Self-inspection report on flood control and typhoon prevention

Self-inspection report on flood control and typhoon prevention (selected 10)

Busy and substantial work has come to an end under the urging of time. Looking back on the work during this period, we have made achievements, but there are also problems. Let's learn to write a self-inspection report together. Are you still worried about writing the self-inspection report? The following is the self-inspection report on flood control and typhoon prevention (selected 10) collected by me for your reference, hoping to help friends in need.

Self-inspection Report on Flood Control and Typhoon Prevention 1 I. Pre-flood inspection

Recently, my township has organized cadres and workers, village cadres and some people in the township to strictly investigate the hidden dangers of flood control safety within its jurisdiction, focusing on the hidden dangers of geological disasters, low-lying areas and dangerous houses in villages in the township to ensure that no dead ends are left in the investigation and flood control work is effectively carried out. After investigation, it is found that the existing problems mainly include:

One is the hidden danger points of geological disasters in xxxx Village, xxxx Village, Feng Jinyuan and Liumingguan Houshan; Second, the low-lying areas such as Napotun in Kongliao Village;

The third is the dangerous houses identified by villages.

Second, the existing problems

(1) During the typhoon, sometimes communication is interrupted and there is no signal on the mobile phone.

(two) after investigation, there are a certain number of dangerous houses in each administrative village, but due to economic conditions, rural dangerous house renovation quota and other factors, some rural dangerous houses can not be rectified immediately.

(3) Some people have a weak concept of self-help in flood control and drought relief, always waiting for help and lacking initiative; Some cadres have a low awareness of risk prevention.

Third, the next step of work measures

In view of the above problems, we will strengthen our work in the following aspects:

(1) unify thoughts and raise awareness. Firmly establish the ideological preparation for flood control, enhance the sense of responsibility and mission, overcome the fluky psychology, and really do a good job in preparing for drought and flood control ideologically, organizationally and practically.

(2) Strengthen leadership and implement responsibilities. Full implementation of the chief executive responsibility system, timely adjustment of township flood control and drought relief headquarters leadership, responsible for organizing leadership, supervision and inspection, command and coordination of the township flood control work. At the same time, the township flood control teams and personnel have been adjusted and enriched, the emergency material reserve has been implemented, and the manpower, material resources and financial resources needed for flood control and drought relief work have been ensured.

(3) Give priority to prevention and make good plans for flood control. In order to ensure the safety of flood season and reduce the loss of flood disaster, the emergency plan for flood control in xxxxX township was formulated, and the emergency detachment for flood control in XXXXX township was enriched and adjusted to ensure effective dispatching, complete personnel, funds and materials, minimize the loss of personnel and ensure the safety of people's lives and property.

(4) Make arrangements for duty and communicate information in time. In order to ensure the timely transmission of flood control information, a 24-hour duty system has been implemented in the flood season, and each round of duty is led by the duty leader, requiring the duty personnel to stick to their posts and not to leave their posts without authorization. Closely monitor water conditions, rain conditions, disasters and weather conditions, and report the disasters as soon as possible. When the disaster happens, evacuate and resettle the victims immediately.

(five) to further enrich the material reserves, and earnestly plan ahead. Strengthen the docking with the county civil affairs bureau, further enrich disaster prevention and relief materials, and lay a solid foundation for flood control work.

(6) Do a good job in rectifying existing problems. First, increase the relay with the county land and resources bureau, strive for financial support from higher authorities, and do a good job in rectifying hidden dangers of geological disasters. The second is to increase communication with the county housing and construction bureau, strive for more places for the renovation of rural dangerous houses, and solve the problem of rural dangerous houses. The third is to increase publicity and raise people's awareness of disaster prevention and relief. The fourth is to prepare for communication emergency. According to past experience, during the typhoon, not every telecom service provider's signal was interrupted, only a few were interrupted. Therefore, it is necessary to buy some mobile phone cards from China Telecom, China Mobile and China Unicom in advance, just in case they are unprepared.

In short, according to the inspection, our township has made early analysis of the situation, early investigation of hidden dangers, early formulation of plans, early implementation of measures, and early clarification of responsibilities, which has laid a solid foundation for the safety flood control work throughout the year.

