Measures of Anhui Province for Resettlement of Land Requisition for Water Conservancy and Hydropower Projects

Article 1 In order to make rational use of land resources, ensure the construction land for water conservancy and hydropower projects and properly resettle immigrants, these Measures are formulated in accordance with the Regulations on Land Requisition for National Construction and the Measures for the Implementation of Land Requisition for National Construction in Anhui Province. Article 2 Water conservancy and hydropower projects are facilities to improve agricultural production conditions and serve agricultural production. All water conservancy and hydropower projects, including the construction of flood storage and detention areas, should be planned, designed and constructed in accordance with the principle of land conservation and rational utilization. And go through the land acquisition procedures in accordance with the procedures prescribed by the state. Unauthorized occupation and abuse of land is strictly prohibited. Third large and medium-sized water conservancy and hydropower projects, involving land occupation and resettlement, must carefully prepare the resettlement plan, put forward the number of land occupation, housing demolition and resettlement population, resettlement ideas, resettlement costs calculation and so on. , as an integral part of the project design task book, and submitted for approval in accordance with the basic construction procedures. After the design task book is approved, the relevant local people's governments shall organize engineering design units to verify the physical quantity of land-expropriated immigrants, and formulate feasible resettlement plans according to local resources and economic conditions. Article 4 Resettlement of migrants shall be based on the advantages of utilizing local resources and hydropower construction, diversified management, developing township enterprises and various services, ensuring that the living standard of migrants is not lower than that before relocation, and supporting migrants to gradually become rich.

The main ways to resettle immigrants are:

(1) Relocation;

(2) Resettlement in the beneficiary areas;

(three) conditional reclamation, after approval, reclamation of wasteland, wasteland resettlement. Fifth residents relocation and resettlement by the relevant local people's government, the project construction unit shall closely cooperate. Cities and counties with a large number of resettlement should set up necessary specialized agencies.

The water conservancy and hydropower construction unit shall sign an agreement with the local people's government that undertakes the resettlement task according to the approved resettlement plan and scheme, and the local people's government shall ensure that the resettlement task of land acquisition is completed on schedule, and the water conservancy and hydropower construction unit shall timely allocate funds and materials to the resettlement department for one-time use. Article 6 The state shall pay land acquisition fees for the following water conservancy and hydropower projects:

(1) Large and medium-sized reservoirs, large and medium-sized culverts and electromechanical irrigation and drainage stations;

(2) Irrigation channels with an irrigation area of more than 20,000 mu in mountainous areas in southern Anhui and Dabie Mountains, and an irrigation area of more than 50,000 mu in other areas;

(3) River regulation in hilly areas with a watershed area of over 150 square kilometers and other areas with a watershed area of over 300 square kilometers;

(4) Small hydropower stations with a capacity of more than 500 kilowatts.

Other water conservancy and hydropower projects, by the land units or beneficiary units responsible for solving or bearing the cost of land acquisition. Article 7 Land compensation fee

The compensation standard for cultivated land is four to five times its annual output value, and the annual output value of Chashan, Tongshan, Mulberry Garden, Orchard and Vegetable Field is five times. The annual output value is calculated according to the average annual output of the three years before the county approves the requisition and the current price stipulated by the state. Fish ponds, lotus ponds, weitang, lingtang, linshan, xinshan, caoshan, medicinal herbs and homestead with logging tasks shall be compensated according to the standard of cultivated land.

For irrigation ponds, ditches and water conservancy facilities, if land is not requisitioned after occupation, and irrigation and drainage will not be affected, no compensation will be given; If it does have an impact, the construction unit shall build corresponding projects or give appropriate economic compensation. All state-owned barren hills, wasteland, beaches and state-owned land used by other units, as well as barren hills, ponds, beaches and open spaces reclaimed within three years, will not be paid land compensation fees. Eighth young crops (seedlings) compensation fee

Compensation standard for oil, grain, vegetables and other crops: 25-40 yuan per mu at seedling stage, approaching maturity. In principle, if construction is really necessary after harvest, compensation shall be made according to the actual output value of crops in the current season. Economic crops such as tobacco, hemp, lotus root, water chestnut, fennel, medicinal materials, cotton, etc., which can be harvested, will not be compensated, and those that cannot be harvested will be compensated according to the output value of crops in the current season.

Compensation for fry: if the fish has been stocked for more than two years, it will be caught by the fish owner without additional compensation; Less than two years, according to the compensation of two times the fry fee.

Forest compensation: timber forest is cut down by forest owners. If the average trunk diameter exceeds 20 cm, compensation shall be made at 10% to 20% of the actual volume value. If the average trunk diameter is less than 20 cm and more than 5 cm, it will be compensated according to 50% to 80% of the actual volume value. Young trees and bamboo forests that cannot be cut down shall be compensated by the county (city). Article 9 Housing compensation fee

The houses on the expropriated land shall be compensated according to the original quality. The compensation standard for houses with earth walls and grass roofs and semi-brick structures is fifteen to twenty yuan per square meter. Brick-wall and tile-roofed houses are 20 square meters to 25 yuan, and the attic 1.8 meters high. According to the construction area, if the height exceeds 1 less than 0.5m10.8m, it will be converted by 30%, and if the height exceeds1less than 0/0.5m, it will be converted by 20%. The public houses of state organs, schools, enterprises and institutions are still compensated according to the original scale and standard. Article 10 Other compensation expenses

Cowshed, pigsty, toilet, septic tank, stove, etc. , compensation of five to forty yuan each time. Earth wells, stone wells, brick wells, the depth of less than five meters, each eye compensation of fifty to two hundred yuan; If the depth of the well exceeds five meters, it will be compensated according to the local cost standard, and the compensation for each brick kiln will be fifty to five hundred yuan. Waste wells and kilns have not been replenished. General graves, each compensation of ten to fifteen yuan, martyrs' tombs can be properly taken care of.

Temporary occupation of cultivated land for construction shall be compensated quarterly according to the output value of the cultivated land in the current year. Temporary occupation period shall not exceed three years.