Commencement time of Bati Power Station

Construction started in March, 20021year.

Bati Hydropower Station started construction in March, 2002 1 year, and was closed in May, 20221day. Bati Hydropower Station is located in the upper reaches of Dadu River, and the dam site is located in the upper reaches of Luotuogou 1000m, which spans Jinchuan County of Aba Prefecture and Danba County of Ganzi Prefecture, with an upper distance of about 62km and a lower distance of 3 1km from Danba County.

Bati Hydropower Station is the 8th (2nd) level power station in the 22-level development scheme of three reservoirs recommended in the Report on Hydropower Planning Adjustment of Dadu River in Sichuan Province approved by the General Office of Sichuan Provincial Government in 2003, with Anning Hydropower Station in the upstream and Danba Hydropower Station in the downstream.