Self-inspection report on flood control and typhoon prevention 2 1. Strengthen organizational leadership and enhance the sense of responsibility for flood control.

The leading group of this bureau attaches great importance to the flood control work, and according to the spirit of document Jinxunzhi [20xx] 1, a general meeting was held to deploy this year's flood control work. A leading group for flood control, headed by Zhang, was established to further strengthen the leadership of flood control organizations. Bureau leaders require the overall staff to work hard, overcome paralysis and luck, and effectively enhance the sense of responsibility and urgency of flood control work; All departments, brigades and squadrons strengthen coordination and cooperation, strictly implement the flood control responsibility system, and ensure the safety of people's lives and property and social stability.

Two, careful deployment, improve the emergency plan for flood control.

In accordance with the requirements of the document, the functional departments revised and improved the Emergency Plan for Municipal Flood Control in Jinchang City, Suzhou, further implemented the flood control responsibility system, and formed a work pattern that both performed their duties and cooperated closely. At the same time, an emergency commando team of 130 people with party member and League members as the core was set up to implement flood control measures according to the principle of "compartmentalization".

First, according to the degree and urgency of flood disasters and the functions of departments, two early warning levels, general (level II) and major (level I), were set from low to high. In case of emergency, corresponding to different warning levels, a corresponding number of commandos will be dispatched according to the emergency plan to be fully responsible for advertising investigation, road dredging, emergency rescue and disaster relief, and material supply. The overall personnel are required to attach great importance to it ideologically, deploy in advance in time, closely follow the water situation, and earnestly do all the preparatory work.

The second is to adhere to the flood control duty system. Strengthen the 24-hour duty, and require the personnel on duty to strictly abide by the duty system and make work records carefully. When there are abnormal weather conditions such as strong winds and heavy rains, members of the bureau's leading group will personally lead the team to be on duty and be ready to deal with all kinds of emergencies that may occur at any time. During the flood control period, all personnel are required to pay close attention to meteorological dynamics, keep abreast of information such as rain and water conditions, and take effective measures in accordance with the flood control plan to do the flood control work in detail.

The third is to strengthen road inspections, comprehensively inspect construction sites such as comprehensive improvement projects of urban streets and lanes and comprehensive renovation projects of old residential areas, intensify inspections of construction sites and outdoor advertising facilities in the jurisdiction, and eliminate all kinds of hidden dangers in time. The members of the leading group for flood control work of the bureau should conduct regular inspections to prevent deaths in key areas and ensure safety during the flood season.

Three, self-examination and self-correction, comprehensive investigation of flood control safety hazards within the jurisdiction.

In view of this year's flood control situation, while improving the emergency plan of Suzhou Jinchang City Appearance Municipal Administration Bureau, we generally took active actions and conducted a comprehensive investigation of outdoor advertisements within our jurisdiction. All law enforcement squadrons conduct pre-investigation on the dangerous damage of large outdoor advertisements, rooftop advertisements and shop signs within the squadron's jurisdiction, and require businesses to repair outdoor advertisements with potential safety hazards in time to eliminate potential safety hazards. At the same time, strengthen the supervision of material stacking, drainage and fence setting on the construction site, strengthen the safety inspection during the transformation of old streets and lanes, and put an end to water accumulation caused by various human factors.

Fourth, prepare for the battle, obtain materials and equipment, and ensure the safety during the flood season.

According to the requirements of the flood control headquarters in the control area, our bureau has audited all kinds of flood control materials. In addition to the original flood control materials such as raincoats, rain boots, radios, flashlights, nylon ropes, wires, etc., four water pumps, XX straw bags, 200 shovels and other emergency rescue tools stored in the Environmental Sanitation Institute are also integrated, which makes the flood control materials more reasonable and ensures the needs of flood control and emergency rescue work.

Self-inspection report on flood control and typhoon prevention 3 According to the spirit of the notice of xx Municipal Education Bureau on May 16, the school safety leading group made a detailed inspection of the school flood control work, and now the inspection situation is reported as follows:

First, the school has established an emergency plan for natural disaster relief, with a clear division of labor, which can be put in place quickly and carry out work; The emergency management system of school emergencies has been formulated, which provides a guarantee for effectively dealing with possible natural disasters in schools.

