What are the requirements for diatom mud construction? Introduction of Diatom Mud Construction Requirements

Diatom mud is a new decoration material. Many home improvement customers and construction teams who have never used diatom mud are unfamiliar with diatom mud construction, which is likely to reduce the decoration effect. Diatom mud construction has many requirements for walls, so what are the requirements for diatom mud construction? Next, the construction requirements of diatom mud are introduced for your reference.

What are the requirements for diatom mud construction?

Diatom mud construction requirements 1, diatom mud preparation before construction:

(1) technical preparation: work out the construction scheme of diatom mud on the wall and make a written technical disclosure to the workers.

(2) Material preparation: Diatom mud that meets the design requirements should have product certificate, test report and environmental protection indicators that meet the relevant national standards, shelf life and product certificate, and the variety and color should meet the design requirements.

(3) Tool preparation: agitator and bucket (at least two, mixing bucket and water receiving bucket); Foam and spatula (dust removal and lighting); Scraper, small brush, small shovel and towel (at least two); Ladders, multi-tooth tools; Bark stick, tape measure (7500mm); Infrared measuring instrument (large area measurement); Indoor air formaldehyde detector; Special plastic film overalls, shoe covers, textured paper (imported for modeling and domestic corner protection), etc. If there are construction patterns, you need to bring air compressors, paints, connecting wires and other related tools and equipment.

(4) Personnel preparation: Operators should wear corresponding labor protection facilities during painting.

Diatom mud construction requirements II. Diatom mud wall construction requirements:

(1) Ensure that the base surface is smooth, dense and clean, and the angles of Yin and Yang and lines are horizontal and vertical, and it is forbidden to construct frozen seepage walls;

(2) All plastering operations are completed. Pipes, holes and angles of yin and yang that pass through walls shall be plastered, leveled, rested and fully dried in advance. Please handle the crack position of the wall in advance.

(3) Kick the concrete lintel, beam pad, ring beam, concrete column and the protruding part on the beam surface flat. The holes of feet, hands, eyes and waste gas should be tightly blocked, the exposed steel bar heads, lead wire heads and wood should be eliminated and treated with rust prevention, the windowsill bricks should be filled, and the junction of walls and floors and beams should be filled with inclined bricks.

(4) The basement with empty drum or crack should be pretreated, and the basement should be brushed with putty twice after cleaning.

Diatom mud construction requirements 3. Environmental requirements for algae mud construction:

(1) The wall temperature is above 5℃, the relative humidity of air is not more than 80%, and the construction is rigorous in rainy days;

(2) Within 24 hours after construction, the ambient temperature and wall temperature of the construction site shall not be lower than 5℃, and the wind force shall not be greater than 5 during construction. When the temperature is lower than +5℃, the construction shall be stopped;

(3) When the temperature is above 36℃ in summer, no construction is allowed. If construction is needed, shading measures should be taken to avoid direct sunlight;

(4) Not suitable for construction in rainy days. If construction is needed, it should be covered with tarpaulin for protection.

These are the requirements for diatom mud construction brought by Bian Xiao. All contents of diatom mud construction requirements.