Key Construction Projects in Changping District of Beijing in 2009 (click: 200 1)

Yang Yi 2009-03-2612: 47: 41Published on Focus Real Estate Network-Talking about Housing and City-Beijing Housing Forum

Key Construction Projects in Changping District of Beijing in 2009

Unit: 10,000 yuan; square meter

No. Name of the project owner, main responsible unit and person in charge, total investment, construction scale and content, and annual construction tasks.

I projects completed this year (16)

(1) Infrastructure projects (5 items)

1 changping line Phase I Land Acquisition and Demolition Area Municipal Management Committee Area Rail Office Area Municipal Management Committee Zhao Subgroup Area Rail Office Qidonglin Huilongguan Town, sha he and Nanshao Town 94984 Phase I Project (Chengnan Station to Xierqi Station) Land Acquisition and Demolition Work. It's done.

2 Changcui Road Reconstruction and Extension Project Cuicun Town Government Jiang Zong starts from He Ying East Road in the west (connected with the existing Changcui Road) and ends at Jingmi Diversion Canal (Changhuai Road)1196 in the east, with a total length of 5.5 kilometers and a red line width of 40 meters. Supporting projects such as rainwater, greening, transportation, lighting and comprehensive pipelines will be implemented simultaneously. Completed and opened to traffic.

3 Changping New Town Bangbang Ji Cheng Company Zhenbang Ji Cheng Company Linxiang Party West Area Shahe Group West Area No.3 starts from Shahe West Area1No.2 Road in the west and ends at Badaling Expressway 59 1 1 in the east, with a total length of1020m and a red line width of 50m. Completed and opened to traffic.

4 Changping New Town Bangbang Ji Cheng Company Zhenbang Ji Cheng Company Linxiang Fangshahe Group No.4 West Road starts from Shahe West District1No.2 Road in the north and ends at Maman Road 574 1 in the south, with a total length of1497m and a red line width of 35m. Completed and opened to traffic.

5 Baisha Road Reconstruction and Expansion Project Shahe Municipal Government Weng Min of Shahe Municipal Government starts from Nanfeng Road in the west and ends at 6632 Road at Shahe Airport intersection in the east. The total length of the road is 1.46 km (the red line is 60 meters wide), and rainwater, traffic, greening and lighting projects are implemented simultaneously. Completed and opened to traffic.

(2) Water conservancy and ecological engineering (3 items)

6 Banbidian Village, Huilongguan Town, Xudong, Water Affairs Bureau of Huilongguan West Sewage Interception Project Area 1 1086 Total length of pipeline 1 169 1 m. Upon completion, sewage will be collected from the areas north of the Metro, south of the Nanshahe River and east of Badaling Expressway to realize rain and sewage diversion. It's done.

7 Xu Dong Nanshao Town 3850, Water Affairs Bureau of Changping New Town Reclaimed Water Plant, has a construction scale of 20,000 tons/day, with a total construction area of 1.487 square meters, including water intake pump house, clean water tank, ultrafiltration membrane workshop, water delivery pump house and control and monitoring system, and 345 meters of reclaimed water utilization pipeline. It's done.

8 Baiyanggou Ecological Restoration Project in Liucun Town Liucun Town Government Liucun Town Government Wang Jianliu Town Baiyanggou 1492 There are 23 ecological restoration mountains, covering an area of about 65,650 square meters, and the slope safety protection is 3,326 meters. It's done.

(3) Social undertakings (2 items)

9 Ming Tombs Cultural Relics Warehouse Ming Tombs Special Zone Office Ming Tombs Special Zone Office 266 1 m2 Underground Cultural Relics Warehouse, Building 2544, Dingling Village, Changling, Zhang Yong. Put into use.

10 Shangyuan School Reconstruction and Expansion Project Shangyuan Middle School District Education Committee Li Yongsheng xing shou town Municipal Government Xu Zhengfeng Xingshou Town East Xincheng Village (formerly Shangyuan Middle School) 5800 Building 12 109 m2 comprehensive teaching building, dormitory, canteen and ancillary facilities. Put into use.