Second, seriously investigate the flood control work in and around the school:

1. The nearest school is Baisha River 100 meters, so the safety of the school will not be affected by the sudden river.

There is a mountain stream behind the school, which will flood in summer. In the summer vacation of 20xx, Zipingpu Town Government invested more than 600,000 yuan to build a flood control ditch around the school. After the baptism of 8. 13 and 8. 18 floods in 20xx, the safety of the school can be completely guaranteed, so that it is no longer threatened by floods.

The slope behind the school is about 20 meters high and the slope is about 30 degrees. The foot of the slope is about 20 meters from the school. It didn't crack in the 20xx 5. 12 earthquake, so the possibility of landslide is very small, and it is 20 meters away from the fence and will not pose a threat to the school.

The high ridge in front of the school is 8 meters away from the school wall. Gaoling is firm, without cracks and landslides, and the front of the school is safe. The left and right sides of the school are flat, so there will be no security risks.

The school roads are all built on solid and flat ground, far away from slopes and ridges, which is very safe.

Third, the school will adhere to the work policy of safety alarm, safety first and prevention first, insist on flood prevention safety education for teachers and students, make good preparations for flood prevention personnel and materials, keep a close eye on the weather and the 24-hour duty system, and immediately start the emergency plan for natural disasters in case of flood. At the same time, in order to ensure the safety of the school during the flood season, the school recently invited people to thoroughly clean up the school flood drainage ditch to ensure the safety of the school during the flood season.

Self-inspection report on flood control and typhoon prevention 4 Since the summer of this year, precipitation in our region has been relatively concentrated, especially the recent rainstorm disaster is more serious. In order to do a good job in flood control in the property management area, actively guard against possible floods, and organize flood control work in a scientific, efficient and orderly manner, this afternoon, Hong, deputy general manager of Lijiang Urban Construction Investment and Development Co., Ltd. and general manager of Lijiang Chengtou Property Management Service Co., Ltd., braved the heavy rain and made a self-inspection on flood control, disaster prevention and mitigation, and safety production in the apartment community.

According to the company's previous arrangements for safe production, we will inspect the flood prevention preparations in residential areas in detail, guide and improve all kinds of facilities and equipment, fully implement all kinds of work and measures such as flood prevention and summer safety, investigate all kinds of potential safety hazards, fully grasp the situation, and earnestly do the work first, carefully, solidly and in place. Focus on checking the implementation of community flood control emergency plan and emergency facilities and equipment for flood control and emergency rescue, and urge the responsible departments to immediately rectify the hidden dangers of flood control that may cause major safety accidents, so as to leave no dead ends or hidden dangers.

During the inspection, drainage facilities such as drainage pipe network and rainwater well are mainly cleaned and dredged, and parts that are easy to cause flood control safety problems such as power transmission lines, inclined fallen trees, fences, retaining walls, equipment rooms, billboards, basements and lightning protection devices are cleaned and dredged. All of them have carried out a comprehensive and serious inspection, requiring responsible departments and relevant responsible persons to do a good job in inspection, maintenance, repair and setting warning signs.

At the same time, He Hong stressed that all departments of the company must attach great importance to it, be vigilant, firmly establish the idea of flood control, stress safety and attach importance to safety, do a good job in flood control safety in advance, nip in the bud, and ensure the safety of people's lives and property in the community.

All responsible departments of the company are required to: first, check all kinds of pipes and channels for drainage and flood discharge in advance, repair all kinds of flood control facilities and equipment, and ensure the normal function of flood control facilities in flood season. 2. Prepare the emergency plan for flood control in advance, fully foresee all possible dangers, and start the emergency plan in time in case of danger. Third, we should strengthen the duty work in flood season, and there should be duty personnel on duty 24 hours a day in important parts of the community. Fourth, we must ensure the smooth communication information, especially the property management personnel and property management personnel to turn on the phone 24 hours a day, pay close attention to it, report it in time, and rescue and ask for help in time in case of danger. Fifth, all departments should cooperate with each other and work together to form a joint force to ensure safety.

Self-inspection report on flood control and typhoon prevention 5 In order to do a good job in flood control in 20xx and ensure the safety of people's lives and property in the jurisdiction, according to the spirit of document Jiulongpo Flood Control Office 1, street leaders attached great importance to this work, and held a special meeting on February 20xx 18 to arrange the deployment of flood control in 20xx, requiring the jurisdiction 13 community to take care of dangerous rock buildings. Now, a brief report on street flood control this year is as follows.

