of reward. From 1 to June this year, the actual investment of our bureau reached 10.2 million yuan. Newly signed contract project 1 unit, contract fund160,000 yuan.
Seven, earnestly do a good job in party building and spiritual civilization construction, and promote the development of urban construction.
Our bureau focuses on strengthening the party's ideological construction, organizational construction, work style construction and party style and clean government construction. 1, strengthen the party Committee's own construction. Adhere to the study system of the Central Group of the Party Committee, and actively carry out the study of the spirit of the 16th National Congress and the "Theory of Three Represents" theory. Earnestly study the new Constitution of China Producers' Party, and formulate practical rules of procedure for Party committee meetings and the system of leading cadres' heart-to-heart talks. In accordance with the requirements of the district committee, we should take the establishment of the red flag unit as the breakthrough of the whole system and do a good job in the "three innovations" 3. The investment in the formulation and implementation of various systems is 1.2 million yuan. The standard is high and the content is complete. Improve the equipment of amateur party school, purchase 24 tables, 40 stools and 8 chairs, replace the equipment of party member audio-visual classroom, and purchase a set of TV, VCD and stereo. 3, strengthen organizational construction, in strict accordance with the "Regulations on the Selection and Appointment of Cadres in party member", improve the personnel adjustment of each branch, fully equip and strengthen the members of the branch team, so that the branch has greater cohesion and truly play a fortress role. 4. Do a good job in the development of party member, designate special personnel to train, care for and help the progressive young people in the whole system, guide them to actively move closer to the party organization, and send them to the party school to study in an organized way. In the first half of this year, * * * 4 people prepared to become full members of party member and 35 activists joined the Party. 5. Strengthen education in party member. In accordance with the requirements of the district committee, we have thoroughly studied the advanced education in party member. Actively carry out the spirit of the 16th National Congress of the Communist Party of China and study and education activities in Theory of Three Represents. Every party member wrote in-depth study experience and reading notes. 6. Pay special attention to the work of the retirement branch. The Party Committee has always been concerned about the health and living conditions of veteran comrades and strongly supported the retired branch in terms of funds. They often organize visits to frail old party member and old comrades. On the eve of July 1st, the Party Committee expressed condolences to the old party member and held a forum for the old party member. 7. Effectively change the work style. Improve the attendance system, management system and financial system, implement the system of making government affairs public, and advocate "three quicks and one improvement", that is, quick handling, quick approval and quick implementation, so as to improve work efficiency. Solve the problem of "the door is difficult to enter, the face is ugly, and things are difficult to do".
At the same time, the safe production of fireworks and firecrackers, poverty alleviation in rural areas and the "Fourth Five-Year Plan" were successfully completed, and the proposals of NPC deputies and CPPCC members were properly handled. NPC deputies and CPPCC members expressed satisfaction with the urban construction work.
Work plan for the second half of the year
According to the thinking of urban construction work, in order to ensure the full completion of the annual work tasks, the work plan for the second half of the year is formulated as follows:
First, the city investment company is the main body to operate the city and actively raise funds to build Linchuan.
(1) Complete the first phase project of Shangdundu old city reconstruction, and comprehensively carry out the second phase project of old city reconstruction.
1, Shangdundu Old City Reconstruction Phase I Project: Demolition of two dormitories of Cotton and Hemp Company and three dormitories of Party School was completed at the end of July. Accelerate the auction of Qiaotou 1377.5㎡ plot and north of Jianshe Road 1344㎡ plot, and withdraw funds as soon as possible. During the year, the pavement construction of the main lane of Zhongxing Road was completed, and the filling project of Binjiang Park was completed, forming the prototype of the park.
2. The second phase of the old city reconstruction project: the demolition along Zhongxing Road in Block B will be completed before 10; Accelerate the land requisition approval procedures, and start construction of the first phase of 1 1,000 ㎡ affordable housing during the year.
(two) to speed up the construction of Yu Ming Garden housing project.
The 50,000 ㎡ residential building in the first phase of the third phase of the project started construction in June and July, and was basically completed years ago.
2. Continue to do a good job in the sales of houses, storefronts and wooden houses left over from the first and second phases, increase the promotion of the third phase, strive for the pre-sale of some houses during the year, and withdraw some funds to pay for the project.
3. Strengthen the responsibility system of property management personnel, increase the collection of property management fees, improve the quality of service personnel, create a good image of the enterprise, and lay a good foundation for the third phase of sales.
Second, continue to strengthen urban planning management.
1. complete the adjustment of Hu Meng planning scheme and the compilation of the regulatory detailed planning of 3.2 square kilometers around Hu Meng;
2. Complete the detailed planning for the relocation and resettlement of the new administrative region;
3. Complete the overall planning of the two towns;
4. Carry out 1: 1000 topographic mapping of 74 square kilometers south of the new administrative region;
5. Complete the landscape planning and design on both sides of a river.
Three, pay close attention to the introduction of new investment projects, the full implementation of open urban construction and investment strategy.
In the second half of the year, while consolidating the investment promotion achievements in the first half of the year, our bureau will further optimize the investment promotion environment, increase investment promotion efforts, give full play to the advantages of the construction system, strive to improve the service quality, establish an investment promotion incentive mechanism, and strive to introduce three new projects while serving the old projects, so as to ensure that our investment promotion task is fully completed.
