The following information is needed to prepare the water and soil conservation plan:

1, feasibility study report, preliminary design scheme. Including the main technical standards of the main project.

As well as the construction scale, project area, earthwork balance, total project investment and soil

Construction investment and schedule arrangement (necessary information).

2. Plan, longitudinal section, typical cross-section and topographic map of the project area (1: 10000)

Construction drawing and 1:2000 circuit diagram with topography and elevation).

3. Geological exploration data along the line (address and brief description of hydrogeology), including geological structure characteristics.

Signs, formation lithology, soil types, groundwater reserves, etc.

4. Land use status and planning (map and description), water system map and description along the line,

Distribution and description of animals and plants.

5. Put forward the spoil plan, the transportation distance of the spoil ground to be taken and taken, and the stage.

Agreement (contract) signed by the customs for borrowing and abandoning soil.

6. Owner information, including:

(1) owner's full name and zip code;

(two) the name of the legal representative, the contact person and his telephone, fax and e-mail address;

(3) the construction unit engineering qualification certificate (necessary information)

7, water and soil conservation plan power of attorney (necessary information). Two certificates of project establishment documents and planning

A book. Earthwork procurement contract.

Compilation of soil and water conservation plan