I. Preparation for flood control work

Start with ideological preparation, scheme preparation, team preparation and material preparation. Arrange deployment in advance, check and urge in advance, and make timely decisions to ensure that all flood control preparations are basically in place after entering the flood season.

Second, the flood control responsibility measures are relatively clear.

A relatively complete responsibility system for the chief executive of flood control work has been formed, and the responsibilities and tasks of flood control work in various departments and communities have been clarified. Since April 1, flood control personnel have been on duty, insisting on the 24-hour duty system. Leaders must be on duty in person during the main flood season. A strict responsibility system for flood control has been implemented. From the beginning of flood prevention preparations, in accordance with the requirements of the responsibility system, the criticism of this criticism and the warning of this warning always put the safety of people's lives and property above everything else, strictly guard against death, and adhere to the responsibility of those responsible for flood prevention. Maximize the safety of people's lives and property.

Three. Problems in flood control work

(1) There are temporary stalls (open-air cafes) on the fitness trails in binjiang road.

(2) There are two working boats along the river, reflecting that there are not enough ground anchors (hope to increase ground anchors).

(3) Four oil tanks in the construction dock have not been relocated (the management of the construction dock reported that they may be relocated before the flood season).

Fourth, the next flood control work arrangement

(a) according to the recent situation, further modify and improve the plan.

(two) to strengthen the training of community workers to deal with flood control work.

(3) flood control materials are ready.

Self-inspection report on flood control and typhoon prevention Yong Yang, a spokesperson for six provincial electric power companies, said that the flood control situation in the whole province is very severe this year, and 3,300 flood control pumping stations in the province have played a vital role in flood control and drainage. In order to further strengthen the enterprise's safety production management, strengthen the daily safety production supervision, prevention and emergency response system, eliminate all kinds of safety hazards to the maximum extent, and put an end to safety production accidents, our company's thermal power plant has carried out safety production self-inspection and self-correction activities in combination with the characteristics of safety production, and divided the self-inspection activities into two parts: learning and publicity. A brief report on these activities is as follows:

(A) learning and publicity

In order to improve the safety awareness and skills of power plant employees and consciously abide by the relevant regulations on safety production, in accordance with the policy of "safety first, prevention first", as a part of this safety production self-inspection, we organized all employees in the plant to carry out safety production education, and conducted in-depth publicity on the far-reaching significance of safety production, relevant safety rules and regulations, production accident cases, serious consequences caused by irregular operation, etc., requiring each employee to consciously establish safety production awareness. Grasp the safety production regulations of power plant operation, start from personal posts and daily work, and form a good atmosphere for everyone to pay attention to safety, find hidden dangers and prevent accidents in the whole plant.

(2) Self-examination and self-correction

As the thermal power plant of our company has just finished debugging and put into production and operation, and is in the familiar and running-in period of personnel and equipment, there is a high probability of production safety accidents due to various reasons, so we will focus on the organization, loopholes, hidden dangers, measures and systems of this self-inspection, which is not only a self-inspection and self-correction of a certain link, but also a thorough investigation of the whole production and operation system of the power plant, creating a good start for the safe production and operation of the power plant in the future. During the self-inspection activities, the main equipment operation and automatic protection devices related to the production operation and power system stability were inspected, the regular maintenance inspection, responsibility classification and implementation of each system equipment were comprehensively verified, the safety production rules and regulations, operating procedures, accident anticipation and emergency plans of various workshops and professions were sorted out, and external factors that may affect safety production were also inspected.

Through this safety self-inspection activity, the overall situation of safety production in our thermal power plant is relatively stable, and no potential safety hazards that may lead to major production accidents and personal injury accidents have been found, but there are still some problems in the safety production management system. For the problems found in the inspection, we will record them one by one and appoint a special person to rectify them within a time limit. If it cannot be rectified for a while, temporary remedial measures shall be taken on the premise of ensuring safety, and a system for investigating hidden dangers in production safety shall be established, and the weak links with problems shall be inspected from time to time to ensure the effectiveness of this inspection.