(4) Power projects (2 items)

12 Man Jing1/0kv power transmission and transformation project Changping Power Supply Company Jin Jianmin Zhenbang Ji Cheng Company Linxiang Party Zhongguancun National Engineering and Technology Innovation Base Northwest 1 1709 covers an area of about 0.5 hectares, and newly built 1 10KV substation. Put into production and send electricity.

13 Du Jun 220KV power transmission and transformation project Changping Power Supply Company Changping Power Supply Company Jin Jianmin Nanshao Town Government Xu Qiang Nanshao Town He Ying Village 24000 New 220KV substation, transformer 2× 180MVA, new 2× 2× 0.5km 220kV line 2× 2× 1.9km 65438+. Put into production and send electricity.

(five) the first-level development of land and the transformation of old villages in the old city (4 items)

14 first-level development of quande triangle Beijing dida urban construction real estate development co., ltd. baishan town government Qin Jianzhu baishan town quande village triangle 5 148 total construction area 57 100 square meters, demolition area 16000 square meters, used for secondary development of commercial and residential buildings. Complete the first-level land development and listing.

15 the first-level development of supporting houses in beiqijia industrial park was completed, and the first-level development of 42000 land in the west of baxianzhuang village, beiqijia town, Huang Jianjun was completed. 16 commercial house, cinema and management room in Erjie, Changping District Yang Fuzhi District Cultural Committee of Jia Lian Ye Wei Real Estate Development Co., Ltd. 22 150 Gulou Street, Changping District, with a total construction area of 52,669.6438+03 square meters, of which the Cultural Committee is 5,988 square meters. It's done.

17 the first-level development of the transformation of the old village of Dongerqi Village Beijing Yuan Jinxia Real Estate Development Co., Ltd. Beiqijia Town Government Huang Jianjun Beiqijia Town Dongerqi Village South 62794 Land first-level development. It's done.

Two. Projects initiated during the year (34 projects)

(1) Infrastructure projects (8 items)

17 Highway Project Changping Highway Branch Line starts from the auxiliary line of Badaling Expressway in Lixi and ends at No.29230 Jingcheng Expressway in the east, with a total length of 17. 1 km and a red line width of 40m (excluding ancillary works such as land acquisition, demolition, greening, lighting and comprehensive pipelines). Complete the main works 1 1.6km (Badaling Expressway auxiliary road-Qixing Road).

The Nanfeng Road (South Ring Road-North Ring Road) 18 road project of Mingjia Company in Changping New Town starts from the South Ring Road in the south and ends at the North Ring Road 9509 in the north, with a total length of 2. 1 km and a red line width of 60m. Simultaneously implement ancillary projects such as transportation, greening, lighting, rainwater and sewage pipelines. Complete the first bid section (South Ring North Road to Cuichang Branch Road 1 Road).

Xu Zhengfeng, the road reconstruction and expansion project of xing shou town Municipal Government of xing shou town Municipal Government in Changping District 19 Xia Tao Road (Changhuai Road-Jingfeng Highway), starts from Changhuai Highway (Taoyukou Village, xing shou town) and ends at Jingfeng Highway (Xiazhuang Village), passing through Taoyukou Village, Muchang Village, Baihe Village and Shangzhuang Village, with a total length of 24.54 kilometers, a pavement width of 7 meters and a subgrade width of 8.5 meters. Newly built bridge 16 (with a total length of 838m) and installed culverts 147. "Complete the preliminary procedures of the project and the foundation construction of some sections.

"

20 Huichang Road (South Third Street-Sixth Ring Road) Construction Project Shahe Municipal Government Weng Min of Shahe Municipal Government starts from South Third Street of Higher Education Park in the south and ends at Sixth Ring Road in the north 10567.55. The total length of the road is about 2420 meters and the red line is 50 meters wide. Simultaneously implement other comprehensive municipal pipeline projects such as rainwater, traffic, greening, lighting and sewage. Complete 42% of the total engineering quantity.

