How long will it take for the reservoir to start construction?

Generally speaking, the basic construction procedures for new reservoir projects within one and a half years mainly include the following aspects:

1. Project proposal stage (medium and above reservoirs only): Prepare the project proposal and complete the land survey and demarcation report at the same time.

2. Feasibility study report: At the same time, water resources demonstration report, soil and water conservation plan report, land pre-examination document, special report on land requisition and resettlement, environmental impact assessment report and forest land use report have been compiled;

Three. Preliminary design report stage: all special reports in the feasibility study stage must be approved before the preliminary design report review. After the preliminary design is approved, the project can start construction.