(3) Summary and rectification

Through the development of this self-inspection activity and the valuable opinions put forward by the leaders of your bureau after on-site inspection and guidance, some existing problems are rectified one by one, and a preliminary rectification plan is put forward:

1. There is no obvious high-voltage equipment and fire hazard identification in the oil area of the factory. After the inspection, we immediately made the danger signs of high-voltage equipment according to the relevant safety specifications, and posted and calibrated them in a reasonable position.

2. About the lack of evacuation signs at the exit. According to the relevant provisions of fire regulations on emergency evacuation, we have improved the pre-designed exit sign at the safety passage.

3, about the establishment of safety production scheduling meeting system. Since the trial operation of our factory, the production technology department has been responsible for holding a safety production coordination meeting at 5: 00 pm every day to summarize and check the operation of each system, and a special person has been appointed to take minutes.

4. Records on employee safety training. We urge employees to consciously establish safety awareness, strengthen the study of safety production skills, and accumulate and record the safety production assessment of employees through regular or irregular professional examinations, on-site simulation operations, anti-accident drills, etc., as an important part of assessing employees' work performance.

5, about the emergency rescue plan sent to your bureau for the record. We will send the rescue plan to your bureau for filing in time, and inform your bureau to update it in time when the plan changes.

6, about the establishment of safety responsibility. In the near future, a joint responsibility system for production safety will be established, and responsibility letters for production safety will be signed at different levels within the production organization system, so as to clarify individual functions and responsibilities for production safety, so that every employee can assume the responsibility of maintaining production safety and establish a sound and efficient production safety system.

Self-inspection report on flood control and typhoon prevention 7 I. General situation of the project

This project is a rain (sewage) drainage outlet plugging project from Xiamen Island to Xuhe Road. A brief summary is as follows:

1. 1 project name: rainwater (sewage) discharge outlet sewage interception project of Xiamen Island-Xu He Road (first bid section)

1.2 Construction site: Chang 'an Road, Xiamen

1.3 engineering quality requirements: qualified.

1.4 time limit requirements: the tenderer of this project requires that the time limit (the time limit for winning the contract) shall not exceed 160 calendar days.

1.5 project includes: power distribution management room, grit chamber, comprehensive pump well, electromechanical equipment project of pumping station, water and electricity installation project, etc.

Second, the contractor

Construction unit: Xiamen Water Group Co., Ltd. Design unit: Xiamen Branch of Southwest Municipal Engineering Design Institute Supervision unit: Fujian Hu Hua Civil Engineering Management Co., Ltd. Construction unit: Fujian Henderson Construction Co., Ltd.

Third, the self-examination situation

The foundation of high-pressure jet grouting pile is currently under construction in this project.

1, flood control organization:

The construction project department has set up a working group on flood control and typhoon prevention.

Team leader: Liu Fengying (commander in chief)

Deputy Head: Huang Qingbin (responsible for coordination)

Members:

2. The implementation of flood control responsibility:

Liu Fengying, the project manager, takes overall responsibility (overall command), Huang Qingbin, the project production director, and Zhang Liguo, the technical director, organize and coordinate, LAM Raymond, a full-time safety officer, and all construction personnel organize and implement, and Wang Ruichao, the company's competent leader, supervises the implementation. The responsibility for flood control is clear, and it is implemented to the management personnel and construction team of the project department.

3. Duty situation in flood season:

Arrange personnel to be on duty, inspect the construction site, arrange personnel to be on duty 24 hours a day, and turn on walkie-talkies and mobile phones around the clock to ensure smooth communication. Keep close contact with relevant departments and report to the construction site at any time.

4. Preparation of flood control plan:

At the beginning of construction, a targeted special emergency plan and flood control drill plan for flood control and typhoon prevention shall be prepared and submitted to the supervisor for review before implementation.

5, material reserves:

In terms of flood control materials preparation, the project department has prepared a proper amount of yellow sand, sacks, water pipe emergency materials and medical emergency materials; Debugging of water pumps, emergency lights, walkie-talkies and other equipment.

6. Investigation of potential safety hazards

1. The flood control command group should do a good job of safety inspection before the flood season, focusing on the inspection of mechanical equipment such as pile drivers and high-pressure pumps, on-site fences and temporary houses such as on-site offices, conference rooms and warehouses, and implement effective reinforcement measures to eliminate potential safety hazards.

