Job Recruitment Website - Immigration policy - When did Tongjiang Reservoir in Zhongjiang County start construction?
When did Tongjiang Reservoir in Zhongjiang County start construction?
1, 5.7 kilometers away from Tongjiang county, is a large reservoir with flood control as its main function and water supply and hydropower generation as its consideration. The basin control area is 1807 square kilometers, adjacent to Shi Niu Zui New District, and the 20 1 provincial highway can directly reach the dam site area.
2. The total storage capacity of the whole reservoir is 65.438+0.47 billion cubic meters, and the annual water supply is 3.65438+0.05 million cubic meters.
3. The axis of the dam crest is 508.5 meters long, the maximum dam height is 74 meters, the installed capacity of the power station is 20 MW, and the annual power generation is 56.09 million kWh. After put into use, it will solve the water problem of 300 thousand people in the county.
- Related articles
- Other information of Miao surname
- What is the specific difference between IELTS and TOEFL?
- I am an international student. Can I buy a house in Canada?
- Which department is in charge of American prisons?
- What does Zhoushan say?
- Huantou immigration software
- What are the village committees under the jurisdiction of Dakeng Township, Suichuan County, Ji'an City, Jiangxi Province?
- Japan's new immigration regulations require a five-year tax payment certificate to apply for permanent residence.
- Canadian immigration agencies ranking?
- Three revolutions of capitalism (world history)