Measures of Chongqing Municipality on the Administration of Resettlement Archives in the Three Gorges Reservoir Area

Chapter I General Provisions

1. Relevant immigration policies, regulations, rules, normative documents and other documents formulated and issued by people's congresses, governments and immigration departments at or above the county (city) level.

upper

This level is long and short.

2 documents and materials related to the publicity and education of immigration work

upper

There are short and long at this level.

3. Important speeches and documents made by leaders at or above the county (city) level to inspect and inspect the immigration work are timeless.

4 city, county (city) people's government to develop and approve the resettlement planning outline, county (city) resettlement planning, implementation plan, etc.

Municipal level

The county (city) level will grow forever.

5. Submerged physical questionnaires, statistical tables and summary tables (including counties (cities), market towns, rural and urban residents) shall be permanently preserved.

6 city and county (city) comprehensive investigation, planning, planning, summary, statistics and reporting materials.

Yongchang

7. The comprehensive survey layout, planning, planning, summary and statistical report materials of all departments and units are short-lived.

8 city, county (city) comprehensive meeting minutes, minutes, documents and other materials are always relatively short.

9. Minutes of meetings of various departments and units related to immigration work are short and long.

10. Introduction, information, etc.

Issued by the superior

Short and pithy printed and distributed at this level.

1 1. Proposals and motions related to immigration work and the materials they handle are relatively long.

12. The documents of household registration management, cleaning and urbanization in reservoir area are short-lived.

13. disaster investigation report, disaster reduction and relief documents and statistical data of resettlement project in reservoir area.

important

Generally, the length is relatively short

14. Long documents and materials such as summary, report, acceptance and carry-over of the pilot work of reservoir resettlement.

15. The materials such as counterpart support inspection, mutual visits and information exchange and cooperation agreements for immigrants in the reservoir area are long.

16. the documents of the poverty alleviation work of the immigration bureau are very long.

17. Special work for non-immigrants issued by departments at or above the county (city) but with long policy documents to be implemented.

18. Documents and materials such as immigration file management system, regulations and methods issued by departments at or above the county (city). long

19. Investigation materials on illegal cases in resettlement, compensation and demolition (demolition).

The length of reporting materials on violations of discipline and law in immigration work is always short.

20. Establishment of immigration agencies, appointment and removal of personnel, preparation of documents and materials, and resettlement compensation.

1. Documents and materials such as flooded area, population, flooded loss in rural areas of the whole region or county (city) shall be permanently preserved.

2. The original appearance, original site layout and topographic map of flooded townships, towns and villages will last forever.

3. The documents such as water and soil conservation planning, plan, implementation plan, effect and summary of flooded villages and towns shall be kept permanently.

4. The questionnaires and registration forms of various materials such as the property, housing area, land cultivation, economic status, various incomes, family population and its structure of immigrant households and immigrant units will be permanently preserved.

5 rural immigrants, town relocation pilot, planning, implementation measures, effects, regional layout and other documents and materials.

The whole region or county (city)

The length of each township.

6 rural resettlement, follow-up investigation, handling of remaining problems, dispute investigation, resettlement construction and other documents and materials shall be permanently preserved.

7. Receiving reports, plans, preferential policies, resettlement methods and other documents of immigrants, and resettlement contracts and agreements.

be approved for enforcement

Not approved for implementation

Work replaces eating, and documents and materials are always long and long.

8. The original site of the old county (city), the original topographic map, the survey, investigation, statistics, loss, calculation and other documents are eternal.

9 old city water, electricity, gas, posts and telecommunications, communications, roads, radio and television, cultural relics, environmental protection, public facilities and other surveys, statistical data and drawings, charts and other permanent preservation.

10. Documents such as site selection, evaluation, demonstration, urban geology, landform, area, population, scale, construction and relocation planning of the new town will be permanently preserved.

1 1. The layout, master plan, detailed plan, design, implementation plan, plan and other documents of the new city are eternal.

12. Documents and materials such as compensation for land acquisition and demolition in the new urban area will be permanently preserved.

13. Documents, drawings, charts, etc. It is used for the construction of roads, bridges and culverts, various pipelines, power transmission and transformation, posts and telecommunications, radio and television, cultural relics and public facilities. In the new urban area (including the planned development area).

Design documents and drawings

As-built drawings and completion acceptance documents

Other materials being implemented are short-term, short-term and long-term. Three. project construction

1. Land development planning, scheme, construction and implementation of land development projects, management documents and materials will be kept permanently.

2 agricultural, animal husbandry and forestry development projects planning, evaluation, demonstration, implementation plan, scheme, benefit analysis, follow-up investigation, statistics and other documents and materials.

The whole region or county (city), comprehensive

The development and construction of specific projects will be endless.

3. Water, electricity, roads, gardens, supporting construction, immigrant village construction, etc.

4 township enterprises technical transformation, relocation planning evaluation, demonstration, implementation plan, investment plan, construction scale, completion acceptance and other documents and drawings.

5. The relocation documents such as transportation, water, electricity, gas, posts and telecommunications, radio and television, cultural relics, temples, environmental protection, and library bottom cleaning will last forever.

6 agricultural investment project completion acceptance documents and drawings are permanent.

7 factory inundation survey indicators, project feasibility study approval documents, asset evaluation, compensation procedures, etc.

8. The proposal and reply, feasibility study report, project evaluation, environmental prediction investigation report, design task book, plan task book and other documents and materials of industrial and other investment projects shall be kept permanently.

9. Urban relocation infrastructure projects, design and approval documents, floor plans, documents and materials for completion acceptance and delivery, engineering geology, hydrogeology, survey design, survey reports, geological maps, survey records, laboratory test reports, important geotechnical samples and descriptions, topography, landforms, hydrology, meteorology and other permanent design basic materials.

10. Design documents and materials such as overall planning and design, preliminary design, technical design, design evaluation, appraisal and approval are permanent.

1 1. Land requisition approval documents and red line drawings, demolition, compensation agreements, contracts and other project management documents and materials shall be kept permanently.

12. Completion acceptance documents such as completion drawings, completion acceptance reports, acceptance meeting documents, acceptance conclusions, and signature forms of inspectors are long.