2. Check the electricity facilities, power supply and electrical lines on the construction site to ensure that they are intact and have no potential safety hazards.

3. Investigate some facilities and temporary drainage channels on the construction site, and dredge the drainage channels with poor drainage in time to ensure that there is no accumulated water on the construction site and eliminate potential flood hazards.

4. Timely put the materials and equipment susceptible to typhoon in storage; Those that are not easy to be put into storage should be sorted, fixed and covered, and measures such as rain and wind should be taken. The personnel on duty shall conduct daily inspection and patrol on the safety construction of the construction site.

7. Other non-engineering measures for flood control

We organized construction personnel to hold a special meeting on flood prevention and typhoon prevention, so as to improve workers' awareness of flood prevention and typhoon prevention, conduct flood prevention safety education and make records.

8, overlay reinforcement:

Strengthen the temporary prefabricated houses and enclosures on the construction site of this project, and check the reinforcement regularly.

Self-inspection report on flood control and typhoon prevention 8 In order to do a good job in flood control this year, to ensure that all teachers and students in our school can spend the flood season safely and that school property is not damaged, this flood control work plan is formulated in combination with the actual situation of our school:

One: Basic information:

Set up a leading group for flood control

Team leader:

Deputy team leader:

Team members:

Campus drainage facilities to cope with floods;

Our school has dredged all the sewers.

1, flood control system and its implementation

The flood control system in our school has been established and put in place.

2, the improvement of flood control plan and the construction of early warning response mechanism.

Alarm procedure: school duty room-school principal-school flood control leading group-report.

3, flood control work arrangements and measures:

Set up a leading group for school flood control, responsible for school flood control, and ensure the safety of teachers and students and the loss of school property.

Do a good job in flood prevention propaganda, improve the flood prevention awareness of all teachers and students, and ensure that there are no casualties among teachers and students.

During the flood control period, adhere to the 24-hour duty, implement the duty system of leading members, and the personnel on duty should stick to their posts and not leave their posts or take over.

Check the houses and school buildings in time, leave no dead ends, and contact the school in time when problems are found.

Flood prevention and rescue team members should keep their mobile phones on, ensure smooth communication tools and contact them in time. When encountering heavy rain, they should pay attention to the rising water level in and around the campus.

During the flood season, students can leave school early according to the situation. Students can't leave school alone without parents' pick-up. Be sure to contact their parents or report to the relevant departments to ensure that there are no casualties.

Always grasp the danger. In the event of a flood disaster, the flood control team should promptly rush the school property to a safe place.

4. Implementation of various safeguard measures:

The school stored raincoats, boots, shovels and other materials, and the funds were disbursed in time.

Second, the existing problems and corrective measures:

Students don't know enough about floods, so the school strengthens education through blackboard newspapers, radio and theme class meetings.

Self-inspection report on flood control and typhoon prevention on March 25th In September, after earnestly studying the spirit of county flood control dispatching meeting, our town attached great importance to it, and immediately conveyed the spirit of provincial, municipal and county work meetings through meetings and other forms, arranged and deployed all the work, and implemented the responsibility system. The work progress is reported as follows:

First, attach great importance to and strengthen leadership.

The town party committee and government attach great importance to flood control. In order to strengthen the leadership of flood control work, the town leading group for flood control and drought relief was established, with the mayor as the leader and the leaders in charge as the deputy leader, and the cadres stationed in townships and towns and the secretary and director of the village party Committee as members. Village directors are responsible persons and early warning officers for mountain torrents. Reservoirs above small size are equipped with special inspectors, and Dashantang within the jurisdiction of each village has special personnel in charge.

Second, improve the system and carry out pre-flood preparations.

In order to do a good job in flood control in our town, the town flood control office timely improved various rules and regulations, implemented the work, did a solid job in basic work, established and improved the village-level system, and implemented measures, organizations and personnel. All the 22 administrative villages in the township have emergency plans for geological disasters and mountain torrents. Clear cards are issued and warning signs are posted. Each village has set up an emergency leading group with the village secretary as the team leader and the village director as the deputy team leader, with clear responsibilities. There are clear division of labor and regulations on the inspection of Shantang Reservoir in flood season, observation of warning water level, mass transfer routes and resettlement sites, logistics support, etc. Every village has set up an emergency team. When there is a real crisis, the emergency rescue work can be carried out smoothly and orderly, and the losses can be minimized. Since this spring, small reservoirs and mountain ponds in the town have been inspected by special personnel to find and eliminate them in time.