2 1 South Third Street Construction Project Shahe Municipal Government Weng Minxi starts from North Shahe Xisi Road in the west and ends at Huichang Road in the east 1 184 1.32. The total length of the road is about 308 1 m, and the red line is 40 meters wide. According to the urban secondary road standard, the cross-sectional structure of the road is two roads. Simultaneously implement other comprehensive municipal pipeline projects such as rainwater, traffic, greening, lighting and perspiration. Complete 75% of the total engineering quantity.

22 Yangfang Town Road Network Project Yangfang Town Government Yangfang Town Government Yandian Zhongyangfang Village, Xiguan City Village, Qianbaihujian Village and Houbaihujian Village 22 100 Road has a total length of 6.8 kilometers (the red line is 30 meters wide). In which: Yangfang Dongjie Road1592m; Houxi Road is 3073 meters; Houer Road1977m. Start the demolition work; Complete the main project of the second road; Construction of Houxi Road Project started.

23. Zhao Yaqun, Municipal Administration Committee of Changping District Heating Service Management District of Haozhuang Heating Plant, has a total construction area of 1352 1 m2 south of the original wall of Haozhuang Jiayuan boiler room, and four 58MW boilers are installed, with the total length of supporting pipelines of10/60m. Complete the main project and some equipment installation.

24 Nankou West District Heating Factory Changping District Heating Service Management District Municipal Management Committee Zhao Yaqun Nankou Town 19000 covers an area of 37,800 square meters, and four 35MW coal-fired hot water boilers are installed, and the supporting pipes are 8000 meters long. Complete civil engineering.

(2) Water conservancy, ecological and agricultural projects (6)

25 Changping District Zhenshun Centralized Water Supply Factory Changping Water Supply Company Changping Water Supply Company Wang Zhenguo Cuicun Town Zhenshun Village 7 158 The construction scale is 40,000 cubic meters/day, including water source wells, water pipelines, pressurized pumping stations and ancillary buildings. Complete major projects.

26. Water Affairs Bureau of Shahe Reclaimed Water Plant Xu Dongshahe Fujiafen Village 12300 Construction 1 Reclaimed Water Plant with a capacity of 30,000 tons/day. Complete the foundation construction.

27 Xu Dongbaishan Town 12 163, Water Affairs Bureau of Wande Reclaimed Water Plant and Supporting Sewage Pipe Network Project Area in Changping New Town. The construction scale is 1 10,000 tons/day in the near future and 1.85 million tons/day in the long term; A new sewage pipe network is built, with a pipe diameter of DN400-DN 1000mm and a total length of 9. 14 km. Complete major civil works.

28 Changping District, director of the National Development and Reform Commission in 2009, Beijing-Tianjin sandstorm source control project area, related town 10657, planting 6000 mu of artificial forest, closing hillsides for afforestation 3000 mu, blasting afforestation 4000 mu, artificial grass planting 4000 mu, fencing enclosure 5000 mu, 40 sets of feed machinery, greenhouse construction 654.38+0000 square meters, small watershed comprehensive.

Director of the Development and Reform Commission of Changping New Town Binhe Forest Park (Dongshahe Ecological Wetland Project) starts from the spillway of the Ming Tombs Reservoir in the north and reaches 90,000 river courses and ecological wetland construction in the south. The total length of the park is about 7.24 kilometers. Complete the topographic leveling and greening project of some plots.

30 20 12 Supporting facilities of the World Strawberry Congress and regional agricultural service centers of strawberry industry construction projects Xu Kezhong xing shou town, Cuicun Town, Xiaotangshan Town, Baishan Town and Nanshao Town plan to build 32,000 mu of strawberry production bases in 86,000, supporting water-saving irrigation, electricity, roads and field roads; Plan to build "one park and two centers", namely strawberry theme park, training and exhibition center, processing and logistics center, etc. Construction of 4,500 solar greenhouses and strawberry seedling base 1.200 mu; It is planned to complete the project, land, planning and other related procedures for the water circuit infrastructure construction of "one park and two centers" and strawberry production base.