Four, continue to vigorously rectify the construction market, pay close attention to the management of the construction industry.
1, set up a joint inspection team, led by the District Construction Management Office, and collect it together with the urban management brigade and the planning and construction management station to check and rectify the above-mentioned illegal housing units and individuals. Investigate all kinds of township construction projects and urge them to go through relevant procedures.
2. Cooperate with the relevant charging departments under the Bureau to charge in strict accordance with the charging standards. Without the bureau's research, the fees shall not be reduced or exempted.
3. Continue to intensify inspections, strengthen the supervision of construction projects in Fubei Industrial Park, and bring all construction projects in the region under normal supervision.
4. Strengthen the supervision of construction safety production, strive to control the accident rate and casualty rate of construction safety production in the whole year within the target set at the beginning of the year, and resolutely put an end to major safety accidents above level 3.
5, the transformation of material testing equipment and increase the input of material testing equipment, broaden the testing scope of building materials, and ensure that high-quality building materials are put into engineering construction.
Five, continue to increase investment in urban infrastructure, strengthen urban management, to ensure the completion of the work.
1, municipal management: complete the dredging of main sewers in urban areas and the normal maintenance of street municipal facilities; Cooperate with Wuhua Office in the district to complete the newly installed street lamp project in Hexi; Continue to do a good job in the transformation of municipal companies or sign foreign cooperation agreements; Apply for the purchase of a street lamp engineering vehicle.
2. Garden management: Watering, spraying, budding, pruning and maintaining all green belt seedlings and street trees in urban areas; Complete the greening of the surrounding environment of Wenta, and build the distribution room, management room and toilet of Wenta; Do a good job in Fu Lin Road Green Belt Reconstruction Project; Comprehensively rectify the interior of the park.
3. Sanitation management: further strengthen the supervision of city appearance and sanitation and the management of street cleaning and cleaning operations to ensure the city appearance and environmental sanitation to a new level. Build a closed garbage transfer station on Wenchang Avenue (Xinjiakou to the middle section of overpass) to facilitate the transfer of surrounding garbage; Buy a garbage truck to solve the problem of garbage transportation.
4. Urban water supply management: standardize procedures and standards, improve the restraint mechanism, plug loopholes in work and management, lay a solid foundation for increasing income, increase the intensity of running projects and funds, and ensure that the national debt funds for the 30,000-ton/day water supply project and the funds for pipe network transformation are in place. Improve the water supply conditions, do a good job in the pipe network reconstruction project in the second half of this year and expand the leakage of some supervisors, expand the scope of water supply and increase the pressure of water supply. Do a good job in the construction of the first phase of 30,000 tons/day water supply project, ensure the quality and progress of the water intake, the first-class pumping station and the mud-water pipe network crossing the river, and ensure the safety of construction personnel; Do a good job in the preparatory work before the start of the second phase of the 30,000-ton/day water supply project, and strive to start construction in the second half of the year.
5. Gas management: For overdue gas cylinders and unqualified gas cylinders, in accordance with the relevant provisions of the gas cylinder remediation plan in Linchuan District, jointly enforce the law with the quality supervision department, and fully implement gas cylinder storage and property rights transfer. For towns and villages with outstanding problems such as illegal filling, transportation and disorderly setting of supply points, in accordance with the spirit of provincial and district safety production conferences and in accordance with relevant regulations, functional monitoring is implemented with the territorial management of towns and villages as the starting point. Improve the safety awareness of gas station owners, overcome paralysis and luck, and urge the replacement of all the wearing parts of gas station equipment.
Sixth, earnestly do a good job in party building and spiritual civilization construction.
Pay attention to strengthening the party's ideological construction, organizational construction, work style construction and party style and clean government construction. Pay close attention to the rectification of the work style of the organs and establish a good image of the organs. Strengthen the study system of the Party Committee Central Group and the weekly political study system, and focus on studying the spirit of the 16th National Congress of the Communist Party of China and the Third Plenary Session of the 16th Central Committee. Strengthen the construction of grass-roots party organizations, actively carry out "three innovations" activities, and do a good job in the development of party member in accordance with party member's "16-character" policy. According to the requirements of the Party organizations at higher levels, party member's advanced education should be carried out throughout the system. Combined with the characteristics of urban construction industry, actively promote civilized construction. Adhere to the principle of "grasping with both hands and being hard with both hands" and conscientiously do a good job in the systematic and socialized construction of family planning.
Governance work.
Linchuan district construction bureau
;
- Previous article:Natural Resources in Jilatu Township
- Next article:What race is China?
- Related articles
- I come from Myanmar. Can I immigrate to China?
- What are the possible risks of high returns?
- Why is Qin 'an County in Tianshui also called ancient Ji Cheng?
- Go to the immigration office to do immigration and make a zodiac sign.
- As the last monarch of South Korea, why was Wang Han 'an captured?
- How many people immigrate to China every year? What is the number of immigrants in these years? Which countries do you immigrate to? Is there any official data on the number of people?
- The Program Features of Happy Cube
- Which should I choose, the opportunity to study abroad or the opportunity to do sales?
- What is the Filipino population of Israel?
- Which city is Gaowei Village located in?