Three, reserve enough flood control materials, set up a rescue team.

1, timely reserve flood control materials, woven bags, wood, stones, etc. As needed.

A complete emergency excavator has been contacted.

At the same time, all the small reservoirs in the town have reserved flood control sand, stones, wood and so on. According to the requirements of "four guarantees", flood control materials should be fully prepared before the flood season. A 30-member emergency rescue team was set up with the Minister of People's Armed Forces as the team leader and town cadres, village party secretaries, directors, village cadres and militia reservists as participants.

Organize forces to check the safety of small reservoirs and ponds and check the reserve of flood control materials to ensure the realization of the "three links".

Fourth, strict discipline to ensure smooth flood control.

Strictly observe the discipline in flood season, strengthen duty, and keep personnel on duty 24 hours a day. Each village implements a zero reporting system, and the village party secretary and director do not go out in principle during the main flood season to ensure safety during the flood season.

Self-inspection report on flood control and typhoon prevention 10 According to the spirit of the document "Notice on Doing a Good Job in Flood Control and Drought Relief Headquarters" forwarded by the District Education and Sports Bureau, our school quickly organized personnel to conduct a comprehensive self-inspection and investigation of the school, actively implemented the requirements of the document, and carried out prevention and rectification work, so as to "prepare for a rainy day". The flood control work carried out by our school is now reported as follows:

One is to raise awareness and strengthen leadership.

A leading group for flood control safety led by President Gao Xiangguo was established to comprehensively organize and coordinate flood control work in schools, implement relevant responsibilities, arrange the prevention and emergency response of school safety work in flood season, and make arrangements for flood control work. We have achieved leadership, organization, unified coordination, command and responsibility.

Second, a comprehensive inspection, eliminate hidden dangers

In order to ensure that there is no danger in the school during the flood season, organize relevant personnel to conduct safety inspections on the whole school.

1. Check whether the classrooms, offices, doors, windows and roofs are leaking, and repair the leaking places. There is no rain leakage; The doors and windows of each building are also intact and there are no hidden dangers.

2. The General Affairs Department inspected the school's electricity facilities, alarm facilities, power supply and indoor and outdoor electrical circuits, and the results were all in good condition, and there was no potential safety hazard.

3. Organize personnel to inspect some facilities and drainage channels in the school and clean up the sewers with poor drainage.

Three, the system emergency plan and communication network investigation

In order to strengthen responsibilities and ensure smooth communication in flood season, our school revised relevant systems, formulated preventive measures and emergency plans, and clarified relevant responsibilities; Further revise the emergency plan for flood control of the experimental school in the industrial park, so that when there is danger in the flood season, the emergency measures are not in place, and according to the layout requirements in the emergency plan, the emergency work is effectively implemented; Teachers' and students' (parents') telephones and telephones between schools and parents are set up in each class to ensure smooth communication during flood season and ensure students' personal safety.

Fourth, strengthen safety education and improve the safety awareness of teachers and students.

Make full use of blackboard newspapers and billboards, organize teachers and students to carry out various forms of safety education, and educate teachers and students on flood control, lightning protection and rainstorm prevention, so that students can understand and master the common sense of flood control safety. Combine daily emergency evacuation drills with flood control evacuation, educate teachers and students to develop self-help and self-protection ability, and improve teachers and students' self-protection awareness and prevention skills.

Five, strengthen the investigation on duty

During the flood season, we will strengthen the system of teaching leaders and teachers on duty, adopt a 24-hour duty system and a strict duty system, implement day and night duty for key parts, pay attention to observing the changes of natural disasters during the flood season, strengthen prevention work, and report the safety situation in time.

In short, through this self-examination, our school has made preparations for flood control and danger removal from all aspects, done a good job in flood control with a highly valued mental state, conscientiously implemented the work policy of early detection, early reporting and early treatment, and regarded the safety work in flood season as an important part of school education, and paid close attention to it to ensure that school property was foolproof.

;