What is the content of project pre-acceptance?

Project pre-acceptance: 1. Complete the engineering design drawings and all the construction contents agreed in the contract, and clean the building within 2 meters, so that the housing project has bright windows, clean ground, bright lights and water supply; Buildings should be clean and hygienic. Two, the construction unit should improve the relevant infrastructure procedures (including construction project planning permit, safety, quality supervision procedures, construction permit). Three, the project completion technical files (including supervision data) and completion drawings, in accordance with the provisions of the content and order of binding. 4. The quality guarantee has been signed. Five, the other to the quality supervision station to send the following information 1 copy, and bound. 1, in-volume directory; 2, the construction site quality management inspection records; 3, inspection quality acceptance record; 4, division (a branch) engineering quality acceptance records; 5, the unit (child) project quality completion acceptance record (volume directory to play first, provide after acceptance); 6, unit (child) engineering quality control data verification records (1), (2); 7, unit (child) engineering safety and function inspection data verification and main function spot check records; 8, unit (child) engineering visual quality inspection records; 9, engineering quality assurance system review table; 10, project completion report;

1 1, construction summary of the construction unit; 12, supervision summary of supervision unit; 13, project quality evaluation report of supervision unit; 14, quality inspection report of survey documents of the survey unit; 15, quality inspection report of design documents and design changes of the design unit; 16, the construction unit single subdivisional work contract statistics; 17, final statement of the project; 18, the person in charge of project management (the project legal person of the construction unit, the site representative, the project manager of the construction unit, the technical director, the builder, the quality inspector, the material engineer, the general supervisor of the supervision unit and the site supervisor) witnessed the responsibility of the sampler; 19, quality supervision and audit (nuclear) inspection opinions; 20. Construction permit; 2 1, planning acceptance certificate; 22, fire acceptance certificate; 23, lightning protection testing certificate; 24, immigration capital construction projects must provide "review opinions" before acceptance; 25, the construction unit issued by the "housing instructions", "housing engineering quality guarantee" signed for the record. 26, project completion acceptance opinions.