(3) Social undertakings (5 items)

3 1 Shahe Higher Education Park, five new campuses of colleges and universities, municipal infrastructure and supporting service facilities projects, Liu Ziyu 2800000 Shahe area and Luodun Company Shahe Higher Education Park, with a planned total land area of 799.72 hectares, planned construction land of 73,363 hectares and a planned total construction area of 5,220,800 square meters. Resumed work area 1.0205438+0.000 m2, and newly started area is 398,300 m2. Among them, five colleges and universities resumed work by 3 1. 1. 1 10,000 square meters, with a new construction of 242,300 square meters; The supporting buildings in the park have resumed work of 640,000 square meters, with new construction of 6.5438+0.35 million square meters; Farmers' relocation building resumed work of 69,000 square meters, with new construction of 21.00 square meters.

32 Changping Chengguan Primary School Reconstruction and Expansion Project Chengguan Primary School District Education Committee No.3639, Xihuanli Community, Changping District, Li Yongsheng (in the former Chengguan Primary School) Construction area 10800 square meters, including office building, teaching building, canteen, playground and ancillary facilities. Complete part of the main project.

33 Xiaotangshan Central Primary School New Construction Project Xiaotangshan Central Primary School District Education Committee Li Yongsheng Xiaotangshan Town Government Zhang Xinliang Xiaotangshan Town 5743 Building area 10837 square meters, including office buildings, teaching buildings, canteens, playgrounds and ancillary facilities. Complete part of the main project.

34 Changping District Hospital Comprehensive Ward Building and Ancillary Facilities Project Changping District Hospital Yang Dongquan Changping District Hospital No.9 Gulou North Street District Hospital 12549 The new comprehensive ward building has a total construction area of 2 1705 square meters and 708 planned beds. Complete major projects.

35 Changping District Red Cross Northern Suburb Hospital Outpatient Ward Complex Building Changping District Red Cross Northern Suburb Hospital District Health Bureau Dudong Xiaokou Town Village Northwest Suburb Hospital 1088 1 total construction area of new outpatient ward complex building 19 136 square meters. Complete part of the main project.

(4) Industrial projects (10)

36 Beikong Hongchuang Changping Incubation Park Industrial Base Beijing Beikong Hongchuang Technology Co., Ltd. Zhongguancun Science Park Changping Park Management Committee Su Guiguang Zhongguancun Science Park Changping Park West Area 50000 covers an area of 60 mu and has an incubator of 80,000 square meters. Complete 50% of the main project.

37 China Petroleum Science and Technology Innovation Base China Petroleum (Beijing) Science and Technology Development Co., Ltd. Changping Branch Paul Cheng Company Linxiang Municipal Committee Zhongguancun National Engineering Technology Innovation Base has a construction area of 6.5438 0.45 million square meters, including scientific research, technology development, product research experiments and ancillary buildings. Complete the A- 12 plot (200,600 square meters) project, and complete the 70% main structure project of1.400 square meters.

38 Sany Beijing Manufacturing Center Nankou Town Government of Beijing Sany Heavy Machinery Co., Ltd. The total construction area of Zhang Jianqiang Nankou Town Industrial Zone is about 165438+ 10,000 square meters, including piling machinery division, crane division, wind power division and underground construction machinery division. The construction area is about 300,000 square meters, of which the completed and put into production area is about 6.5438+0.7 million square meters (including production building and office building).

39 Revision Pharmaceutical Beijing Pharmaceutical Science and Technology Industrial Base Beijing Revision Pharmaceutical Co., Ltd. Beiqijia Town Government Huang Jianjun "Beiqijia Town Hongfu Pioneer Park"

"60,000 new 67,000 square meters of comprehensive buildings, experimental buildings and factories. Complete part of the main project.

