Intelligent system equipment installation and debugging fee standard

For ordinary projects, the construction difficulty can be increased to 10%~ 15% ~ 20% (in consultation with Party A). Those switches, program-controlled switches and other high-priced equipment with low cost are calculated at 6%~8%.

If it is a standard point, please set a project quota (there is a special software to calculate how much it will cost to do that pipe and that line). The project quota has a relatively high profit and is generally only used for government projects or relatively large projects.

For major projects, the installation and commissioning fee is basically 10- 15%, and 15% is generally selected.