40 "Energy Saving and Emission Reduction" Research Base Beijing Shenwu Thermal Energy Technology Co., Ltd. Machikou Town Government 12000 Wang Li Machikou Town Beixiaoying Village has a combustion laboratory and a scientific research building with a total construction area of 80,000 square meters. Complete part of the main project.

4 1 China Petrochemical Science and Technology Research Center Director of District Development and Reform Commission of Beijing Sinopec Jing Tian Engineering Construction Co., Ltd. The planned construction area of the north side of Shunsha Road in Wengmin Shahe, Shahe City is 300,000 square meters, including three parts: Petroleum Exploration and Development Research Institute, International Exploration and Development Corporation and Petroleum Engineering Technology Research Institute. Improve the preliminary procedures and start construction.

42 Cummins Vehicle Diesel Engine Production Line Beijing Futian Cummins Engine Co., Ltd. Shahe Municipal Government Wengmin Shahe Shayang Road North 293887 newly built 89670 square meters engine production plant, depressurization station, oil depot and circulating water system to produce a new generation of light truck engines. The first line was put into production, and the second line completed the equipment installation.

43 Beijing International Conference Center Beijing Hotel Tourism Bureau Li Xiaotangshan Town Dadongliu Village has a construction area of 85,279.9 square meters, including business office area, hotels and supporting service areas, which will be implemented in three phases. Complete the first and second phases of the main project.

44 Jiuhua Water World Beijing Jiuhua Real Estate Development Co., Ltd. District Tourism Bureau Li Xiaotangshan Town Huluhe Village 58,000 building area 1.87 million square meters, including cultural leisure center and ancillary facilities. The main structure of the cultural leisure center is completed.

45 Jiuhua Comprehensive Sports Center Li Beijing Jiuhua Real Estate Development Co., Ltd. District Tourism Bureau built179,000 square meters stadium and supporting facilities at 60,000 north of Jiuhua Mountain Villa in Xiaotangshan Town. Complete the main structure of the stadium.

(5) First-class land development and old village reconstruction projects (5)

46 Mingjia Company, the first-class land development project of Changping New City East Phase II, built 564,500 square meters of houses and supporting facilities in 68000 Nanshao Town, Wang Hailing. Complete the land requisition, demolition and pre-listing preparation ofNo. 1 (17.6 hectares).

47. The first-class development and infrastructure construction project of Linxiang Party of Zhenbang Ji Cheng Company and Zhenbang Ji Cheng Company of Zhongguancun National Engineering Technology Innovation Base will be implemented in three phases: Badaling Expressway in the east, Mamam Road in the south, the planned original Bao Jing Expressway in the west and 398.88 hectares of land in the north. Carry out some infrastructure construction such as municipal roads. Complete the demolition, land requisition and resettlement of Phase I 15 1 hectare, and realize the transfer and listing of part of Phase I land; Start the third phase of the first-level development work. West 18 Road and 20 Road started construction.

Beijing Weiyexing Real Estate Development Co., Ltd. Shahe Municipal Government Wengmin Shahe Baisha Road North 8 1429 has a total area of 242.82 mu, including 14438+06 mu of construction land. Completed the main project of the 236,000 square meters relocation building.

49 Supporting Residential Quarter of Beiqi Futian Industrial Park Beiqi Foton Motor Co., Ltd. Shahe Municipal Government Wengmin Shahe Laoniuwan Village 105000 Construction of Foton Motor Workers' Houses and Farmers' Relocation Houses for Old Village Reconstruction, with a total construction area of 273,000 square meters. The capping of single buildings was completed, and the first-level development of land was completed by 80%.

50. The relocation project of Tahe New Village in Shahe, Linxiang Party of Zhenbang Ji Cheng Company and Zhenbang Ji Cheng Company has a total construction area of 226,500 square meters, including ordinary houses and supporting facilities. Obtain the approval of project establishment and land requisition, and complete the main project of 1-6 building.